ARDOT letting results, August 12, 2026
6 contracts let by Arkansas DOT on August 12, 2026, $23,681,423 in low bids, a median of 2.5 bidders per contract.
- Owner
- Arkansas DOT
- Contracts
- 6
- Low bids, total
- $23,681,423
- Data through
- 04 NOV 2026
Contracts let that day
| Contract | Project | County | Bids | Low bidder | Low bid | Second bid | Gap | Source |
|---|---|---|---|---|---|---|---|---|
| 030531 | THE PURPOSE OF THIS PROJECT IS TO RAISE THE ROADWAY GRADE ON HIGHWAY 71 IN LITTLE RIVER COUNTY. THIS PROJECT CONSISTS OF CLEARING AND GRUBBING, REMOVAL AND DISP | Little River | 6 | McGeorge Contracting Co., Inc. | $17,063,675 | $21,448,418 | +26% | ARDOT |
| 012535 | THE PURPOSE OF THIS PROJECT IS TO REPLACE OVERHEAD/GROUND MOUNTED SIGNS AND FOUR OVERHEAD STRUCTURES IN VARIOUS INTERSTATES IN VARIOUS COUNTIES. THIS PROJECT CO | Conway, Faulkner, Pulaski | 1 | Creative Design Concepts, Inc. | $2,728,515 | ARDOT | ||
| 090702 | THE PURPOSE OF THIS PROJECT IS SAFETY IMPROVEMENTS AT THE INTERSECTION OF HIGHWAY 72 AND PLENTYWOOD ROAD IN BENTON COUNTY. THIS PROJECT CONSISTS OF CLEARING AND | Benton | 3 | Apac-Central, Inc. | $1,423,994 | $1,689,469 | +19% | ARDOT |
| A30046 | THE PURPOSE OF THIS PROJECT IS TO DO A CONCRETE PAVEMENT REPAIR ON INTERSTATE 30 IN MILLER COUNTY. THIS PROJECT CONSISTS OF REMOVAL AND DISPOSAL OF CONCRETE PAV | Miller | 4 | Emery Sapp & Sons, Inc. | $1,295,377 | $1,473,929 | +14% | ARDOT |
| SA5865 | THE PURPOSE OF THIS PROJECT IS TO OVERLAY APPROXIMATELY 4.23 MILES OF HUDSON ROAD IN POPE COUNTY. THIS PROJECT CONSISTS OF AGGREGATE BASE COURSE, ACHM SURFACE C | Pope | 1 | Blackstone Construction, LLC | $929,781 | ARDOT | ||
| SA5143 | THE PURPOSE OF THIS PROJECT IS TO OVERLAY APPROXIMATELY 1.37 MILES OF GLADDEN ST. IN NEWTON COUNTY. THIS PROJECT CONSISTS OF AGGREGATE BASE COURSE, ACHM SURFACE | Newton | 2 | Apac-Central, Inc. | $240,081 | $356,236 | +48% | ARDOT |
Gap is the second bid over the low bid. Where a contract shows fewer bids than ARDOT received, the others did not match their published totals and are left out. Each contract number opens its full bid tabulation.