Pine Bluff Sand & Gravel Co.: ARDOT bid record

Pine Bluff Sand & Gravel Co. submitted 60 bids on Arkansas DOT contracts in the data, from 12 JAN 2022 to 04 NOV 2026, and was the low bidder on 48 of them (80%). When it was not low, its total sat a median +9.0% above the low bid.

Owner
Arkansas DOT
Low bid volume
$175,363,901
Latest bid
04 NOV 2026
Data through
04 NOV 2026
60Bids
48Low bids
80Win rate, percent
+9.0%Median gap to the low bid when not low, 12 bids

By year

YearBidsLow bidsWin rate
202288100%
2023161594%
2024141071%
20259667%
202613969%
Pine Bluff Sand & Gravel Co., ARDOT: bids and low bids by year of letting

By county

CountyBidsLow bidsWin rate
Drew88100%
Arkansas7457%
Desha7686%
Ashley77100%
Jefferson6233%
Chicot55100%
Desha, Drew33100%
Lincoln33100%
Bradley3267%
Cleveland2150%
Grant200%
Ashley, Chicot11100%
Pine Bluff Sand & Gravel Co., ARDOT: bids and low bids by county

Pay items where it is most often lowest

Pay itemCodeUnitLines bidLowest on the lineIts median priceAll bidders' median
Mineral aggregate in achm surface course (3/8")407161TON1614 (88%)$118.62$124.22
Signs604003SF2810 (36%)$11.25$8.40
Achm patching of existing roadway415011TON209 (45%)$257.50$250.00
Asphalt binder (PG 64-22) in achm surface course (3/8") (minimum bid $120.00)407431TON168 (50%)$410.00$120.00
Mineral aggregate in achm surface course (1/2")407162TON138 (62%)$88.83$124.55
Construction pavement markings604041LF118 (73%)$0.17$0.28
Aggregate base course (class 7)303117TON117 (64%)$55.00$52.19
Guardrail (type A)617005LF96 (67%)$31.00$32.00
Guardrail terminal (type 2)617312EACH96 (67%)$3,000.00$3,100.00
Water620030MGAL66 (100%)$10.00$10.00
Mulch cover620022ACRE66 (100%)$1,250.00$1,150.00
Raised pavement markers (type II)721002EACH105 (50%)$4.95$6.50
Pine Bluff Sand & Gravel Co., ARDOT: pay items where its unit price was the lowest on the line

A line counts when the firm priced it and at least one other bidder did too; the lowest unit price on the line counts whoever won the contract. Token prices and bids over three times the low bid are left out.

Who it meets most

FirmContracts in commonThat firm ranked ahead
Kesser International, Inc.83 of 8
Salt Creek Paving & Const. Co., Inc.72 of 7
Redstone Construction Group, Inc.72 of 7
Jet Asphalt & Rock Co., Inc.62 of 6
Atlas Asphalt, Inc.32 of 3
Apac-Mississippi, Inc.10 of 1
Smackover Paving Co.10 of 1
Cranford Construction Co.11 of 1
M & T Paving & Const. Co., Inc.10 of 1
T & T Construction, LLC10 of 1
Pine Bluff Sand & Gravel Co., ARDOT: the firms on the same contracts most often

Latest bids

LetContractCountyProjectRankIts bidAgainst the low bid
04 NOV 2026A20044ArkansasTHE PURPOSE OF THIS PROJECT IS TO OVERLAY APPROXIMATELY 23.707 MILES OF HIGHWAY 130 IN ARKANSAS COUNTY. THIS PROJECT CONSISTS OF REMOVAL AND1 of 4$8,699,968Low, 7.0% under the second
24 JUN 2026020853DeshaTHE PURPOSE OF THIS PROJECT IS TO CONSTRUCT SUBGRADE AND SURFACE APPROXIMATELY 3.388 MILE OF COUNTY ROAD 41 IN DESHA COUNTY. THIS PROJECT CO1 of 2$1,738,591Low, 2.0% under the second
24 JUN 2026C09008ChicotTHE PURPOSE OF THIS PROJECT IS TO OVERLAY APPROXIMATELY 1.31 MILES OF VARIOUS CITY STREETS IN THE CITY OF EUDORA IN CHICOT COUNTY. THIS PROJ1 of 2$349,458Low, 52% under the second
24 JUN 2026SA0148ArkansasTHE PURPOSE OF THIS PROJECT IS TO OVERLAY APPROXIMATELY 0.63 MILE OF DRIER RD. & LEDER RD. IN ARKANSAS COUNTY. THIS PROJECT CONSISTS OF ACHM2 of 3$160,825+17%
24 JUN 2026SA4051LincolnTHE PURPOSE OF THIS PROJECT IS TO OVERLAY APPROXIMATELY 1.49 MILES OF DAKOTA ROAD AND APPROXIMATELY 0.51 MILE OF ALEXANDER ROAD IN LINCOLN C1 of 2$454,246Low, 5.0% under the second
20 MAY 2026SA0253AshleyTHE PURPOSE OF THIS PROJECT IS TO OVERLAY APPROXIMATELY 2.10 MILES OF CO. RDS. 72, 73, AND 491 IN ASHLEY COUNTY. THIS PROJECT CONSISTS OF AC1 of 1$383,896Low
08 APR 2026A20033Ashley, DrewTHE PURPOSE OF THIS PROJECT IS TO MILL AND OVERLAY APPROXIMATELY 15.608 MILES OF HIGHWAYS 82 AND 425 IN ASHLEY AND DREW COUNTIES. THIS PROJE1 of 1$9,056,217Low
08 APR 2026SA2139DeshaTHE PURPOSE OF THIS PROJECT IS TO OVERLAY AND SURFACE APPROXIMATELY 0.25 MILE OF COUNTY ROAD 264 & 0.50 MILE OF BAXTER RD. IN DESHA COUNTY. 1 of 1$262,956Low
08 APR 2026SA2757GrantTHE PURPOSE OF THIS PROJECT IS TO OVERLAY APPROXIMATELY 2.10 MILES OF CO. RD. 51 IN GRANT COUNTY. THIS PROJECT CONSISTS OF ACHM SURFACE COUR2 of 5$455,499+2.0%
04 MAR 2026A20037JeffersonTHE PURPOSE OF THIS PROJECT IS TO MILL AND OVERLAY APPROXIMATELY 9.035 MILES OF HIGHWAY 79 IN JEFFERSON COUNTY. THIS PROJECT CONSISTS OF REM2 of 3$3,608,932+11%
04 MAR 2026A70041BradleyTHE PURPOSE OF THIS PROJECT IS TO OVERLAY APPROXIMATELY 17.066 MILES OF HIGHWAY 160 IN BRADLEY COUNTY. THIS PROJECT CONSISTS OF REMOVAL AND 2 of 2$7,031,106+6.0%
21 JAN 2026C76095Drew, LincolnTHE PURPOSE OF THIS PROJECT IS TO OVERLAY APPROXIMATELY 0.75 MILE OF VARIOUS CITY STREETS IN THE CITY OF GOULD AND APPROXIMATELY 1.49 MILES 1 of 2$840,891Low, 3.0% under the second
21 JAN 2026SA3550JeffersonTHE PURPOSE OF THIS PROJECT IS TO OVERLAY APPROXIMATELY 2.80 MILES OF ISLAND HARBOR MARINA DR. IN JEFFERSON COUNTY. THIS PROJECT CONSISTS OF1 of 1$510,239Low
05 NOV 2025A20023DrewTHE PURPOSE OF THIS PROJECT IS TO MILL AND OVERLAY APPROXIMATELY 6.449 MILES OF HIGHWAYS 83, 83S, AND A CITY STREET IN DREW COUNTY. THIS PRO1 of 2$3,658,072Low, 16% under the second
05 NOV 2025A20036ArkansasTHE PURPOSE OF THIS PROJECT IS TO MILL AND OVERLAY APPROXIMATELY 13.764 MILES OF HIGHWAY 1 IN ARKANSAS COUNTY. THIS PROJECT CONSISTS OF REMO2 of 2$6,618,830+3.0%
17 SEP 2025SA7635Cleveland, LincolnTHE PURPOSE OF THIS PROJECT IS TO OVERLAY APPROXIMATELY 0.48 MILE OF COUNTY ROAD 18 IN CLEVELAND AND LINCOLN COUNTIES. THIS PROJECT CONSISTS1 of 3$129,153Low, 2.0% under the second
09 APR 2025A20034JeffersonTHE PURPOSE OF THIS PROJECT IS TO MILL AND OVERLAY APPROXIMATELY 8.321 MILES OF HIGHWAY 425 IN JEFFERSON COUNTY. THIS PROJECT CONSISTS OF A 2 of 2$5,630,960+32%
26 FEB 2025SA2251DrewTHE PURPOSE OF THIS PROJECT IS TO OVERLAY APPROXIMATELY 2.81 MILES OF COUNTY ROAD 15 IN DREW COUNTY. THIS PROJECT CONSISTS OF ACHM SURFACE C1 of 2$663,041Low, 2.0% under the second
15 JAN 2025A20031DrewTHE PURPOSE OF THIS PROJECT IS TO MILL, INLAY, AND OVERLAY APPROXIMATELY 4.795 MILES OF HIGHWAY 278 IN DREW COUNTY. THIS PROJECT CONSISTS OF1 of 1$4,630,121Low
15 JAN 2025C21010DeshaTHE PURPOSE OF THIS PROJECT IS TO OVERLAY APPROXIMATELY 1.15 MILES OF BOWLES & CHOCTAW STREETS IN THE CITY OF DUMAS IN DESHA COUNTY. THIS PR2 of 2$459,428+5.0%
15 JAN 2025C76074Arkansas, DeshaTHE PURPOSE OF THIS PROJECT IS TO OVERLAY AND SURFACE APPROXIMATELY 1.34 MILES OF VARIOUS CITY STREETS IN THE CITY OF GILLETT IN ARKANSAS CO1 of 2$695,806Low, 2.0% under the second
15 JAN 2025C76090Bradley, DrewTHE PURPOSE OF THIS PROJECT IS TO OVERLAY APPROXIMATELY 1.36 MILES OF N. HYATT STREET IN THE CITY OF MONTICELLO IN DREW COUNTY AND 1.05 MILE1 of 1$1,048,000Low
06 NOV 2024A20027DrewTHE PURPOSE OF THIS PROJECT IS TO LEVEL AND OVERLAY APPROXIMATELY 6.513 MILES AND MILL AND OVERLAY APPROXIMATELY 5.493 MILES OF SELECTED SEC1 of 1$10,451,616Low
26 JUN 2024SA0943ChicotTHE PURPOSE OF THIS PROJECT IS TO SURFACE APPROXIMATELY 4.40 MILES OF COUNTY ROAD 32 IN CHICOT COUNTY. THIS PROJECT CONSISTS OF RECONSTRUCTE1 of 1$1,282,047Low
10 APR 2024070537ClevelandTHE PURPOSE OF THIS PROJECT IS TO SPOT LEVEL, PATCH, AND OVERLAY WITH 2' SHOULDER ON APPROXIMATELY 8.335 MILES ON HIGHWAY 114 IN CLEVELAND C1 of 2$5,245,267Low, 11% under the second
Pine Bluff Sand & Gravel Co.: latest ARDOT bids in the data

How this record was read

ARDOT monthly bid tab PDFs (morning and afternoon sessions), January 2022 to November 2026. Base bids are printed in whole dollars; on A+B and A+C jobs the base bid is kept, and the published rank follows the award amount.

  • Every bid counted here matched its published total to within one dollar; ARDOT's rank decides who was low.
  • The gap to the low bid is the firm's total over the low total, minus one, on contracts it did not win, leaving out bids over three times the low bid.
  • A record covers the lettings in the data, not every contract the firm ever bid. Coverage by year is on the state page.

A name split in two, or a figure that does not match the owner's tabulation? Write to mehdi@miragemetrics.com and we correct it.

Your own bid history, read the same way

Mirage deploys AI agents for heavy civil estimating teams: quantities from the plan set, specs and addenda read, and bid tabs compared, inside your systems and your rules.

We use your email to reply to you and, now and then, to tell you about Mirage. You can opt out at any time. Privacy policy