ARDOT contract C60016 bid tabulation

THE PURPOSE OF THIS PROJECT IS TO OVERLAY APPROXIMATELY 2.21 MILES OF VARIOUS CITY STREETS IN THE CITY OF WRIGHTSVILLE IN PULASKI COUNTY. THIS PROJECT CONSISTS OF AGGREGATE BASE COURSE, ACHM SURFACE COURSE, ACHM PATCHING, MAINTENANCE OF TRAFFIC, PAVEMENT MARKING AND MISC. ITEMS. Let by Arkansas DOT on April 8, 2026, Pulaski. 4 bids received; low bid $365,392 by Redstone Construction Group, Inc..

Owner
Arkansas DOT
Letting
08 APR 2026
Pay items
12
Data through
04 NOV 2026

Bidders

RankBidderTotal bidAgainst the low bid
1Redstone Construction Group, Inc.$365,392Low
2M & T Paving & Const. Co., Inc.$433,547+19%
3Cranford Construction Co.$491,556+35%
4Kesser International, Inc.$579,737+59%
ARDOT contract C60016: bids by rank

Bid tabulation

LinePay itemUnitQuantity1. Redstone Construction Group, Inc.2. M & T Paving & Const. Co., Inc.3. Cranford Construction Co.4. Kesser International, Inc.
0001Scarifying and recompacting roadway (216201)STA5$750.00$828.00$2,409.78$1,780.80
0002Aggregate base course (class 7) (303107)TON238$65.00$68.75$61.58$59.36
0003Tack coat (401011)GAL2,399$0.01$4.00$3.74$7.12
0004Mineral aggregate in achm surface course (3/8") (407161)TON2,550$114.00$134.90$149.14$181.35
0005Asphalt binder (PG 64-22) in achm surface course (3/8") (minimum bid $120.00) (407431)TON163$120.00$134.90$120.00$181.35
0006Achm patching of existing roadway (415011)TON55$305.55$275.22$202.48$326.48
0007Maintenance of traffic (603001)LS1$5,250.00$9,000.00$23,915$14,246
0008Signs (604003)SF312$5.25$6.00$5.00$8.31
0009Reflectorized paint pavement marking white (4") (718001)LF3,913$0.21$0.25$0.20$0.47
0010Reflectorized paint pavement marking yellow (4") (718101)LF8,031$0.21$0.25$0.20$0.47
0011Reflectorized paint pavement marking (railroad emblems) (718203)EACH2$593.25$375.00$565.00$474.88
0012Mobilization (unit bid amount may not exceed 5% of subtotal) (601001)LS1$8,500.00$7,720.00$15,882$6,262.48
ARDOT contract C60016: unit prices by line

The pay item list has one row per line (item, description, unit, quantity, the low bidder's unit price), the flat layout estimating software imports. Pay items with a page of their own open their price history.

Source

Read from ARDOT's tabulation for this contract. ARDOT monthly bid tab PDFs (morning and afternoon sessions), January 2022 to November 2026. Base bids are printed in whole dollars; on A+B and A+C jobs the base bid is kept, and the published rank follows the award amount.

Every contract let that day: ARDOT letting of April 8, 2026. Compiled by Mirage Metrics.

Your own bid history, read the same way

Mirage deploys AI agents for heavy civil estimating teams: quantities from the plan set, specs and addenda read, and bid tabs compared, inside your systems and your rules.

We use your email to reply to you and, now and then, to tell you about Mirage. You can opt out at any time. Privacy policy