White River Materials, Inc.: ARDOT bid record
White River Materials, Inc. submitted 22 bids on Arkansas DOT contracts in the data, from 16 FEB 2022 to 04 NOV 2026, and was the low bidder on 11 of them (50%). When it was not low, its total sat a median +16% above the low bid.
- Owner
- Arkansas DOT
- Low bid volume
- $108,059,447
- Latest bid
- 04 NOV 2026
- Data through
- 04 NOV 2026
By year
| Year | Bids | Low bids | Win rate |
|---|---|---|---|
| 2022 | 3 | 3 | 100% |
| 2023 | 2 | 1 | 50% |
| 2024 | 3 | 2 | 67% |
| 2025 | 3 | 1 | 33% |
| 2026 | 11 | 4 | 36% |
By county
| County | Bids | Low bids | Win rate |
|---|---|---|---|
| Craighead | 6 | 4 | 67% |
| Independence | 4 | 3 | 75% |
| Clay | 2 | 0 | 0% |
| Cross | 2 | 1 | 50% |
| Desha, Phillips | 1 | 1 | 100% |
| Lawrence | 1 | 1 | 100% |
| Boone | 1 | 0 | 0% |
| Lee | 1 | 1 | 100% |
| Greene | 1 | 0 | 0% |
| Phillips | 1 | 0 | 0% |
| Mississippi | 1 | 0 | 0% |
| Baxter | 1 | 0 | 0% |
Pay items where it is most often lowest
| Pay item | Code | Unit | Lines bid | Lowest on the line | Its median price | All bidders' median |
|---|---|---|---|---|---|---|
| Water | 620030 | MGAL | 17 | 17 (100%) | $10.00 | $10.00 |
| Signs | 604003 | SF | 17 | 13 (76%) | $7.50 | $8.40 |
| Asphalt binder (PG 64-22) in achm surface course (1/2") (minimum bid $120.00) | 407432 | TON | 13 | 13 (100%) | $120.00 | $120.00 |
| Traffic drums | 604023 | EACH | 16 | 11 (69%) | $25.00 | $33.00 |
| Raised pavement markers (type II) | 721002 | EACH | 13 | 11 (85%) | $6.75 | $6.50 |
| Lime | 620001 | TON | 17 | 10 (59%) | $100.00 | $105.00 |
| Mineral aggregate in achm surface course (1/2") | 407162 | TON | 16 | 10 (63%) | $132.72 | $124.55 |
| Seeding | 620011 | ACRE | 16 | 10 (63%) | $1,500.00 | $1,500.00 |
| Silt fence | 621021 | LF | 15 | 10 (67%) | $3.50 | $3.68 |
| Second seeding application | 623001 | ACRE | 14 | 10 (71%) | $450.00 | $395.00 |
| Clearing | 201011 | STA | 12 | 10 (83%) | $1,049.47 | $2,000.00 |
| Mulch cover | 620022 | ACRE | 16 | 9 (56%) | $1,157.97 | $1,150.00 |
A line counts when the firm priced it and at least one other bidder did too; the lowest unit price on the line counts whoever won the contract. Token prices and bids over three times the low bid are left out.
Who it meets most
| Firm | Contracts in common | That firm ranked ahead |
|---|---|---|
| Robertson Contractors, Inc. | 8 | 4 of 8 |
| Mobley Contractors, Inc. | 7 | 1 of 7 |
| Capital Paving & Construction, LLC | 4 | 0 of 4 |
| Delta Asphalt of Arkansas, Inc. | 4 | 1 of 4 |
| Seagraves Construction, Inc. | 4 | 1 of 4 |
| Rogers Group, Inc. | 3 | 2 of 3 |
| Central Arkansas Contractors, Inc. | 3 | 1 of 3 |
| Weaver-Bailey Contractors, Inc. | 3 | 0 of 3 |
| R. L. Persons Const., Inc. | 2 | 0 of 2 |
| Kesser International, Inc. | 2 | 1 of 2 |
Latest bids
| Let | Contract | County | Project | Rank | Its bid | Against the low bid |
|---|---|---|---|---|---|---|
| 04 NOV 2026 | 050439 | Independence | THE PURPOSE OF THIS PROJECT IS TO REPLACE ONE BRIDGE ON HIGHWAY 25 IN INDEPENDENCE COUNTY. THIS PROJECT CONSISTS OF CLEARING AND GRUBBING, R | 1 of 5 | $4,165,923 | Low, 23% under the second |
| 04 NOV 2026 | 101141 | Mississippi | THE PURPOSE OF THIS PROJECT IS TO IMPROVE THE INTERSECTION ON HIGHWAYS 61 AND 140 IN MISSISSIPPI COUNTY. THIS PROJECT CONSISTS OF REMOVAL AN | 2 of 4 | $3,646,951 | 0.0% |
| 04 NOV 2026 | FA0314 | Baxter | THE PURPOSE OF THIS PROJECT IS TO RECONSTRUCT APPROXIMATELY 1.525 MILES OF COUNTY ROAD 73 IN BAXTER COUNTY. THIS PROJECT CONSISTS OF CLEARIN | 2 of 3 | $4,171,711 | +16% |
| 23 SEP 2026 | 110716 | Phillips | THE PURPOSE OF THIS PROJECT IS TO REPLACE THREE STRUCTURES ON HIGHWAYS 185 AND 318 IN PHILLIPS COUNTY. THIS PROJECT CONSISITS OF CLEARING AN | 4 of 8 | $3,716,519 | +24% |
| 24 JUN 2026 | 101189 | Craighead | THE PURPOSE OF THIS PROJECT IS TO IMPROVE THE INTERSECTION AT HIGHWAYS 18 AND 139 IN MONETTE IN CRAIGHEAD COUNTY. THIS PROJECT CONSISITS OF | 1 of 2 | $1,758,721 | Low, 2.0% under the second |
| 24 JUN 2026 | BR2814 | Greene | THE PURPOSE OF THIS PROJECT IS TO REPLACE 1 BRIDGE AND RECONSTRUCT APPROXIMATELY 0.123 MILE OF COUNTY ROAD 49 IN GREENE COUNTY. THIS PROJECT | 2 of 7 | $1,433,371 | +2.0% |
| 08 APR 2026 | 110751 | Lee | THE PURPOSE OF THIS PROJECT IS TO REPLACE ONE STRUCTURE ON HIGHWAY 121 IN LEE COUNTY. THIS PROJECT CONSISTS OF CLEARING AND GRUBBING, REMOVA | 1 of 8 | $1,385,874 | Low, 16% under the second |
| 08 APR 2026 | 110831 | Cross | THE PURPOSE OF THIS PROJECT IS TO REPAIR A SLIDE ON HIGHWAY 42 IN CROSS COUNTY. THIS PROJECT CONSISITS OF CLEARING AND GRUBBING, REMOVAL AND | 4 of 7 | $5,972,208 | +28% |
| 08 APR 2026 | 110832 | Cross | THE PURPOSE OF THIS PROJECT IS TO REPAIR A SLIDE ON HIGHWAY 75 IN CROSS COUNTY. THIS PROJECT CONSISITS OF CLEARING AND GRUBBING, EARTHWORK, | 1 of 8 | $2,537,992 | Low, 7.0% under the second |
| 21 JAN 2026 | 100881 | Craighead | THE PURPOSE OF THIS PROJECT IS TO WIDEN HIGHWAY 1B TO FIVE LANES IN CRAIGHEAD COUNTY. THIS PROJECT CONSISTS OF CLEARING AND GRUBBING, REMOVA | 2 of 3 | $6,095,468 | +4.0% |
| 21 JAN 2026 | FA1108 | Clay | THE PURPOSE OF THIS PROJECT IS TO REPLACE 1 BRIDGE AND RECONSTRUCT APPROXIMATELY 1.01 MILES OF COUNTRY ROAD 53 IN CLAY COUNTY. THIS PROJECT | 5 of 7 | $3,620,385 | +22% |
| 25 JUN 2025 | 100879 | Craighead | THE PURPOSE OF THIS PROJECT IS TO IMPROVE THE INTERSECTION AT PARKER ROAD AND HIGHWAY 49 IN CRAIGHEAD COUNTY. THIS PROJECT CONSISTS OF CLEAR | 2 of 4 | $6,888,767 | +15% |
| 21 MAY 2025 | 090581 | Boone | THE PURPOSE OF THIS PROJECT IS TO ADD PASSING LANES ON HIGHWAY 62 IN BOONE COUNTY. THIS PROJECT CONSISTS OF CLEARING AND GRUBBING, REMOVAL A | 5 of 6 | $14,429,501 | +26% |
| 21 MAY 2025 | C32005 | Independence | THE PURPOSE OF THIS PROJECT IS TO WIDEN 0.456 MILE OF MYERS STREET AND CONSTRUCT A ROUNDABOUT IN BATESVILLE IN INDEPENDENCE COUNTY. THIS PRO | 1 of 1 | $2,879,316 | Low |
| 18 SEP 2024 | 101172 | Clay | THE PURPOSE OF THIS PROJECT IS TO CONSTRUCT A NEW ACCESS-CONTROLLED DIVIDED HIGHWAY FOR APPROXIMATELY 4.019 MILES IN CLAY COUNTY. THIS PROJE | 2 of 4 | $56,636,528 | +1.0% |
| 26 JUN 2024 | 100875 | Craighead | THE PURPOSE OF THE PROJECT IS TO WIDEN TO FOUR LANES ON APPROXIMATELY 1.499 MILES OF HIGHWAY 351 WITH INTERSECTION IMPROVEMENTS IN THE CITY | 1 of 1 | $16,185,252 | Low |
| 22 MAY 2024 | 100991 | Lawrence | THE PURPOSE OF THIS PROJECT IS TO REPLACE FOUR STRUCTURES ON HIGHWAY 25 IN LAWRENCE COUNTY. THIS PROJECT CONSISTS OF CLEARING AND GRUBBING, | 1 of 3 | $7,354,822 | Low, 2.0% under the second |
| 01 NOV 2023 | 050478 | Independence | THE PURPOSE OF THIS PROJECT IS TO WIDEN APPROXIMATELY 845.57 FT OF HIGHWAY 167 IN INDEPENDENCE COUNTY. THIS PROJECT CONSISTS OF CLEARING AND | 1 of 1 | $1,583,546 | Low |
| 17 MAY 2023 | 050466 | Independence | THE PURPOSE OF THIS PROJECT IS TO REPAIR A SLIDE ON HIGHWAY 167 IN INDEPENDENCE COUNTY OF APPROXIMATELY 0.080 MILE. THIS PROJECT CONSISTS OF | 2 of 4 | $801,868 | +20% |
| 09 NOV 2022 | A10014 | Desha, Phillips | THE PURPOSE OF THIS PROJECT IS TO LEVEL WITH ACHM SURFACE COURSE AND APPLY AN ASPHALT SURFACE TREATMENT ON APPROXIMATELY 24.133 MILES OF HIG | 1 of 1 | $8,451,733 | Low |
| 09 NOV 2022 | 100657 | Craighead | THE PURPOSE OF THIS PROJECT IS TO WIDEN AND EXTEND APPROXIMATELY 4.497 MILES OF HIGHWAY 18S IN CRAIGHEAD COUNTY. THIS PROJECT CONSISTS OF CL | 1 of 1 | $61,110,471 | Low |
| 16 FEB 2022 | 101062 | Craighead | THE PURPOSE OF THIS PROJECT IS TO INSTALL A TRAFFIC SIGNAL ON HWY. 18 AND QUALITY WAY IN THE CITY OF JONESBORO IN CRAIGHEAD COUNTY. THIS PRO | 1 of 2 | $645,797 | Low, 30% under the second |
How this record was read
ARDOT monthly bid tab PDFs (morning and afternoon sessions), January 2022 to November 2026. Base bids are printed in whole dollars; on A+B and A+C jobs the base bid is kept, and the published rank follows the award amount.
- Every bid counted here matched its published total to within one dollar; ARDOT's rank decides who was low.
- The gap to the low bid is the firm's total over the low total, minus one, on contracts it did not win, leaving out bids over three times the low bid.
- A record covers the lettings in the data, not every contract the firm ever bid. Coverage by year is on the state page.
A name split in two, or a figure that does not match the owner's tabulation? Write to mehdi@miragemetrics.com and we correct it.