ARDOT contract 090581 bid tabulation
THE PURPOSE OF THIS PROJECT IS TO ADD PASSING LANES ON HIGHWAY 62 IN BOONE COUNTY. THIS PROJECT CONSISTS OF CLEARING AND GRUBBING, REMOVAL AND DISPOSAL ITEMS, EARTHWORK, ACHM BASE, BINDER, AND SURFACE COURSES, ACHM PATCHING OF EXISTING ROADWAY, MAINTENANCE OF TRAFFIC, MINOR DRAINAGE, EROSION CONTROL, RUMBLE STRIPS, PAVEMENT MARKING, AND MISC. ITEMS. Let by Arkansas DOT on May 21, 2025, Boone. 6 bids received; low bid $11,458,404 by McGeorge Contracting Co., Inc..
- Owner
- Arkansas DOT
- Letting
- 21 MAY 2025
- Pay items
- 83
- Data through
- 04 NOV 2026
Bidders
| Rank | Bidder | Total bid | Against the low bid |
|---|---|---|---|
| 1 | McGeorge Contracting Co., Inc. | $11,458,404 | Low |
| 2 | Grant Garrett Excavating, Inc. | $12,697,143 | +11% |
| 3 | Crouse Construction Co. | $13,085,190 | +14% |
| 4 | Apac-Central, Inc. | $13,129,730 | +15% |
| 5 | White River Materials, Inc. | $14,429,501 | +26% |
| 6 | Capital Paving & Construction, LLC | $15,993,781 | +40% |
Bid tabulation
| Line | Pay item | Unit | Quantity | 1. McGeorge Contracting Co., Inc. | 2. Grant Garrett Excavating, Inc. | 3. Crouse Construction Co. | 4. Apac-Central, Inc. | 5. White River Materials, Inc. | 6. Capital Paving & Construction, LLC |
|---|---|---|---|---|---|---|---|---|---|
| 0001 | Clearing (201012) | STA | 60 | $331.23 | $1,484.28 | $2,000.00 | $250.00 | $575.11 | $785.00 |
| 0002 | Grubbing (201111) | STA | 60 | $331.23 | $1,484.37 | $2,000.00 | $250.00 | $575.11 | $2,156.00 |
| 0003 | Removal and disposal of fence (202011) | LF | 15,025 | $1.88 | $2.13 | $5.00 | $1.75 | $2.61 | $1.50 |
| 0004 | Removal and disposal of gates (202017) | EACH | 4 | $468.76 | $250.18 | $500.00 | $900.00 | $352.88 | $471.00 |
| 0005 | Removal and disposal of pipe culverts (202096) | EACH | 12 | $375.01 | $1,525.39 | $500.00 | $1,200.00 | $332.32 | $1,386.00 |
| 0006 | Removal and disposal of headwalls (202099) | EACH | 15 | $375.01 | $1,148.43 | $1,200.00 | $1,250.00 | $1,102.03 | $2,181.00 |
| 0007 | Flowable select material (206021) | CY | 294 | $1.34 | $288.03 | $5.00 | $250.00 | $115.41 | $345.00 |
| 0008 | Unclassified excavation (210213) | CY | 125,501 | $8.95 | $7.65 | $15.00 | $18.25 | $21.42 | $22.90 |
| 0009 | Compacted embankment (210611) | CY | 195,624 | $10.95 | $8.41 | $16.00 | $9.00 | $14.25 | $13.90 |
| 0010 | Removing and replacing topsoil (210672) | CY | 23,160 | $8.12 | $10.59 | $9.00 | $22.00 | $6.02 | $14.50 |
| 0011 | Soil stabilization (210702) | TON | 750 | $1.48 | $377.56 | $2.00 | $40.00 | $406.78 | $365.00 |
| 0012 | Aggregate base course (class 7) (303117) | TON | 40,888 | $24.41 | $29.14 | $25.00 | $25.00 | $24.83 | $23.65 |
| 0013 | Tack coat (401011) | GAL | 8,883 | $3.75 | $3.50 | $3.00 | $3.25 | $3.75 | $3.30 |
| 0014 | Mineral aggregate in achm base course (1 1/2") (405161) | TON | 4,092 | $80.04 | $103.77 | $88.00 | $85.00 | $80.04 | $96.40 |
| 0015 | Asphalt binder (PG 64-22) in achm base course (1 1/2") (minimum bid $120.00) (405402) | TON | 184 | $120.00 | $120.00 | $120.00 | $120.00 | $120.00 | $130.00 |
| 0016 | Mineral aggregate in achm binder course (1") (406161) | TON | 13,878 | $82.47 | $107.26 | $91.00 | $93.00 | $82.47 | $99.60 |
| 0017 | Asphalt binder (PG 64-22) in achm binder course (1") (minimum bid $120.00) (406402) | TON | 639 | $120.00 | $120.00 | $120.00 | $120.00 | $120.00 | $130.00 |
| 0018 | Mineral aggregate in achm surface course (1/2") (407162) | TON | 15,269 | $97.18 | $113.10 | $96.00 | $102.00 | $97.18 | $105.00 |
| 0019 | Asphalt binder (PG 64-22) in achm surface course (1/2") (minimum bid $120.00) (407432) | TON | 992 | $120.00 | $120.00 | $120.00 | $120.00 | $120.00 | $130.00 |
| 0020 | Cold milling asphalt pavement (412002) | SY | 444 | $17.76 | $27.98 | $24.00 | $25.00 | $17.76 | $26.00 |
| 0021 | Asphalt concrete patching for maintenance of traffic (414011) | TON | 45 | $552.01 | $466.36 | $400.00 | $250.00 | $200.00 | $433.00 |
| 0022 | Achm patching of existing roadway (415011) | TON | 25 | $200.00 | $466.36 | $400.00 | $350.00 | $200.00 | $433.00 |
| 0023 | Mobilization (unit bid amount may not exceed 5% of subtotal) (601001) | LS | 1 | $300,250 | $600,000 | $615,000 | $625,000 | $626,819 | $750,000 |
| 0024 | Furnishing field office (602011) | EACH | 1 | $52,859 | $140,309 | $25,000 | $25,000 | $48,477 | $150,000 |
| 0025 | Maintenance of traffic (603009) | LS | 1 | $589,328 | $196,847 | $400,000 | $550,000 | $763,232 | $550,000 |
| 0026 | 18" temporary culvert (603018) | LF | 88 | $63.24 | $92.91 | $80.00 | $175.00 | $81.60 | $311.00 |
| 0027 | Signs (604003) | SF | 797 | $4.00 | $4.66 | $8.00 | $8.69 | $4.00 | $4.30 |
| 0028 | Construction project information sign update (604010) | EACH | 1 | $75.00 | $87.44 | $100.00 | $108.59 | $75.00 | $81.20 |
| 0029 | Barricades (604013) | LF | 512 | $16.00 | $18.66 | $20.00 | $21.72 | $16.00 | $17.30 |
| 0030 | Traffic drums (604023) | EACH | 371 | $25.00 | $29.14 | $30.00 | $32.58 | $25.00 | $27.10 |
| 0031 | Furnishing and installing precast concrete barrier (604031) | LF | 1,534 | $50.00 | $58.15 | $50.00 | $41.00 | $79.17 | $54.20 |
| 0032 | Relocating precast concrete barrier (max. bid 25% of item number ) (604036) | LF | 1,318 | $9.00 | $10.46 | $9.00 | $6.00 | $19.50 | $9.80 |
| 0033 | Construction pavement markings (604041) | LF | 18,220 | $0.20 | $0.23 | $0.55 | $0.60 | $0.20 | $0.22 |
| 0034 | Removal of construction pavement markings (604055) | LF | 800 | $1.00 | $1.17 | $1.00 | $1.09 | $1.00 | $1.10 |
| 0035 | Vertical panels (604083) | EACH | 215 | $25.00 | $29.14 | $40.00 | $43.43 | $25.00 | $27.10 |
| 0036 | Concrete ditch paving (type B) (605012) | SY | 3,326 | $151.21 | $96.70 | $90.00 | $99.00 | $152.46 | $117.00 |
| 0037 | 24" reinforced concrete pipe culverts (class III) (605606) | LF | 1,143 | $130.73 | $153.73 | $120.00 | $204.50 | $131.16 | $122.00 |
| 0038 | 36" reinforced concrete pipe culverts (class III) (605616) | LF | 98 | $176.33 | $270.21 | $175.00 | $410.00 | $241.99 | $294.00 |
| 0039 | 24" flared end sections for reinforced concrete pipe culverts (605858) | EACH | 16 | $2,046.46 | $2,536.15 | $2,500.00 | $5,200.00 | $2,320.66 | $4,344.00 |
| 0040 | 36" flared end sections for reinforced concrete pipe culverts (605862) | EACH | 2 | $3,590.10 | $3,908.42 | $3,500.00 | $6,500.00 | $4,502.62 | $6,446.00 |
| 0041 | Culvert clean out (606002) | EACH | 8 | $327.01 | $1,250.19 | $1,000.00 | $5,200.00 | $852.17 | $3,129.00 |
| 0042 | 18" side drain (606703) | LF | 404 | $66.76 | $110.98 | $80.00 | $252.00 | $62.65 | $121.00 |
| 0043 | 24" side drain (606704) | LF | 52 | $79.22 | $140.93 | $90.00 | $390.00 | $71.14 | $191.00 |
| 0044 | 30" side drain (606705) | LF | 135 | $94.94 | $172.33 | $125.00 | $335.00 | $87.17 | $205.00 |
| 0045 | Selected pipe bedding (606994) | CY | 150 | $47.39 | $85.67 | $1.00 | $35.00 | $43.21 | $283.00 |
| 0046 | Drop inlets (type ST) (609138) | EACH | 3 | $7,800.25 | $8,225.96 | $10,000 | $11,500 | $7,500.00 | $28,750 |
| 0047 | Junction boxes (type E) (609215) | EACH | 2 | $7,544.74 | $8,225.96 | $10,000 | $11,000 | $7,000.00 | $29,578 |
| 0048 | Yard drains (609511) | EACH | 20 | $1,158.67 | $5,473.00 | $3,000.00 | $1,000.00 | $1,442.15 | $3,363.00 |
| 0049 | 4" pipe underdrains (611008) | LF | 10,860 | $9.78 | $30.67 | $5.00 | $23.00 | $6.71 | $16.00 |
| 0050 | Underdrain outlet protectors (611013) | EACH | 45 | $123.51 | $2,513.01 | $20.00 | $260.00 | $476.52 | $3,000.00 |
| 0051 | Wire fence (type C) (619027) | LF | 3,785 | $7.78 | $9.07 | $6.89 | $7.48 | $7.78 | $8.40 |
| 0052 | Lime (620001) | TON | 81 | $80.00 | $99.10 | $45.00 | $48.86 | $85.00 | $92.10 |
| 0053 | Seeding (620011) | ACRE | 40.50 | $1,390.00 | $1,694.27 | $1,286.35 | $1,396.81 | $1,450.00 | $1,570.00 |
| 0054 | Mulch cover (620022) | ACRE | 120 | $975.00 | $1,165.89 | $1,018.47 | $1,105.92 | $1,000.00 | $1,083.00 |
| 0055 | Water (620030) | MGAL | 5,798 | $17.93 | $5.81 | $5.00 | $5.43 | $5.00 | $5.40 |
| 0056 | Temporary seeding (621001) | ACRE | 79.50 | $690.00 | $816.12 | $685.13 | $743.96 | $700.00 | $758.00 |
| 0057 | Silt fence (621021) | LF | 3,770 | $3.50 | $4.08 | $3.68 | $4.00 | $3.50 | $3.80 |
| 0058 | Sand bag ditch checks (621031) | BAG | 178 | $10.00 | $11.65 | $13.35 | $14.50 | $10.00 | $10.80 |
| 0059 | Sediment basin (621071) | CY | 376 | $10.46 | $5.41 | $1.00 | $41.00 | $12.43 | $40.50 |
| 0060 | Obliteration of sediment basin (621101) | CY | 200 | $10.46 | $43.42 | $1.00 | $60.00 | $12.99 | $113.00 |
| 0061 | Sediment removal and disposal (621111) | CY | 759 | $10.47 | $18.59 | $1.00 | $30.00 | $0.26 | $11.20 |
| 0062 | Pipe for slope drains (621131) | LF | 200 | $37.25 | $149.79 | $30.00 | $50.00 | $49.27 | $99.90 |
| 0063 | Rock ditch checks (621151) | CY | 195 | $46.37 | $100.98 | $70.00 | $60.00 | $62.09 | $391.00 |
| 0064 | Filter sock (12") (621168) | LF | 131 | $8.60 | $10.50 | $16.85 | $18.30 | $9.00 | $9.80 |
| 0065 | Second seeding application (623001) | ACRE | 40.50 | $250.00 | $349.77 | $375.00 | $407.20 | $300.00 | $325.00 |
| 0066 | Solid sodding (624001) | SY | 3,591 | $5.00 | $6.13 | $4.13 | $4.48 | $7.08 | $5.70 |
| 0067 | Erosion control matting (class 3) (626003) | SY | 4,257 | $5.95 | $6.94 | $5.89 | $6.40 | $5.95 | $6.40 |
| 0068 | Concrete curb (type B) (634102) | LF | 400 | $111.29 | $29.87 | $80.00 | $60.00 | $40.00 | $82.80 |
| 0069 | Roadway construction control (635001) | LS | 1 | $396,514 | $510,714 | $60,000 | $96,411 | $377,780 | $365,000 |
| 0070 | Mailboxes (637001) | EACH | 3 | $40.00 | $46.64 | $100.00 | $108.59 | $40.00 | $43.30 |
| 0071 | Mailbox supports (single) (637017) | EACH | 1 | $110.00 | $128.24 | $200.00 | $217.17 | $110.00 | $119.00 |
| 0072 | Mailbox supports (double) (637018) | EACH | 1 | $165.00 | $192.37 | $250.00 | $271.47 | $165.00 | $179.00 |
| 0073 | Rumble strips in asphalt shoulders (642001) | LF | 17,920 | $0.25 | $0.29 | $0.90 | $0.43 | $0.25 | $0.27 |
| 0074 | Thermoplastic pavement marking white (6") (719002) | LF | 28,480 | $0.94 | $0.88 | $0.77 | $0.84 | $0.75 | $0.81 |
| 0075 | Thermoplastic pavement marking yellow (6") (719102) | LF | 38,058 | $0.71 | $0.88 | $0.77 | $0.84 | $0.75 | $0.81 |
| 0076 | Thermoplastic pavement marking (arrows) (719202) | EACH | 4 | $280.00 | $326.45 | $750.00 | $814.40 | $280.00 | $303.00 |
| 0077 | Raised pavement markers (type II) (721002) | EACH | 282 | $3.72 | $5.83 | $7.00 | $7.60 | $5.00 | $5.40 |
| 0078 | Unclassified excavation for structures-roadway (801101) | CY | 188 | $128.98 | $36.79 | $175.00 | $300.00 | $150.00 | $394.00 |
| 0079 | Class S concrete-roadway (802012) | CY | 332.64 | $1,803.80 | $1,229.96 | $1,400.00 | $1,500.00 | $1,476.39 | $1,665.00 |
| 0080 | Reinforcing steel-roadway (grade 60) (804003) | LB | 43,046 | $0.89 | $3.73 | $2.00 | $0.50 | $2.85 | $3.10 |
| 0081 | Filter blanket (816003) | SY | 972 | $5.87 | $11.05 | $5.00 | $4.00 | $3.49 | $9.90 |
| 0082 | Dumped riprap (816111) | CY | 497 | $76.85 | $138.68 | $125.00 | $70.00 | $63.50 | $174.00 |
| 0083 | 16' steel gates (619332) | EACH | 1 | $650.00 | $850.00 | $16,500 | $17,917 | $700.00 | $758.00 |
The pay item list has one row per line (item, description, unit, quantity, the low bidder's unit price), the flat layout estimating software imports. Pay items with a page of their own open their price history.
Source
Read from ARDOT's tabulation for this contract. ARDOT monthly bid tab PDFs (morning and afternoon sessions), January 2022 to November 2026. Base bids are printed in whole dollars; on A+B and A+C jobs the base bid is kept, and the published rank follows the award amount.
Every contract let that day: ARDOT letting of May 21, 2025. Compiled by Mirage Metrics.
Your own bid history, read the same way
Mirage deploys AI agents for heavy civil estimating teams: quantities from the plan set, specs and addenda read, and bid tabs compared, inside your systems and your rules.