Cranford Construction Co.: ARDOT bid record
Cranford Construction Co. submitted 105 bids on Arkansas DOT contracts in the data, from 16 FEB 2022 to 04 NOV 2026, and was the low bidder on 49 of them (47%). When it was not low, its total sat a median +14% above the low bid.
- Owner
- Arkansas DOT
- Low bid volume
- $151,490,662
- Latest bid
- 04 NOV 2026
- Data through
- 04 NOV 2026
By year
| Year | Bids | Low bids | Win rate |
|---|---|---|---|
| 2022 | 15 | 10 | 67% |
| 2023 | 20 | 16 | 80% |
| 2024 | 11 | 3 | 27% |
| 2025 | 28 | 9 | 32% |
| 2026 | 31 | 11 | 35% |
By county
| County | Bids | Low bids | Win rate |
|---|---|---|---|
| Pulaski | 19 | 8 | 42% |
| Garland | 10 | 10 | 100% |
| Hot Spring | 6 | 4 | 67% |
| Saline | 6 | 5 | 83% |
| Dallas | 5 | 2 | 40% |
| Nevada | 5 | 1 | 20% |
| Prairie | 5 | 0 | 0% |
| Jefferson | 4 | 4 | 100% |
| Pulaski, Saline | 4 | 2 | 50% |
| Grant | 4 | 4 | 100% |
| Clark | 4 | 2 | 50% |
| Lonoke | 3 | 0 | 0% |
Pay items where it is most often lowest
| Pay item | Code | Unit | Lines bid | Lowest on the line | Its median price | All bidders' median |
|---|---|---|---|---|---|---|
| Raised pavement markers (type II) | 721002 | EACH | 52 | 46 (88%) | $4.50 | $6.50 |
| Signs | 604003 | SF | 79 | 44 (56%) | $6.00 | $8.40 |
| Construction pavement markings | 604041 | LF | 51 | 35 (69%) | $0.17 | $0.28 |
| Thermoplastic pavement marking white (6") | 719002 | LF | 45 | 31 (69%) | $0.68 | $0.90 |
| Achm patching of existing roadway | 415011 | TON | 72 | 29 (40%) | $274.53 | $250.00 |
| Thermoplastic pavement marking yellow (6") | 719102 | LF | 45 | 27 (60%) | $0.64 | $0.85 |
| Cold milling asphalt pavement | 412002 | SY | 56 | 22 (39%) | $4.76 | $8.00 |
| Thermoplastic pavement marking (words) | 719201 | EACH | 29 | 21 (72%) | $300.00 | $325.00 |
| Mineral aggregate in achm surface course (1/2") | 407162 | TON | 57 | 20 (35%) | $121.80 | $124.55 |
| Asphalt binder (PG 70-22) in achm surface course (1/2") (minimum bid $120.00) | 407442 | TON | 27 | 20 (74%) | $120.00 | $120.00 |
| Thermoplastic pavement marking (arrows) | 719202 | EACH | 29 | 19 (66%) | $265.00 | $290.00 |
| Guardrail terminal (type 2) | 617312 | EACH | 23 | 19 (83%) | $3,000.00 | $3,100.00 |
A line counts when the firm priced it and at least one other bidder did too; the lowest unit price on the line counts whoever won the contract. Token prices and bids over three times the low bid are left out.
Who it meets most
| Firm | Contracts in common | That firm ranked ahead |
|---|---|---|
| Redstone Construction Group, Inc. | 54 | 30 of 54 |
| Redstone Const. Group, Inc. | 16 | 11 of 16 |
| Rogers Group, Inc. | 16 | 13 of 16 |
| Jet Asphalt & Rock Co., Inc. | 14 | 9 of 14 |
| CK Asphalt, LLC | 10 | 8 of 10 |
| R. K. Hall, LLC | 8 | 1 of 8 |
| Blackstone Construction, LLC | 7 | 6 of 7 |
| Delta Asphalt of Arkansas, Inc. | 6 | 3 of 6 |
| Tri State Asphalt, Inc. | 6 | 1 of 6 |
| Smackover Paving Co. | 6 | 1 of 6 |
Latest bids
| Let | Contract | County | Project | Rank | Its bid | Against the low bid |
|---|---|---|---|---|---|---|
| 04 NOV 2026 | A30049 | Hempstead, Howard | THE PURPOSE OF THIS PROJECT IS TO MILL AND OVERLAY APPROXIMATELY 18.474 MILES OF HIGHWAY 73 IN HEMPSTEAD AND HOWARD COUNTIES. THIS PROJECT C | 1 of 3 | $7,118,756 | Low, 12% under the second |
| 04 NOV 2026 | A60066 | Pulaski | THE PURPOSE OF THIS PROJECT IS TO MILL AND OVERLAY APPROXIMATELY 5.078 MILES OF HIGHWAY 338 IN PULASKI COUNTY. THIS PROJECT CONSISTS OF EART | 1 of 2 | $2,399,719 | Low, 22% under the second |
| 04 NOV 2026 | A70050 | Clark | THE PURPOSE OF THIS PROJECT IS TO OVERLAY APPROXIMATELY 12.433 MILES OF HIGHWAY 182 IN CLARK COUNTY. THIS PROJECT CONSISTS OF REMOVAL AND DI | 2 of 2 | $7,458,837 | +37% |
| 23 SEP 2026 | 061950 | Pulaski | THE PURPOSE OF THIS PROJECT IS TO RESURFACE AND UPDATE PAVEMENT MARKING OF THE PARKING LOTS AT THE ARDOT CENTRAL OFFICE IN PULASKI COUNTY. T | 2 of 2 | $799,989 | +10% |
| 23 SEP 2026 | SA2046 | Dallas | THE PURPOSE OF THIS PROJECT IS TO OVERLAY APPROXIMATELY 0.96 MILE OF COUNTY ROAD 246 IN DALLAS COUNTY. THIS PROJECT CONSISTS OF ACHM SURFACE | 3 of 3 | $366,773 | +22% |
| 24 JUN 2026 | A60063 | Garland | THE PURPOSE OF THIS PROJECT IS TO MILL AND OVERLAY APPROXIMATELY 5.876 MILES OF HIGHWAY 7 IN GARLAND COUNTY. THIS PROJECT CONSISTS OF ACHM S | 1 of 2 | $4,379,113 | Low, 9.0% under the second |
| 24 JUN 2026 | SA3056 | Hot Spring | THE PURPOSE OF THIS PROJECT IS TO OVERLAY APPROXIMATELY 2.99 MILES OF SYCAMORE DR. IN HOT SPRING COUNTY. THIS PROJECT CONSISTS OF ACHM SURFA | 2 of 2 | $656,434 | +6.0% |
| 24 JUN 2026 | SA5956 | Prairie | THE PURPOSE OF THIS PROJECT IS TO OVERLAY APPROXIMATELY 0.80 MILE OF W. JACKSON ST. IN PRAIRIE COUNTY. THIS PROJECT CONSISTS OF ACHM SURFACE | 2 of 5 | $122,487 | +3.0% |
| 20 MAY 2026 | A60058 | Hot Spring | THE PURPOSE OF THIS PROJECT IS TO MILL, OVERLAY, AND PLACE ULTRATHIN BONDED WEARING COURSE ON APPROXIMATELY 10.115 MILES OF HIGHWAY 270 IN H | 1 of 2 | $3,370,063 | Low, 11% under the second |
| 20 MAY 2026 | C59009 | Prairie | THE PURPOSE OF THIS PROJECT IS TO OVERLAY APPROXIMATELY 1.64 MILES OF VARIOUS CITY STREETS IN THE CITY OF DES ARC IN PRAIRIE COUNTY. THIS PR | 2 of 2 | $458,818 | +40% |
| 20 MAY 2026 | SA4141 | Little River | THE PURPOSE OF THIS PROJECT IS TO SURFACE APPROXIMATELY 1.00 MILE OF CO. RD. 51 IN LITTLE RIVER COUNTY. THIS PROJECT CONSISTS OF AGGREGATE B | 2 of 4 | $342,932 | +6.0% |
| 08 APR 2026 | A30028 | Howard | THE PURPOSE OF THIS PROJECT IS TO LEVEL AND OVERLAY APPROXIMATELY 9.327 MILES OF HIGHWAY 278 IN HOWARD COUNTY. THIS PROJECT CONSISTS OF REMO | 2 of 4 | $5,720,833 | +5.0% |
| 08 APR 2026 | A30031 | Miller | THE PURPOSE OF THIS PROJECT IS TO MILL AND OVERLAY APPROXIMATELY 1.327 MILES OF HIGHWAY 71 IN MILLER COUNTY. THIS PROJECT CONSISTS OF ACHM S | 2 of 2 | $1,175,325 | +7.0% |
| 08 APR 2026 | A70039 | Columbia | THE PURPOSE OF THIS PROJECT IS TO MILL, INLAY, AND PLACE ULTRATHIN BONDED WEARING COURSE ON APPROXIMATELY 17.783 MILES OF HIGHWAY 19 IN COLU | 2 of 2 | $10,647,274 | +24% |
| 08 APR 2026 | C20006 | Dallas | THE PURPOSE OF THIS PROJECT IS TO OVERLAY APPROXIMATELY 1.20 MILES OF VARIOUS CITY STREETS IN THE CITY OF CARTHAGE IN DALLAS COUNTY. THIS PR | 2 of 3 | $499,390 | +36% |
| 08 APR 2026 | C60016 | Pulaski | THE PURPOSE OF THIS PROJECT IS TO OVERLAY APPROXIMATELY 2.21 MILES OF VARIOUS CITY STREETS IN THE CITY OF WRIGHTSVILLE IN PULASKI COUNTY. TH | 3 of 4 | $491,556 | +35% |
| 08 APR 2026 | C76092 | Hot Spring, Saline | THE PURPOSE OF THIS PROJECT IS TO OVERLAY APPROXIMATELY 1.40 MILES OF VARIOUS CITY STREETS IN THE CITY OF BAUXITE IN SALINE COUNTY, 2.22 MIL | 3 of 3 | $2,003,249 | +38% |
| 08 APR 2026 | SA2757 | Grant | THE PURPOSE OF THIS PROJECT IS TO OVERLAY APPROXIMATELY 2.10 MILES OF CO. RD. 51 IN GRANT COUNTY. THIS PROJECT CONSISTS OF ACHM SURFACE COUR | 1 of 5 | $445,215 | Low, 2.0% under the second |
| 04 MAR 2026 | A30029 | Little River | THE PURPOSE OF THIS PROJECT IS TO LEVEL AND OVERLAY APPROXIMATELY 6.946 MILES OF HIGHWAY 32 IN LITTLE RIVER COUNTY. THIS PROJECT CONSISTS OF | 2 of 4 | $4,008,247 | +5.0% |
| 04 MAR 2026 | AX0009 | Perry, Pulaski | THE PURPOSE OF THIS PROJECT IS TO MILL AND OVERLAY APPROXIMATELY 15.525 MILES OF HIGHWAY 10 IN PERRY AND PULASKI COUNTIES. THIS PROJECT CONS | 3 of 4 | $4,278,741 | +7.0% |
| 04 MAR 2026 | SA2949 | Hempstead | THE PURPOSE OF THIS PROJECT IS TO SURFACE APPROXIMATELY 1.33 MILES OF COUNTY ROAD 60 IN HEMPSTEAD COUNTY. THIS PROJECT CONSISTS OF AGGREGATE | 3 of 3 | $337,493 | +22% |
| 21 JAN 2026 | A20038 | Grant | THE PURPOSE OF THIS PROJECT IS TO MILL AND OVERLAY APPROXIMATELY 8.277 MILES OF HIGHWAY 167 IN GRANT COUNTY. THIS PROJECT CONSISTS OF AGGREG | 1 of 2 | $5,267,592 | Low, 23% under the second |
| 21 JAN 2026 | A30039 | Nevada | THE PURPOSE OF THIS PROJECT IS TO OVERLAY APPROXIMATELY 11.417 MILES OF HIGHWAY 371 IN NEVADA COUNTY. THIS PROJECT CONSISTS OF AGGREGATE BAS | 1 of 2 | $4,752,638 | Low, 6.0% under the second |
| 21 JAN 2026 | A30040 | Pike | THE PURPOSE OF THIS PROJECT IS TO OVERLAY APPROXIMATELY 7.639 MILES OF HIGHWAY 27 IN PIKE COUNTY. THIS PROJECT CONSISTS OF REMOVAL AND DISPO | 2 of 3 | $3,080,681 | +1.0% |
| 21 JAN 2026 | A60057 | Prairie | THE PURPOSE OF THIS PROJECT IS TO OVERLAY APPROXIMATELY 13.441 MILES OF HIGHWAY 63 IN PRAIRIE COUNTY. THIS PROJECT CONSISTS OF AGGREGATE BAS | 2 of 5 | $5,333,864 | +11% |
How this record was read
ARDOT monthly bid tab PDFs (morning and afternoon sessions), January 2022 to November 2026. Base bids are printed in whole dollars; on A+B and A+C jobs the base bid is kept, and the published rank follows the award amount.
- Every bid counted here matched its published total to within one dollar; ARDOT's rank decides who was low.
- The gap to the low bid is the firm's total over the low total, minus one, on contracts it did not win, leaving out bids over three times the low bid.
- A record covers the lettings in the data, not every contract the firm ever bid. Coverage by year is on the state page.
A name split in two, or a figure that does not match the owner's tabulation? Write to mehdi@miragemetrics.com and we correct it.
Your own bid history, read the same way
Mirage deploys AI agents for heavy civil estimating teams: quantities from the plan set, specs and addenda read, and bid tabs compared, inside your systems and your rules.