Kesser International, Inc.: ARDOT bid record
Kesser International, Inc. submitted 41 bids on Arkansas DOT contracts in the data, from 12 JAN 2022 to 23 SEP 2026, and was the low bidder on 14 of them (34%). When it was not low, its total sat a median +40% above the low bid.
- Owner
- Arkansas DOT
- Low bid volume
- $21,596,317
- Latest bid
- 23 SEP 2026
- Data through
- 04 NOV 2026
By year
| Year | Bids | Low bids | Win rate |
|---|---|---|---|
| 2022 | 4 | 1 | 25% |
| 2023 | 10 | 5 | 50% |
| 2024 | 18 | 7 | 39% |
| 2025 | 1 | 1 | 100% |
| 2026 | 8 | 0 | 0% |
By county
| County | Bids | Low bids | Win rate |
|---|---|---|---|
| Pulaski | 4 | 0 | 0% |
| Jefferson | 4 | 2 | 50% |
| Clark | 3 | 1 | 33% |
| Nevada | 2 | 1 | 50% |
| Craighead | 2 | 1 | 50% |
| Independence | 2 | 2 | 100% |
| Drew | 2 | 0 | 0% |
| Lincoln | 2 | 0 | 0% |
| Grant | 2 | 0 | 0% |
| Hempstead | 2 | 2 | 100% |
| Jackson | 1 | 0 | 0% |
| Scott | 1 | 1 | 100% |
Pay items where it is most often lowest
| Pay item | Code | Unit | Lines bid | Lowest on the line | Its median price | All bidders' median |
|---|---|---|---|---|---|---|
| Class S concrete-roadway | 802012 | CY | 17 | 10 (59%) | $1,527.68 | $1,500.00 |
| Unclassified excavation for structures-roadway | 801101 | CY | 18 | 8 (44%) | $140.00 | $140.00 |
| Compacted embankment | 210611 | CY | 15 | 8 (53%) | $33.35 | $30.00 |
| Temporary impact attenuation barrier | 731071 | EACH | 11 | 8 (73%) | $5,520.00 | $6,017.55 |
| Signs | 604003 | SF | 37 | 7 (19%) | $23.10 | $8.40 |
| Tack coat | 401011 | GAL | 31 | 7 (23%) | $7.12 | $3.75 |
| Rock ditch checks | 621151 | CY | 20 | 7 (35%) | $140.00 | $105.00 |
| Soil stabilization | 210702 | TON | 17 | 7 (41%) | $336.00 | $350.00 |
| Unclassified excavation | 210213 | CY | 16 | 7 (44%) | $28.00 | $25.00 |
| 4" pipe underdrains | 611008 | LF | 14 | 7 (50%) | $7.36 | $19.95 |
| Achm patching of existing roadway | 415011 | TON | 26 | 6 (23%) | $338.35 | $250.00 |
| Lime | 620001 | TON | 21 | 6 (29%) | $161.28 | $105.00 |
A line counts when the firm priced it and at least one other bidder did too; the lowest unit price on the line counts whoever won the contract. Token prices and bids over three times the low bid are left out.
Who it meets most
| Firm | Contracts in common | That firm ranked ahead |
|---|---|---|
| Mobley Contractors, Inc. | 9 | 5 of 9 |
| Pine Bluff Sand & Gravel Co. | 8 | 5 of 8 |
| R. L. Persons Const., Inc. | 6 | 2 of 6 |
| Robertson Contractors, Inc. | 5 | 4 of 5 |
| 1911 Construction Company, Inc. | 4 | 4 of 4 |
| Redstone Const. Group, Inc. | 4 | 2 of 4 |
| Cranford Construction Co. | 4 | 4 of 4 |
| Redstone Construction Group, Inc. | 4 | 3 of 4 |
| Thomco, Inc. | 3 | 3 of 3 |
| Seagraves Construction, Inc. | 3 | 3 of 3 |
Latest bids
| Let | Contract | County | Project | Rank | Its bid | Against the low bid |
|---|---|---|---|---|---|---|
| 23 SEP 2026 | 110716 | Phillips | THE PURPOSE OF THIS PROJECT IS TO REPLACE THREE STRUCTURES ON HIGHWAYS 185 AND 318 IN PHILLIPS COUNTY. THIS PROJECT CONSISITS OF CLEARING AN | 8 of 8 | $4,222,227 | +41% |
| 23 SEP 2026 | CB0401 | Benton | THE PURPOSE OF THIS PROJECT IS TO CONSTRUCT A QUINT. 12' X 8' R.C. BOX CULVERT AND APPROACHES ON 0.138 MILE OF BREDEHOEFT ROAD IN THE CITY O | 6 of 6 | $1,542,193 | +41% |
| 24 JUN 2026 | C09008 | Chicot | THE PURPOSE OF THIS PROJECT IS TO OVERLAY APPROXIMATELY 1.31 MILES OF VARIOUS CITY STREETS IN THE CITY OF EUDORA IN CHICOT COUNTY. THIS PROJ | 2 of 2 | $531,989 | +52% |
| 24 JUN 2026 | C22005 | Drew | THE PURPOSE OF THIS PROJECT IS TO REPLACE ONE BRIDGE STRUCTURE AND CONSTRUCT APPROACHES ON 0.043 MILE OF 7TH STREET IN WILMAR IN DREW COUNTY | 5 of 6 | $951,539 | +56% |
| 24 JUN 2026 | SA1260 | Cleburne | THE PURPOSE OF THIS PROJECT IS TO OVERLAY APPROXIMATELY 2.52 MILES OF DRY MOUNTAIN RD. IN CLEBURNE COUNTY. THIS PROJECT CONSISTS OF ACHM SUR | 4 of 4 | $739,008 | +104% |
| 08 APR 2026 | C60016 | Pulaski | THE PURPOSE OF THIS PROJECT IS TO OVERLAY APPROXIMATELY 2.21 MILES OF VARIOUS CITY STREETS IN THE CITY OF WRIGHTSVILLE IN PULASKI COUNTY. TH | 4 of 4 | $579,737 | +59% |
| 08 APR 2026 | SA2757 | Grant | THE PURPOSE OF THIS PROJECT IS TO OVERLAY APPROXIMATELY 2.10 MILES OF CO. RD. 51 IN GRANT COUNTY. THIS PROJECT CONSISTS OF ACHM SURFACE COUR | 5 of 5 | $543,714 | +22% |
| 21 JAN 2026 | C10008 | Clark | THE PURPOSE OF THIS PROJECT IS TO OVERLAY AND SURFACE APPROXIMATELY 1.06 MILES OF VARIOUS CITY STREETS IN THE CITY OF GUM SPRINGS, OVERLAY A | 4 of 4 | $1,300,716 | +60% |
| 05 NOV 2025 | 101091 | Craighead | THE PURPOSE OF THIS PROJECT IS TO REPLACE ONE STRUCTURE ON HIGHWAY 18 IN CRAIGHEAD COUNTY. THIS PROJECT CONSISTS OF CLEARING AND GRUBBING, R | 1 of 3 | $1,068,789 | Low, 12% under the second |
| 06 NOV 2024 | 030598 | Pike | THE PURPOSE OF THIS PROJECT IS TO REMOVE ONE BOX CULVERT AND ONE BRIDGE AND CONSTRUCT TWO RC BOX CULVERTS IN PIKE COUNTY ON HIGHWAY 301. THI | 1 of 2 | $2,474,908 | Low, 24% under the second |
| 18 SEP 2024 | 110859 | Cross | THE PURPOSE OF THIS PROJECT IS TO REMOVE ONE COLLAPSED BRIDGE FROM ST. FRANCIS RIVER ON HIGHWAY 42 IN CROSS COUNTY. THIS PROJECT CONSISTS OF | 3 of 3 | $1,579,368 | +125% |
| 18 SEP 2024 | 030595 | Hempstead | THE PURPOSE OF THIS PROJECT IS TO REMOVE TWO DAMAGED BRIDGES AND CONSTRUCT TWO RC BOX CULVERTS ON HIGHWAY 195 IN HEMPSTEAD COUNTY. THIS PROJ | 1 of 2 | $4,267,017 | Low, 1.0% under the second |
| 18 SEP 2024 | 030596 | Hempstead | THE PURPOSE OF THIS PROJECT IS TO REMOVE TEMPORARY CULVERTS AND CONSTRUCT TWO DOUBLE BOX CULVERTS ON HIGHWAY 371 IN HEMPSTEAD COUNTY. THIS P | 1 of 2 | $3,438,378 | Low, 22% under the second |
| 18 SEP 2024 | FA7119 | Van Buren | THE PURPOSE OF THIS PROJECT IS TO REPLACE A CROSS DRAIN ON COUNTY ROAD 1750 IN VAN BUREN COUNTY. THIS PROJECT CONSISTS OF CLEARING AND GRUBB | 1 of 2 | $473,308 | Low, 11% under the second |
| 31 JUL 2024 | 040793 | Sebastian | THE PURPOSE OF THIS PROJECT IS TO REPLACE ONE STRUCTURE ON HIGHWAY 45 IN SEBASTIAN COUNTY. THIS PROJECT CONSISTS OF CLEARING AND GRUBBING, R | 2 of 2 | $4,037,300 | +24% |
| 31 JUL 2024 | 050475 | Izard | THE PURPOSE OF THIS PROJECT IS TO REPLACE ONE STRUCTURE ON HIGHWAY 56 IN IZARD COUNTY. THIS PROJECT CONSISTS OF CLEARING AND GRUBBING, REMOV | 2 of 4 | $2,086,092 | +4.0% |
| 26 JUN 2024 | SA6056 | Pulaski | THE PURPOSE OF THIS PROJECT IS TO OVERLAY APPROXIMATELY 1.52 MILES OF COUNTY ROAD 27 IN PULASKI COUNTY. THIS PROJECT CONSISTS OF AGGREGATE B | 3 of 3 | $463,960 | +27% |
| 22 MAY 2024 | SA3549 | Jefferson | THE PURPOSE OF THIS PROJECT IS TO OVERLAY APPROXIMATELY 1.90 MILES OF COUNTY ROAD 117 IN JEFFERSON COUNTY. THIS PROJECT CONSISTS OF AGGREGAT | 2 of 2 | $592,313 | +12% |
| 10 APR 2024 | 020778 | Lincoln | THE PURPOSE OF THIS PROJECT IS TO REPLACE AN EXISTING STRUCTURE WITH A QUADRUPLE R.C. BOX CULVERT ON HIGHWAY 293 IN LINCOLN COUNTY. THIS PRO | 2 of 2 | $2,199,345 | +11% |
| 28 FEB 2024 | 030530 | Nevada | THE PURPOSE OF THIS PROJECT IS TO REPLACE AN EXISTING BRIDGE STRUCTURE HIGHWAY 387 IN NEVADA COUNTY. THIS PROJECT CONSISTS OF CLEARING AND G | 1 of 2 | $2,114,508 | Low, 53% under the second |
| 28 FEB 2024 | C20005 | Dallas | THE PURPOSE OF THIS PROJECT IS TO OVERLAY APPROXIMATELY 1.02 MILES OF VARIOUS CITY STREETS IN THE CITY OF SPARKMAN IN DALLAS COUNTY. THIS PR | 2 of 2 | $436,871 | +40% |
| 28 FEB 2024 | C27008 | Grant | THE PURPOSE OF THIS PROJECT IS TO OVERLAY APPROXIMATELY 1.06 MILES OF WALKER DRIVE & FRANK CLARK ROAD IN THE CITY OF SHERIDAN IN GRANT COUNT | 3 of 3 | $450,031 | +58% |
| 28 FEB 2024 | C60013 | Pulaski | THE PURPOSE OF THIS PROJECT IS TO OVERLAY APPROXIMATELY 1.12 MILES OF TRAMMEL ROAD IN THE CITY OF SHERWOOD IN PULASKI COUNTY. THIS PROJECT C | 3 of 3 | $525,320 | +64% |
| 17 JAN 2024 | C18018 | Crittenden | THE PURPOSE OF THIS PROJECT IS TO OVERLAY APPROXIMATELY 0.60 MILE OF VARIOUS CITY STREETS IN THE CITY OF CRAWFORDSVILLE IN CRITTENDEN COUNTY | 2 of 3 | $312,135 | +7.0% |
| 17 JAN 2024 | C35007 | Jefferson | THE PURPOSE OF THIS PROJECT IS TO OVERLAY APPROXIMATELY 1.04 MILES OF VARIOUS CITY STREETS IN THE CITY OF ALTHEIMER AND OVERLAY APPROXIMATEL | 1 of 2 | $639,113 | Low, 7.0% under the second |
How this record was read
ARDOT monthly bid tab PDFs (morning and afternoon sessions), January 2022 to November 2026. Base bids are printed in whole dollars; on A+B and A+C jobs the base bid is kept, and the published rank follows the award amount.
- Every bid counted here matched its published total to within one dollar; ARDOT's rank decides who was low.
- The gap to the low bid is the firm's total over the low total, minus one, on contracts it did not win, leaving out bids over three times the low bid.
- A record covers the lettings in the data, not every contract the firm ever bid. Coverage by year is on the state page.
A name split in two, or a figure that does not match the owner's tabulation? Write to mehdi@miragemetrics.com and we correct it.
Your own bid history, read the same way
Mirage deploys AI agents for heavy civil estimating teams: quantities from the plan set, specs and addenda read, and bid tabs compared, inside your systems and your rules.