ARDOT contract A30041 bid tabulation

THE PURPOSE OF THIS PROJECT IS TO LEVEL AND OVERLAY APPROXIMATELY 13.318 MILES OF HIGHWAYS 29 AND 160 IN LAFAYETTE COUNTY. THIS PROJECT CONSISTS OF REMOVAL AND DISPOSAL ITEMS, EARTHWORK, TRENCHING AND SHOULDER PREPARATION, AGGREGATE BASE COURSE, ACHM BINDER AND SURFACE COURSES, COLD MILLING ASPHALT PAVEMENT, ACHM PATCHING OF EXISTING ROADWAY, APPROACH GUTTERS, MAINTENANCE OF TRAFFIC, GUARDRAIL, EROSION CONTROL, RUMBLE STRIPS AND STRIPES, PAVEMENT MARKING, AND MISC. ITEMS. Let by Arkansas DOT on February 26, 2025, Lafayette. 4 bids received; low bid $7,296,683 by Jet Asphalt & Rock Co., Inc..

Owner
Arkansas DOT
Letting
26 FEB 2025
Pay items
45
Data through
04 NOV 2026

Bidders

RankBidderTotal bidAgainst the low bid
1Jet Asphalt & Rock Co., Inc.$7,296,683Low
2Cranford Construction Co.$7,544,815+3.0%
3R. K. Hall, LLC$7,812,849+7.0%
4Redstone Construction Group, Inc.$8,126,662+11%
ARDOT contract A30041: bids by rank

Bid tabulation

LinePay itemUnitQuantity1. Jet Asphalt & Rock Co., Inc.2. Cranford Construction Co.3. R. K. Hall, LLC4. Redstone Construction Group, Inc.
0001Removal and disposal of approach gutters (202052)EACH4$2,500.00$3,707.95$3,930.43$3,893.35
0002Removal and disposal of guardrail (202132)LF2,375$8.00$8.15$4.24$4.00
0003Unclassified excavation (210213)CY120$65.00$97.32$42.53$335.60
0004Compacted embankment (210611)CY60$105.00$206.38$53.44$171.36
0005Trenching and shoulder preparation (215011)STA494$121.00$66.37$316.89$209.68
0006Aggregate base course (class 7) (303117)TON4,384$65.00$60.83$95.80$68.91
0007Tack coat (401011)GAL70,408$0.10$0.01$4.89$0.01
0008Mineral aggregate in achm binder course (1") (406161)TON4,997$127.00$145.03$140.65$159.67
0009Asphalt binder (PG 70-22) in achm binder course (1") (minimum bid $120.00) (406412)TON230$120.00$135.03$120.00$159.67
0010Mineral aggregate in achm surface course (1/2") (407162)TON32,755$136.00$143.58$135.20$154.80
0011Asphalt binder (PG 64-22) in achm surface course (1/2") (minimum bid $120.00) (407432)TON17$120.00$365.03$120.00$120.00
0012Asphalt binder (PG 70-22) in achm surface course (1/2") (minimum bid $120.00) (407442)TON1,963$127.00$131.04$120.00$120.00
0013Cold milling asphalt pavement (412002)SY4,736$8.00$14.88$11.82$10.23
0014Asphalt concrete patching for maintenance of traffic (414011)TON337$300.00$207.65$200.04$287.10
0015Achm patching of existing roadway (415011)TON600$300.00$243.85$200.01$354.76
0016Approach gutters (504264)CY84.60$2,000.00$2,680.09$2,840.90$2,680.09
0017Maintenance of traffic (603009)LS1$300,000$332,646$140,274$191,579
0018Signs (604003)SF989$6.00$4.00$4.24$6.00
0019Construction pavement markings (604041)LF567,072$0.16$0.16$0.17$0.16
0020Removal of permanent pavement markings (604061)LF1,067$1.40$1.15$1.22$1.40
0021Guardrail (type A) (617005)LF2,875$26.00$26.00$31.80$30.00
0022Guardrail terminal (type 2) (617312)EACH12$2,600.00$2,600.00$3,074.00$2,900.00
0023Thrie beam guardrail terminal (617332)EACH12$2,150.00$2,150.00$2,014.00$1,900.00
0024Lime (620001)TON1$125.00$125.00$132.50$125.00
0025Seeding (620011)ACRE0.50$3,526.29$3,526.30$3,737.88$3,526.29
0026Mulch cover (620022)ACRE1$2,986.13$2,986.13$3,165.30$2,986.13
0027Water (620030)MGAL61.20$10.00$10.00$10.00$10.00
0028Temporary seeding (621001)ACRE0.50$2,629.14$2,629.14$2,786.88$2,629.14
0029Silt fence (621021)LF2,875$3.68$3.68$3.90$3.68
0030Sediment removal and disposal (621111)CY106$20.00$72.93$57.47$7.74
0031Wattle (20") (621173)LF90$15.29$15.29$16.21$15.29
0032Roadway construction control (635001)LS1$30,000$7,991.39$36,926$4,293.43
0033Mailboxes (637001)EACH30$50.00$55.00$58.30$50.00
0034Mailbox supports (single) (637017)EACH14$150.00$95.00$100.70$150.00
0035Mailbox supports (double) (637018)EACH8$165.00$110.00$116.60$165.00
0036Rumble strips in asphalt shoulders (642001)LF31,528$0.13$0.25$0.27$0.13
0037Rumble stripes in asphalt shoulders (642011)LF77,570$0.13$0.22$0.23$0.13
0038Centerline rumble stripes in asphalt roadways (642102)LF19,705$0.13$0.22$0.23$0.13
0039Portable traffic signal system - actuated (701603)WEEK12$1,000.00$2,021.14$1,484.00$1,000.00
0040Thermoplastic pavement marking white (6") (719002)LF141,768$0.82$0.68$0.72$0.82
0041Thermoplastic pavement marking white (12") (719005)LF28$11.00$7.00$7.42$11.00
0042Thermoplastic pavement marking yellow (6") (719102)LF141,768$0.52$0.68$0.72$0.52
0043Raised pavement markers (type II) (721002)EACH888$4.75$3.50$3.71$4.75
0044Reinforcing steel-roadway (grade 60) (804003)LB9,564$2.50$2.50$2.65$2.50
0045Mobilization (unit bid amount may not exceed 5% of subtotal) (601001)LS1$212,524$78,525$234,385$207,656
ARDOT contract A30041: unit prices by line

The pay item list has one row per line (item, description, unit, quantity, the low bidder's unit price), the flat layout estimating software imports. Pay items with a page of their own open their price history.

Source

Read from ARDOT's tabulation for this contract. ARDOT monthly bid tab PDFs (morning and afternoon sessions), January 2022 to November 2026. Base bids are printed in whole dollars; on A+B and A+C jobs the base bid is kept, and the published rank follows the award amount.

Every contract let that day: ARDOT letting of February 26, 2025. Compiled by Mirage Metrics.

Your own bid history, read the same way

Mirage deploys AI agents for heavy civil estimating teams: quantities from the plan set, specs and addenda read, and bid tabs compared, inside your systems and your rules.

We use your email to reply to you and, now and then, to tell you about Mirage. You can opt out at any time. Privacy policy