ARDOT contract C76090 bid tabulation

THE PURPOSE OF THIS PROJECT IS TO OVERLAY APPROXIMATELY 1.36 MILES OF N. HYATT STREET IN THE CITY OF MONTICELLO IN DREW COUNTY AND 1.05 MILES OF VARIOUS CITY STREETS IN THE CITY OF WARREN IN BRADLEY COUNTY. THIS PROJECT CONSISTS OF AGGREGATE BASE COURSE, ACHM SURFACE COURSE, COLD MILLING ASPHALT PAVEMENT, ACHM PATCHING OF EXISTING ROADWAY, PAVEMENT MARKING, MAINTENANCE OF TRAFFIC, AND MISC. ITEMS. Let by Arkansas DOT on January 15, 2025, Bradley, Drew. 1 bid received; low bid $1,048,000 by Pine Bluff Sand & Gravel Co..

Owner
Arkansas DOT
Letting
15 JAN 2025
Pay items
13
Data through
04 NOV 2026

Bidders

RankBidderTotal bidAgainst the low bid
1Pine Bluff Sand & Gravel Co.$1,048,000Low
ARDOT contract C76090: bids by rank

Bid tabulation

LinePay itemUnitQuantity1. Pine Bluff Sand & Gravel Co.
0001Aggregate base course (class 7) (303107)TON236$75.00
0002Tack coat (401011)GAL4,335$7.00
0003Mineral aggregate in achm surface course (3/8") (407161)TON4,390$87.22
0004Asphalt binder (PG 64-22) in achm surface course (3/8") (minimum bid $120.00) (407431)TON290$1,000.00
0005Cold milling asphalt pavement (412001)SY6,733$9.00
0006Achm patching of existing roadway (415011)TON430$320.00
0007Maintenance of traffic (603009)LS1$51,750
0008Signs (604003)SF192$25.00
0009Reflectorized paint pavement marking white (4") (718001)LF15,132$0.50
0010Reflectorized paint pavement marking white (12") (718005)LF132$20.00
0011Reflectorized paint pavement marking yellow (4") (718101)LF14,362$0.50
0012Reflectorized paint pavement marking (arrows) (718202)EACH11$500.00
0013Mobilization (unit bid amount may not exceed 5% of subtotal) (601001)LS1$49,425
ARDOT contract C76090: unit prices by line

The pay item list has one row per line (item, description, unit, quantity, the low bidder's unit price), the flat layout estimating software imports. Pay items with a page of their own open their price history.

Source

Read from ARDOT's tabulation for this contract. ARDOT monthly bid tab PDFs (morning and afternoon sessions), January 2022 to November 2026. Base bids are printed in whole dollars; on A+B and A+C jobs the base bid is kept, and the published rank follows the award amount.

Every contract let that day: ARDOT letting of January 15, 2025. Compiled by Mirage Metrics.

Your own bid history, read the same way

Mirage deploys AI agents for heavy civil estimating teams: quantities from the plan set, specs and addenda read, and bid tabs compared, inside your systems and your rules.

We use your email to reply to you and, now and then, to tell you about Mirage. You can opt out at any time. Privacy policy