McGeorge Contracting Co., Inc.: ARDOT bid record

McGeorge Contracting Co., Inc. submitted 15 bids on Arkansas DOT contracts in the data, from 10 AUG 2022 to 04 NOV 2026, and was the low bidder on 6 of them (40%). When it was not low, its total sat a median +21% above the low bid.

Owner
Arkansas DOT
Low bid volume
$118,911,038
Latest bid
04 NOV 2026
Data through
04 NOV 2026
15Bids
6Low bids
40Win rate, percent
+21%Median gap to the low bid when not low, 9 bids

By year

YearBidsLow bidsWin rate
20222150%
20235120%
202422100%
20253133%
20263133%
McGeorge Contracting Co., Inc., ARDOT: bids and low bids by year of letting

By county

CountyBidsLow bidsWin rate
Crawford200%
Clark11100%
Perry100%
Jefferson100%
Garland100%
Clark, Hot Spring11100%
Saline100%
Benton, Washington100%
Hempstead11100%
Conway11100%
Boone11100%
Pulaski100%
McGeorge Contracting Co., Inc., ARDOT: bids and low bids by county

Pay items where it is most often lowest

Pay itemCodeUnitLines bidLowest on the lineIts median priceAll bidders' median
Silt fence621021LF1414 (100%)$3.25$3.68
Signs604003SF1411 (79%)$8.00$8.40
Water620030MGAL1411 (79%)$7.50$10.00
Temporary seeding621001ACRE1411 (79%)$700.00$805.89
Raised pavement markers (type II)721002EACH1311 (85%)$7.00$6.50
Second seeding application623001ACRE1311 (85%)$250.00$395.00
Construction pavement markings604041LF1211 (92%)$0.22$0.28
Barricades604013LF1211 (92%)$20.00$25.00
Thermoplastic pavement marking yellow (6")719102LF1111 (100%)$0.80$0.85
Mulch cover620022ACRE1410 (71%)$955.74$1,150.00
Lime620001TON1410 (71%)$75.00$105.00
Solid sodding624001SY1410 (71%)$4.64$8.25
McGeorge Contracting Co., Inc., ARDOT: pay items where its unit price was the lowest on the line

A line counts when the firm priced it and at least one other bidder did too; the lowest unit price on the line counts whoever won the contract. Token prices and bids over three times the low bid are left out.

Who it meets most

FirmContracts in commonThat firm ranked ahead
Hardrock Construction, Inc.32 of 3
Capital Paving & Construction, LLC30 of 3
Grant Garrett Excavating, Inc.31 of 3
Blackstone Construction, LLC21 of 2
Kiewit Infrastructure South Co.21 of 2
Emery Sapp & Sons, Inc.22 of 2
Webber, LLC21 of 2
WL Bass Construction, Inc.20 of 2
Robinson Construction, LLC21 of 2
Redstone Construction Group, Inc.21 of 2
McGeorge Contracting Co., Inc., ARDOT: the firms on the same contracts most often

Latest bids

LetContractCountyProjectRankIts bidAgainst the low bid
04 NOV 2026040904CrawfordTHE PURPOSE OF THIS PROJECT IS TO CONSTRUCT GRADING AND STRUCTURES OF A FOUR - LANE INTERSTATE FACILITY, INCLUDING IMPROVEMENTS TO THE INTER3 of 4$158,287,161+27%
12 AUG 2026030531Little RiverTHE PURPOSE OF THIS PROJECT IS TO RAISE THE ROADWAY GRADE ON HIGHWAY 71 IN LITTLE RIVER COUNTY. THIS PROJECT CONSISTS OF CLEARING AND GRUBBI1 of 6$17,063,675Low, 26% under the second
21 JAN 2026061371LonokeTHE PURPOSE OF THIS PROJECT IS TO RECONFIGURE THE HIGHWAY 5 INTERCHANGE AND REPLACE ONE STRUCTURE OVER I-57 IN LONOKE COUNTY. THIS PROJECT C4 of 4$64,570,218+20%
17 SEP 2025061510PulaskiTHE PURPOSE OF THIS PROJECT IS TO MAKE IMPROVEMENTS TO THE EXISTING TRAFFIC SIGNAL AT HIGHWAY 70 AND UNIVERSITY AVE. INTERSECTION IN THE CIT2 of 2$3,774,221+73%
13 AUG 2025040885CrawfordTHE PURPOSE OF THIS PROJECT IS TO LEVEL WITH ACHM SURFACE COURSE AND NOTCH AND WIDEN APPROXIMATELY 0.131 MILES, WITH APPROXIMATELY 0.248 OF 4 of 5$5,428,622+52%
21 MAY 2025090581BooneTHE PURPOSE OF THIS PROJECT IS TO ADD PASSING LANES ON HIGHWAY 62 IN BOONE COUNTY. THIS PROJECT CONSISTS OF CLEARING AND GRUBBING, REMOVAL A1 of 6$11,458,404Low, 11% under the second
22 MAY 2024080711ConwayTHE PURPOSE OF THIS PROJECT IS TO RELOCATE APPROXIMATELY 2.367 MILES OF HIGHWAY 113 IN CONWAY COUNTY. THIS PROJECT CONSISTS OF REMOVAL AND D1 of 5$9,713,434Low, 1.0% under the second
28 FEB 2024030529HempsteadTHE PURPOSE OF THIS PROJECT IS TO REPLACE THREE STRUCTURES ON HIGHWAY 195 IN HEMPSTEAD COUNTY. THIS PROJECT CONSISTS OF CLEARING AND GRUBBIN1 of 3$2,993,817Low, 5.0% under the second
01 NOV 2023061508SalineTHE PURPOSE OF THIS PROJECT IS TO WIDEN WITH BIKE LANES ON APPROXIMATELY 1.192 MILES OF HIGHWAY 5 IN SALINE COUNTY. THIS PROJECT CONSISTS OF2 of 2$19,770,072-5.0%
01 NOV 2023012326Benton, WashingtonTHE PURPOSE OF THIS PROJECT IS TO CONSTRUCT APPROXIMATELY 6.919 MILES OF FOUR LANE ROADWAY WITH BRIDGE STRUCTURES ON HIGHWAY 612 IN WASHINGT2 of 3$219,437,081+21%
20 SEP 2023061439GarlandTHE PURPOSE OF THIS PROJECT IS TO PROVIDE GEOMETRIC IMPROVEMENTS, CONSTRUCTION OF A CENTER TURN LANE, SHOULDER WIDENING, AND POLYMER OVERLAY3 of 3$13,089,730+9.0%
20 SEP 2023012275Clark, Hot SpringTHE PURPOSE OF THIS PROJECT IS TO CONSTRUCT PASSING LANES ON HIGHWAY 7 IN CLARK AND HOT SPRING COUNTIES. THIS PROJECT CONSISTS OF CLEARING A1 of 1$21,568,678Low
16 AUG 2023020626JeffersonTHE PURPOSE OF THIS PROJECT IS TO WIDEN APPROXIMATELY 4.759 MILES OF HIGHWAYS 270 AND 365S IN JEFFERSON COUNTY. THIS PROJECT CONSISTS OF CLE2 of 3$45,160,7390.0%
09 NOV 2022FA5309PerryTHE PURPOSE OF THIS PROJECT IS TO RECONSTRUCT APPROXIMATELY 3.15 MILES OF COUNTY ROAD 14 IN PERRY COUNTY. THIS PROJECT CONSISTS OF CLEARING 4 of 4$4,425,966+53%
10 AUG 2022070442ClarkTHE PURPOSE OF THIS PROJECT IS TO CONSTRUCT APPROXIMATELY 4.302 MILES OF HIGHWAYS 67 AND 51 IN CLARK COUNTY. THIS PROJECT CONSIST OF TWO PAV1 of 3$56,113,030Low, 10% under the second
McGeorge Contracting Co., Inc.: latest ARDOT bids in the data

How this record was read

ARDOT monthly bid tab PDFs (morning and afternoon sessions), January 2022 to November 2026. Base bids are printed in whole dollars; on A+B and A+C jobs the base bid is kept, and the published rank follows the award amount.

  • Every bid counted here matched its published total to within one dollar; ARDOT's rank decides who was low.
  • The gap to the low bid is the firm's total over the low total, minus one, on contracts it did not win, leaving out bids over three times the low bid.
  • A record covers the lettings in the data, not every contract the firm ever bid. Coverage by year is on the state page.

A name split in two, or a figure that does not match the owner's tabulation? Write to mehdi@miragemetrics.com and we correct it.

Your own bid history, read the same way

Mirage deploys AI agents for heavy civil estimating teams: quantities from the plan set, specs and addenda read, and bid tabs compared, inside your systems and your rules.

We use your email to reply to you and, now and then, to tell you about Mirage. You can opt out at any time. Privacy policy