Jet Asphalt & Rock Co., Inc.: ARDOT bid record

Jet Asphalt & Rock Co., Inc. submitted 48 bids on Arkansas DOT contracts in the data, from 12 JAN 2022 to 04 NOV 2026, and was the low bidder on 34 of them (71%). When it was not low, its total sat a median +9.0% above the low bid.

Owner
Arkansas DOT
Low bid volume
$145,350,584
Latest bid
04 NOV 2026
Data through
04 NOV 2026
48Bids
34Low bids
71Win rate, percent
+9.0%Median gap to the low bid when not low, 14 bids

By year

YearBidsLow bidsWin rate
20228675%
202311982%
20249889%
202511655%
20269556%
Jet Asphalt & Rock Co., Inc., ARDOT: bids and low bids by year of letting

By county

CountyBidsLow bidsWin rate
Union66100%
Columbia66100%
Bradley5360%
Ouachita55100%
Calhoun55100%
Dallas5360%
Nevada3133%
Clark200%
Cleveland2150%
Hot Spring11100%
Cleveland, Dallas11100%
Hempstead100%
Jet Asphalt & Rock Co., Inc., ARDOT: bids and low bids by county

Pay items where it is most often lowest

Pay itemCodeUnitLines bidLowest on the lineIts median priceAll bidders' median
Achm patching of existing roadway415011TON2416 (67%)$247.50$250.00
Signs604003SF2615 (58%)$6.50$8.40
Construction pavement markings604041LF2014 (70%)$0.16$0.28
Rumble strips in asphalt shoulders642001LF1613 (81%)$0.13$0.19
Centerline rumble stripes in asphalt roadways642102LF1612 (75%)$0.14$0.15
Asphalt binder (PG 64-22) in achm surface course (1/2") (minimum bid $120.00)407432TON1312 (92%)$120.00$120.00
Asphalt binder (PG 70-22) in achm surface course (1/2") (minimum bid $120.00)407442TON1311 (85%)$120.00$120.00
Approach gutters504264CY1211 (92%)$2,000.00$1,774.29
Guardrail (type A)617005LF1710 (59%)$31.50$32.00
Guardrail terminal (type 2)617312EACH1710 (59%)$3,000.00$3,100.00
Reinforcing steel-roadway (grade 60)804003LB1210 (83%)$2.00$2.40
Mineral aggregate in achm surface course (1/2")407162TON209 (45%)$123.00$124.55
Jet Asphalt & Rock Co., Inc., ARDOT: pay items where its unit price was the lowest on the line

A line counts when the firm priced it and at least one other bidder did too; the lowest unit price on the line counts whoever won the contract. Token prices and bids over three times the low bid are left out.

Who it meets most

FirmContracts in commonThat firm ranked ahead
Cranford Construction Co.145 of 14
Redstone Construction Group, Inc.137 of 13
Pine Bluff Sand & Gravel Co.64 of 6
Smackover Paving Co.30 of 3
Redstone Const. Group, Inc.22 of 2
R. K. Hall, LLC20 of 2
Tri State Asphalt, Inc.20 of 2
Sidney E Young DBA Sid and Sons10 of 1
Jet Asphalt & Rock Co., Inc., ARDOT: the firms on the same contracts most often

Latest bids

LetContractCountyProjectRankIts bidAgainst the low bid
04 NOV 2026A70049CalhounTHE PURPOSE OF THIS PROJECT IS TO MILL AND OVERLAY APPROXIMATELY 3.373 MILES OF HIGHWAY 167 IN CALHOUN COUNTY. THIS PROJECT CONSISTS OF FOG 1 of 1$2,223,118Low
20 MAY 2026A70042Calhoun, DallasTHE PURPOSE OF THIS PROJECT IS TO OVERLAY AND PLACE ULTRATHIN BONDED WEARING COURSE ON APPROXIMATELY 13.680 MILES OF HIGHWAY 274 IN CALHOUN 2 of 2$4,892,040+12%
08 APR 2026A70039ColumbiaTHE PURPOSE OF THIS PROJECT IS TO MILL, INLAY, AND PLACE ULTRATHIN BONDED WEARING COURSE ON APPROXIMATELY 17.783 MILES OF HIGHWAY 19 IN COLU1 of 2$8,608,236Low, 24% under the second
04 MAR 2026A20037JeffersonTHE PURPOSE OF THIS PROJECT IS TO MILL AND OVERLAY APPROXIMATELY 9.035 MILES OF HIGHWAY 79 IN JEFFERSON COUNTY. THIS PROJECT CONSISTS OF REM3 of 3$4,505,161+39%
04 MAR 2026A70041BradleyTHE PURPOSE OF THIS PROJECT IS TO OVERLAY APPROXIMATELY 17.066 MILES OF HIGHWAY 160 IN BRADLEY COUNTY. THIS PROJECT CONSISTS OF REMOVAL AND 1 of 2$6,655,730Low, 6.0% under the second
21 JAN 2026A30039NevadaTHE PURPOSE OF THIS PROJECT IS TO OVERLAY APPROXIMATELY 11.417 MILES OF HIGHWAY 371 IN NEVADA COUNTY. THIS PROJECT CONSISTS OF AGGREGATE BAS2 of 2$5,040,830+6.0%
21 JAN 2026A70035DallasTHE PURPOSE OF THIS PROJECT IS TO OVERLAY APPROXIMATELY 18.322 MILES OF HIGHWAY 8 IN DALLAS COUNTY. THIS PROJECT CONSISTS OF REMOVAL AND DIS1 of 2$6,396,427Low, 2.0% under the second
21 JAN 2026SA2045DallasTHE PURPOSE OF THIS PROJECT IS TO OVERLAY APPROXIMATELY 1.02 MILES OF CO. RD. 236 IN DALLAS COUNTY. THIS PROJECT CONSISTS OF ACHM SURFACE CO3 of 4$211,541+19%
21 JAN 2026SA7041UnionTHE PURPOSE OF THIS PROJECT IS TO OVERLAY APPROXIMATELY 3.97 MILES OF CO. RD. 2 (WESSON RD.) IN UNION COUNTY. THIS PROJECT CONSISTS OF ACHM 1 of 1$981,119Low
05 NOV 2025A30038Hempstead, NevadaTHE PURPOSE OF THIS PROJECT IS TO MILL AND OVERLAY APPROXIMATELY 18.369 MILES OF HIGHWAY 278 IN HEMPSTEAD AND NEVADA COUNTIES. THIS PROJECT 3 of 4$8,886,0480.0%
05 NOV 2025A70040OuachitaTHE PURPOSE OF THIS PROJECT IS TO OVERLAY APPROXIMATELY 11.039 MILES OF HIGHWAY 79 IN OUACHITA COUNTY. THIS PROJECT CONSISTS OF REMOVAL AND 1 of 3$3,524,764Low, 12% under the second
05 NOV 2025A70043ColumbiaTHE PURPOSE OF THIS PROJECT IS TO OVERLAY APPROXIMATELY 9.203 MILES OF HIGHWAY 371 IN COLUMBIA COUNTY. THIS PROJECT CONSISTS OF REMOVAL AND 1 of 3$4,600,035Low, 6.0% under the second
21 MAY 2025SA1067ClarkTHE PURPOSE OF THIS PROJECT IS TO OVERLAY APPROXIMATELY 1.60 MILES OF COUNTY ROAD 38 IN CLARK COUNTY. THIS PROJECT CONSISTS OF ACHM SURFACE 3 of 5$372,083+11%
09 APR 2025SA0769CalhounTHE PURPOSE OF THIS PROJECT IS TO OVERLAY APPROXIMATELY 2.08 MILES OF COUNTY ROAD 35 IN CALHOUN COUNTY. THIS PROJECT CONSISTS OF AGGREGATE B1 of 2$450,370Low, 16% under the second
09 APR 2025SA2044DallasTHE PURPOSE OF THIS PROJECT IS TO OVERLAY APPROXIMATELY 1.04 MILES OF COUNTY ROADS 6 AND 19 IN DALLAS COUNTY. THIS PROJECT CONSISTS OF ACHM 2 of 4$309,642+8.0%
26 FEB 2025A30041LafayetteTHE PURPOSE OF THIS PROJECT IS TO LEVEL AND OVERLAY APPROXIMATELY 13.318 MILES OF HIGHWAYS 29 AND 160 IN LAFAYETTE COUNTY. THIS PROJECT CONS1 of 4$7,296,683Low, 3.0% under the second
26 FEB 2025A70034ColumbiaTHE PURPOSE OF THIS PROJECT IS TO LEVEL AND OVERLAY APPROXIMATELY 5.443 MILES OF HIGHWAY 79 IN COLUMBIA COUNTY. THIS PROJECT CONSISTS OF REM1 of 3$3,472,528Low, 13% under the second
26 FEB 2025A70037CalhounTHE PURPOSE OF THIS PROJECT IS TO MILL AND OVERLAY APPROXIMATELY 8.507 MILES OF HIGHWAY 79 IN CALHOUN COUNTY. THIS PROJECT CONSISTS OF REMOV1 of 1$8,815,926Low
15 JAN 2025A30034NevadaTHE PURPOSE OF THIS PROJECT IS TO MILL, INLAY, AND OVERLAY APPROXIMATELY 15.688 MILES OF HIGHWAYS 24 AND 371 IN NEVADA COUNTY. THIS PROJECT 2 of 3$11,086,649+8.0%
15 JAN 2025A70036Clark, NevadaTHE PURPOSE OF THIS PROJECT IS TO OVERLAY APPROXIMATELY 9.154 MILES OF HIGHWAY 67 IN CLARK AND NEVADA COUNTIES. THIS PROJECT CONSISTS OF REM2 of 3$5,848,149+9.0%
22 MAY 2024SA5258OuachitaTHE PURPOSE OF THIS PROJECT IS TO OVERLAY APPROXIMATELY 2.71 MILES OF COUNTY ROADS 23 AND 88 IN OUACHITA COUNTY. THIS PROJECT CONSISTS OF AG1 of 2$880,902Low, 2.0% under the second
10 APR 2024A30035NevadaTHE PURPOSE OF THIS PROJECT IS TO MILL AND OVERLAY APPROXIMATELY 10.668 MILES OF HIGHWAY 278 IN NEVADA COUNTY. THIS PROJECT CONSISTS OF REMO1 of 2$5,225,210Low, 50% under the second
10 APR 2024070537ClevelandTHE PURPOSE OF THIS PROJECT IS TO SPOT LEVEL, PATCH, AND OVERLAY WITH 2' SHOULDER ON APPROXIMATELY 8.335 MILES ON HIGHWAY 114 IN CLEVELAND C2 of 2$5,813,631+11%
28 FEB 2024A70026Clark, DallasTHE PURPOSE OF THIS PROJECT IS TO OVERLAY APPROXIMATELY 20.719 MILES OF HIGHWAY 7 IN CLARK AND DALLAS COUNTIES. THIS PROJECT CONSISTS OF REM1 of 1$6,958,183Low
28 FEB 2024A70027DallasTHE PURPOSE OF THIS PROJECT IS TO LEVEL AND OVERLAY APPROXIMATELY 15.230 MILES OF HIGHWAY 273 IN DALLAS COUNTY. THIS PROJECT CONSISTS OF REM1 of 1$7,994,333Low
Jet Asphalt & Rock Co., Inc.: latest ARDOT bids in the data

How this record was read

ARDOT monthly bid tab PDFs (morning and afternoon sessions), January 2022 to November 2026. Base bids are printed in whole dollars; on A+B and A+C jobs the base bid is kept, and the published rank follows the award amount.

  • Every bid counted here matched its published total to within one dollar; ARDOT's rank decides who was low.
  • The gap to the low bid is the firm's total over the low total, minus one, on contracts it did not win, leaving out bids over three times the low bid.
  • A record covers the lettings in the data, not every contract the firm ever bid. Coverage by year is on the state page.

A name split in two, or a figure that does not match the owner's tabulation? Write to mehdi@miragemetrics.com and we correct it.

Your own bid history, read the same way