Blackstone Construction, LLC: ARDOT bid record
Blackstone Construction, LLC submitted 96 bids on Arkansas DOT contracts in the data, from 12 JAN 2022 to 04 NOV 2026, and was the low bidder on 68 of them (71%). When it was not low, its total sat a median +13% above the low bid.
- Owner
- Arkansas DOT
- Low bid volume
- $275,884,753
- Latest bid
- 04 NOV 2026
- Data through
- 04 NOV 2026
By year
| Year | Bids | Low bids | Win rate |
|---|---|---|---|
| 2022 | 24 | 16 | 67% |
| 2023 | 21 | 13 | 62% |
| 2024 | 16 | 13 | 81% |
| 2025 | 15 | 10 | 67% |
| 2026 | 20 | 16 | 80% |
By county
| County | Bids | Low bids | Win rate |
|---|---|---|---|
| Pope | 14 | 14 | 100% |
| Conway | 11 | 5 | 45% |
| Perry | 9 | 4 | 44% |
| Yell | 9 | 7 | 78% |
| Scott | 6 | 5 | 83% |
| Newton | 5 | 1 | 20% |
| Logan | 5 | 5 | 100% |
| Polk | 5 | 5 | 100% |
| Montgomery | 4 | 4 | 100% |
| Franklin | 4 | 1 | 25% |
| Johnson | 3 | 3 | 100% |
| Faulkner | 3 | 1 | 33% |
Pay items where it is most often lowest
| Pay item | Code | Unit | Lines bid | Lowest on the line | Its median price | All bidders' median |
|---|---|---|---|---|---|---|
| Achm patching of existing roadway | 415011 | TON | 63 | 33 (52%) | $200.00 | $250.00 |
| Signs | 604003 | SF | 67 | 23 (34%) | $10.00 | $8.40 |
| Asphalt binder (PG 64-22) in achm surface course (3/8") (minimum bid $120.00) | 407431 | TON | 32 | 21 (66%) | $120.00 | $120.00 |
| Asphalt binder (PG 64-22) in achm surface course (1/2") (minimum bid $120.00) | 407432 | TON | 26 | 20 (77%) | $120.00 | $120.00 |
| Mineral aggregate in achm surface course (1/2") | 407162 | TON | 33 | 18 (55%) | $113.17 | $124.55 |
| Cold milling asphalt pavement | 412002 | SY | 36 | 17 (47%) | $4.96 | $8.00 |
| Thermoplastic pavement marking yellow (6") | 719102 | LF | 27 | 15 (56%) | $1.05 | $0.85 |
| Asphalt binder (PG 70-22) in achm surface course (1/2") (minimum bid $120.00) | 407442 | TON | 15 | 15 (100%) | $120.00 | $120.00 |
| Mineral aggregate in achm surface course (3/8") | 407161 | TON | 33 | 14 (42%) | $131.22 | $124.22 |
| Construction pavement markings | 604041 | LF | 30 | 14 (47%) | $0.29 | $0.28 |
| Thermoplastic pavement marking white (6") | 719002 | LF | 27 | 14 (52%) | $1.05 | $0.90 |
| Tack coat | 401011 | GAL | 34 | 12 (35%) | $4.00 | $3.75 |
A line counts when the firm priced it and at least one other bidder did too; the lowest unit price on the line counts whoever won the contract. Token prices and bids over three times the low bid are left out.
Who it meets most
| Firm | Contracts in common | That firm ranked ahead |
|---|---|---|
| Rogers Group, Inc. | 27 | 12 of 27 |
| Forsgren, Inc. | 12 | 2 of 12 |
| Apac-Central, Inc. | 10 | 4 of 10 |
| CK Asphalt, LLC | 8 | 5 of 8 |
| Redstone Construction Group, Inc. | 8 | 1 of 8 |
| Cranford Construction Co. | 7 | 1 of 7 |
| R. K. Hall, LLC | 7 | 0 of 7 |
| Emery Sapp & Sons, Inc. | 7 | 2 of 7 |
| Tri State Asphalt, Inc. | 7 | 1 of 7 |
| Robinson Construction, LLC | 5 | 0 of 5 |
Latest bids
| Let | Contract | County | Project | Rank | Its bid | Against the low bid |
|---|---|---|---|---|---|---|
| 04 NOV 2026 | A40062 | Polk | THE PURPOSE OF THIS PROJECT IS TO OVERLAY APPROXIMATELY 11.620 MILES OF HIGHWAY 375 IN POLK COUNTY. THIS PROJECT CONSISTS OF TRENCHING AND S | 1 of 1 | $4,997,122 | Low |
| 12 AUG 2026 | SA5865 | Pope | THE PURPOSE OF THIS PROJECT IS TO OVERLAY APPROXIMATELY 4.23 MILES OF HUDSON ROAD IN POPE COUNTY. THIS PROJECT CONSISTS OF AGGREGATE BASE CO | 1 of 1 | $929,781 | Low |
| 20 MAY 2026 | FA5310 | Perry | THE PURPOSE OF THIS PROJECT IS TO SURFACE APPROXIMATELY 5.28 MILES OF UNION VALLEY RD. IN PERRY COUNTY. THIS PROJECT CONSISTS OF AGGREGATE B | 1 of 3 | $1,785,414 | Low, 3.0% under the second |
| 20 MAY 2026 | SA4141 | Little River | THE PURPOSE OF THIS PROJECT IS TO SURFACE APPROXIMATELY 1.00 MILE OF CO. RD. 51 IN LITTLE RIVER COUNTY. THIS PROJECT CONSISTS OF AGGREGATE B | 3 of 4 | $420,044 | +29% |
| 20 MAY 2026 | SA5142 | Newton | THE PURPOSE OF THIS PROJECT IS TO OVERLAY APPROXIMATELY 1.33 MILES OF MCELROY GAP ROAD IN NEWTON COUNTY. THIS PROJECT CONSISTS OF ACHM SURFA | 2 of 2 | $374,074 | +41% |
| 20 MAY 2026 | SA6347 | Scott | THE PURPOSE OF THIS PROJECT IS TO OVERLAY APPROXIMATELY 1.57 MILES OF SWEET GUM LN. IN SCOTT COUNTY. THIS PROJECT CONSISTS OF STONE BACKFILL | 1 of 4 | $473,879 | Low, 3.0% under the second |
| 08 APR 2026 | A30028 | Howard | THE PURPOSE OF THIS PROJECT IS TO LEVEL AND OVERLAY APPROXIMATELY 9.327 MILES OF HIGHWAY 278 IN HOWARD COUNTY. THIS PROJECT CONSISTS OF REMO | 1 of 4 | $5,437,761 | Low, 5.0% under the second |
| 08 APR 2026 | A40050 | Scott | THE PURPOSE OF THIS PROJECT IS TO MILL AND OVERLAY APPROXIMATELY 6.744 MILES OF HIGHWAYS 71, 71B, AND 272 IN SCOTT COUNTY. THIS PROJECT CONS | 1 of 4 | $3,271,994 | Low, 5.0% under the second |
| 08 APR 2026 | A80045 | Logan | THE PURPOSE OF THIS PROJECT IS TO OVERLAY APPROXIMATELY 10.267 MILES OF HIGHWAYS 109 AND 393 IN LOGAN COUNTY. THIS PROJECT CONSISTS OF REMOV | 1 of 3 | $5,260,281 | Low, 12% under the second |
| 04 MAR 2026 | A30029 | Little River | THE PURPOSE OF THIS PROJECT IS TO LEVEL AND OVERLAY APPROXIMATELY 6.946 MILES OF HIGHWAY 32 IN LITTLE RIVER COUNTY. THIS PROJECT CONSISTS OF | 1 of 4 | $3,821,642 | Low, 5.0% under the second |
| 04 MAR 2026 | A40051 | Polk | THE PURPOSE OF THIS PROJECT IS TO OVERLAY APPROXIMATELY 18.061 MILES OF HIGHWAYS 88 AND 272 IN POLK COUNTY. THIS PROJECT CONSISTS OF REMOVAL | 1 of 1 | $8,887,904 | Low |
| 04 MAR 2026 | AX0009 | Perry, Pulaski | THE PURPOSE OF THIS PROJECT IS TO MILL AND OVERLAY APPROXIMATELY 15.525 MILES OF HIGHWAY 10 IN PERRY AND PULASKI COUNTIES. THIS PROJECT CONS | 2 of 4 | $4,022,907 | +1.0% |
| 21 JAN 2026 | A30040 | Pike | THE PURPOSE OF THIS PROJECT IS TO OVERLAY APPROXIMATELY 7.639 MILES OF HIGHWAY 27 IN PIKE COUNTY. THIS PROJECT CONSISTS OF REMOVAL AND DISPO | 1 of 3 | $3,051,326 | Low, 1.0% under the second |
| 21 JAN 2026 | A80041 | Conway | THE PURPOSE OF THIS PROJECT IS TO LEVEL AND OVERLAY APPROXIMATELY 5.290 MILES OF HIGHWAY 154 IN CONWAY COUNTY. THIS PROJECT CONSISTS OF AGGR | 1 of 3 | $1,370,692 | Low, 6.0% under the second |
| 21 JAN 2026 | A80042 | Yell | THE PURPOSE OF THIS PROJECT IS TO MILL AND OVERLAY APPROXIMATELY 9.025 MILES OF HIGHWAYS 7 AND 27 IN YELL COUNTY. THIS PROJECT CONSISTS OF R | 1 of 1 | $4,617,183 | Low |
| 21 JAN 2026 | C42007 | Logan | THE PURPOSE OF THIS PROJECT IS TO OVERLAY AND SURFACE APPROXIMATELY 1.23 MILES OF VARIOUS CITY STREETS IN THE CITY OF BLUE MOUNTAIN, OVERLAY | 1 of 4 | $718,829 | Low, 2.0% under the second |
| 21 JAN 2026 | C53009 | Perry | THE PURPOSE OF THIS PROJECT IS TO OVERLAY APPROXIMATELY 1.13 MILES OF VARIOUS CITY STREETS IN THE CITY OF PERRY IN PERRY COUNTY. THIS PROJEC | 2 of 3 | $189,686 | +1.0% |
| 21 JAN 2026 | C55003 | Pike | THE PURPOSE OF THIS PROJECT IS TO OVERLAY APPROXIMATELY 1.66 MILES OF VARIOUS CITY STREETS IN THE CITY OF DELIGHT, LOCATED IN PIKE COUNTY. T | 1 of 4 | $327,642 | Low, 5.0% under the second |
| 21 JAN 2026 | C75007 | Yell | THE PURPOSE OF THIS PROJECT IS TO OVERLAY APPROXIMATELY 1.93 MILES OF VARIOUS CITY STREETS IN THE CITY OF BELLEVILLE, OVERLAY AND SURFACE AP | 1 of 1 | $645,813 | Low |
| 21 JAN 2026 | C76094 | Franklin, Johnson | THE PURPOSE OF THIS PROJECT IS TO SURFACE APPROXIMATELY 0.43 MILE OF HILBURN POINT ROAD IN THE CITY OF ALTUS IN FRANKLIN COUNTY AND TO OVERL | 1 of 2 | $379,851 | Low, 22% under the second |
| 05 NOV 2025 | A40048 | Franklin | THE PURPOSE OF THIS PROJECT IS TO MILL AND OVERLAY APPROXIMATELY 9.674 MILES OF HIGHWAYS 23, 64, AND 219 IN FRANKLIN COUNTY. THIS PROJECT CO | 1 of 5 | $3,641,446 | Low, 9.0% under the second |
| 05 NOV 2025 | A40053 | Franklin | THE PURPOSE OF THIS PROJECT IS TO OVERLAY AND SCRUB SEAL APPROXIMATELY 6.142 MILES OF HIGHWAY 186 IN FRANKLIN COUNTY. THIS PROJECT CONSISTS | 2 of 5 | $3,003,340 | +5.0% |
| 05 NOV 2025 | A80044 | Pope | THE PURPOSE OF THIS PROJECT IS TO MILL AND OVERLAY APPROXIMATELY 7.684 MILES OF HIGHWAY 64 IN POPE COUNTY. THIS PROJECT CONSISTS OF REMOVAL | 1 of 1 | $5,160,151 | Low |
| 13 AUG 2025 | SA1563 | Conway | THE PURPOSE OF THIS PROJECT IS TO OVERLAY APPROXIMATELY 0.87 MILE OF COUNTY ROAD 55 IN CONWAY COUNTY. THIS PROJECT CONSISTS OF AGGREGATE SUR | 1 of 3 | $168,781 | Low, 15% under the second |
| 13 AUG 2025 | SA2378 | Faulkner | THE PURPOSE OF THIS PROJECT IS TO OVERLAY APPROXIMATELY 0.75 MILE OF OLD HWY. 25 IN FAULKNER COUNTY. THIS PROJECT CONSISTS OF AGGREGATE SURF | 1 of 4 | $130,021 | Low, 12% under the second |
How this record was read
ARDOT monthly bid tab PDFs (morning and afternoon sessions), January 2022 to November 2026. Base bids are printed in whole dollars; on A+B and A+C jobs the base bid is kept, and the published rank follows the award amount.
- Every bid counted here matched its published total to within one dollar; ARDOT's rank decides who was low.
- The gap to the low bid is the firm's total over the low total, minus one, on contracts it did not win, leaving out bids over three times the low bid.
- A record covers the lettings in the data, not every contract the firm ever bid. Coverage by year is on the state page.
A name split in two, or a figure that does not match the owner's tabulation? Write to mehdi@miragemetrics.com and we correct it.
Your own bid history, read the same way
Mirage deploys AI agents for heavy civil estimating teams: quantities from the plan set, specs and addenda read, and bid tabs compared, inside your systems and your rules.