Weaver-Bailey Contractors, Inc.: ARDOT bid record
Weaver-Bailey Contractors, Inc. submitted 10 bids on Arkansas DOT contracts in the data, from 13 AUG 2025 to 04 NOV 2026, and was the low bidder on 1 of them (10%). When it was not low, its total sat a median +25% above the low bid.
- Owner
- Arkansas DOT
- Low bid volume
- $53,972,317
- Latest bid
- 04 NOV 2026
- Data through
- 04 NOV 2026
By year
| Year | Bids | Low bids | Win rate |
|---|---|---|---|
| 2025 | 1 | 0 | 0% |
| 2026 | 9 | 1 | 11% |
By county
| County | Bids | Low bids | Win rate |
|---|---|---|---|
| Cross | 2 | 0 | 0% |
| Miller | 2 | 0 | 0% |
| Jefferson | 1 | 0 | 0% |
| Lonoke | 1 | 1 | 100% |
| Jackson, Lonoke, White | 1 | 0 | 0% |
| Lee | 1 | 0 | 0% |
| White | 1 | 0 | 0% |
| Crawford | 1 | 0 | 0% |
Pay items where it is most often lowest
| Pay item | Code | Unit | Lines bid | Lowest on the line | Its median price | All bidders' median |
|---|---|---|---|---|---|---|
| Enhanced thermoplastic pavement marking yellow (6") | 719602 | LF | 5 | 4 (80%) | $1.03 | $1.50 |
| Traffic drums | 604023 | EACH | 10 | 3 (30%) | $46.75 | $33.00 |
| Raised pavement markers (type II) | 721002 | EACH | 9 | 3 (33%) | $6.33 | $6.50 |
| Mineral aggregate in achm surface course (1/2") | 407162 | TON | 8 | 3 (38%) | $134.98 | $124.55 |
| Construction pavement markings | 604041 | LF | 8 | 3 (38%) | $0.22 | $0.28 |
| Grubbing | 201111 | STA | 7 | 3 (43%) | $1,307.88 | $1,700.00 |
| Reinforcing steel-roadway (grade 60) | 804003 | LB | 5 | 3 (60%) | $1.64 | $2.40 |
| Enhanced thermoplastic pavement marking white (6") | 719502 | LF | 5 | 3 (60%) | $1.06 | $1.50 |
| Signs | 604003 | SF | 10 | 2 (20%) | $12.10 | $8.40 |
| Clearing | 201011 | STA | 7 | 2 (29%) | $2,683.80 | $2,000.00 |
| Mineral aggregate in achm binder course (1") | 406161 | TON | 5 | 2 (40%) | $104.50 | $135.00 |
| Portable changeable message sign | 604078 | WEEK | 5 | 2 (40%) | $271.46 | $200.00 |
A line counts when the firm priced it and at least one other bidder did too; the lowest unit price on the line counts whoever won the contract. Token prices and bids over three times the low bid are left out.
Who it meets most
| Firm | Contracts in common | That firm ranked ahead |
|---|---|---|
| Mobley Contractors, Inc. | 4 | 2 of 4 |
| Redstone Construction Group, Inc. | 3 | 1 of 3 |
| White River Materials, Inc. | 3 | 3 of 3 |
| Robertson Contractors, Inc. | 3 | 0 of 3 |
| McGeorge Contracting Co., Inc. | 2 | 1 of 2 |
| Diamond Surface, Inc. | 2 | 2 of 2 |
| James A. Rogers Excavating, Inc. | 2 | 2 of 2 |
| Sugg Construction, Inc. | 2 | 2 of 2 |
| SN Contractors LLC | 2 | 0 of 2 |
| Delta Asphalt of Arkansas, Inc. | 2 | 2 of 2 |
Latest bids
| Let | Contract | County | Project | Rank | Its bid | Against the low bid |
|---|---|---|---|---|---|---|
| 04 NOV 2026 | 040904 | Crawford | THE PURPOSE OF THIS PROJECT IS TO CONSTRUCT GRADING AND STRUCTURES OF A FOUR - LANE INTERSTATE FACILITY, INCLUDING IMPROVEMENTS TO THE INTER | 4 of 4 | $181,218,207 | +46% |
| 12 AUG 2026 | A30046 | Miller | THE PURPOSE OF THIS PROJECT IS TO DO A CONCRETE PAVEMENT REPAIR ON INTERSTATE 30 IN MILLER COUNTY. THIS PROJECT CONSISTS OF REMOVAL AND DISP | 2 of 4 | $1,473,929 | +14% |
| 20 MAY 2026 | A30044 | Miller | THE PURPOSE OF THIS PROJECT IS TO PERFORM PATCHING AND RE-SEAL JOINTS ON APPROXIMATELY 1.111 MILES OF HIGHWAY 151 IN MILLER COUNTY. THIS PRO | 2 of 2 | $1,797,015 | +6.0% |
| 20 MAY 2026 | C73017 | White | THE PURPOSE OF THIS PROJECT IS TO CONSTRUCT 0.331 MILE OF CITY STREET IN WHITE COUNTY. THIS PROJECT CONSISTS OF CLEARING AND GRUBBING, REMOV | 3 of 5 | $732,513 | +9.0% |
| 08 APR 2026 | 110751 | Lee | THE PURPOSE OF THIS PROJECT IS TO REPLACE ONE STRUCTURE ON HIGHWAY 121 IN LEE COUNTY. THIS PROJECT CONSISTS OF CLEARING AND GRUBBING, REMOVA | 3 of 8 | $1,728,833 | +25% |
| 08 APR 2026 | 110831 | Cross | THE PURPOSE OF THIS PROJECT IS TO REPAIR A SLIDE ON HIGHWAY 42 IN CROSS COUNTY. THIS PROJECT CONSISITS OF CLEARING AND GRUBBING, REMOVAL AND | 5 of 7 | $5,999,530 | +29% |
| 08 APR 2026 | 110832 | Cross | THE PURPOSE OF THIS PROJECT IS TO REPAIR A SLIDE ON HIGHWAY 75 IN CROSS COUNTY. THIS PROJECT CONSISITS OF CLEARING AND GRUBBING, EARTHWORK, | 6 of 8 | $3,517,116 | +39% |
| 21 JAN 2026 | 061371 | Lonoke | THE PURPOSE OF THIS PROJECT IS TO RECONFIGURE THE HIGHWAY 5 INTERCHANGE AND REPLACE ONE STRUCTURE OVER I-57 IN LONOKE COUNTY. THIS PROJECT C | 1 of 4 | $53,972,317 | Low, 3.0% under the second |
| 21 JAN 2026 | AX0008 | Jackson, Lonoke, White | THE PURPOSE OF THIS PROJECT IS TO MILL, OVERLAY, AND DIAMOND GRIND ENTRANCE AND EXIT RAMPS ALONG I-57 IN JACKSON, LONOKE, AND WHITE COUNTIES | 3 of 3 | $19,145,614 | +38% |
| 13 AUG 2025 | 020628 | Jefferson | THE PURPOSE OF THIS PROJECT IS TO WIDEN APPROXIMATELY 2.008 MILES OF HIGHWAY 190 IN JEFFERSON COUNTY. THIS PROJECT CONSISTS OF CLEARING AND | 2 of 2 | $14,828,036 | +6.0% |
How this record was read
ARDOT monthly bid tab PDFs (morning and afternoon sessions), January 2022 to November 2026. Base bids are printed in whole dollars; on A+B and A+C jobs the base bid is kept, and the published rank follows the award amount.
- Every bid counted here matched its published total to within one dollar; ARDOT's rank decides who was low.
- The gap to the low bid is the firm's total over the low total, minus one, on contracts it did not win, leaving out bids over three times the low bid.
- A record covers the lettings in the data, not every contract the firm ever bid. Coverage by year is on the state page.
A name split in two, or a figure that does not match the owner's tabulation? Write to mehdi@miragemetrics.com and we correct it.
Your own bid history, read the same way
Mirage deploys AI agents for heavy civil estimating teams: quantities from the plan set, specs and addenda read, and bid tabs compared, inside your systems and your rules.