Redstone Construction Group, Inc.: ARDOT bid record

Redstone Construction Group, Inc. submitted 93 bids on Arkansas DOT contracts in the data, from 06 NOV 2024 to 04 NOV 2026, and was the low bidder on 32 of them (34%). When it was not low, its total sat a median +15% above the low bid.

Owner
Arkansas DOT
Low bid volume
$135,640,382
Latest bid
04 NOV 2026
Data through
04 NOV 2026
93Bids
32Low bids
34Win rate, percent
+15%Median gap to the low bid when not low, 61 bids

By year

YearBidsLow bidsWin rate
20246233%
2025441636%
2026431433%
Redstone Construction Group, Inc., ARDOT: bids and low bids by year of letting

By county

CountyBidsLow bidsWin rate
Pulaski12542%
Prairie5240%
Dallas5240%
Hot Spring4250%
Jefferson4375%
Pike300%
Hempstead3267%
Saline3267%
Garland300%
Grant300%
Clark3133%
Little River3133%
Redstone Construction Group, Inc., ARDOT: bids and low bids by county

Pay items where it is most often lowest

Pay itemCodeUnitLines bidLowest on the lineIts median priceAll bidders' median
Signs604003SF9259 (64%)$6.40$8.40
Construction pavement markings604041LF5533 (60%)$0.16$0.28
Asphalt binder (PG 64-22) in achm surface course (1/2") (minimum bid $120.00)407432TON3633 (92%)$120.00$120.00
Raised pavement markers (type II)721002EACH5729 (51%)$4.90$6.50
Asphalt binder (PG 70-22) in achm surface course (1/2") (minimum bid $120.00)407442TON3029 (97%)$120.00$120.00
Thermoplastic pavement marking white (6")719002LF4627 (59%)$0.67$0.90
Aggregate base course (class 7)303117TON6526 (40%)$55.36$52.19
Thermoplastic pavement marking yellow (6")719102LF4625 (54%)$0.64$0.85
Asphalt binder (PG 64-22) in achm surface course (3/8") (minimum bid $120.00)407431TON2420 (83%)$120.00$120.00
Traffic drums604023EACH3419 (56%)$30.36$33.00
Water620030MGAL2419 (79%)$10.00$10.00
Achm patching of existing roadway415011TON7818 (23%)$301.69$250.00
Redstone Construction Group, Inc., ARDOT: pay items where its unit price was the lowest on the line

A line counts when the firm priced it and at least one other bidder did too; the lowest unit price on the line counts whoever won the contract. Token prices and bids over three times the low bid are left out.

Who it meets most

Redstone Construction Group, Inc., ARDOT: the firms on the same contracts most often

Latest bids

LetContractCountyProjectRankIts bidAgainst the low bid
04 NOV 2026A20044ArkansasTHE PURPOSE OF THIS PROJECT IS TO OVERLAY APPROXIMATELY 23.707 MILES OF HIGHWAY 130 IN ARKANSAS COUNTY. THIS PROJECT CONSISTS OF REMOVAL AND4 of 4$11,389,557+31%
04 NOV 2026A30049Hempstead, HowardTHE PURPOSE OF THIS PROJECT IS TO MILL AND OVERLAY APPROXIMATELY 18.474 MILES OF HIGHWAY 73 IN HEMPSTEAD AND HOWARD COUNTIES. THIS PROJECT C2 of 3$7,946,491+12%
04 NOV 2026061922GarlandTHE PURPOSE OF THIS PROJECT IS TO IMPROVE ADA COMPLIANCE AND SAFETY FOR PEDESTRIANS ON HIGHWAYS 7 AND 70B IN GARLAND COUNTY. THIS PROJECT CO2 of 2$7,897,804+81%
04 NOV 2026A60066PulaskiTHE PURPOSE OF THIS PROJECT IS TO MILL AND OVERLAY APPROXIMATELY 5.078 MILES OF HIGHWAY 338 IN PULASKI COUNTY. THIS PROJECT CONSISTS OF EART2 of 2$2,935,278+22%
04 NOV 2026A70050ClarkTHE PURPOSE OF THIS PROJECT IS TO OVERLAY APPROXIMATELY 12.433 MILES OF HIGHWAY 182 IN CLARK COUNTY. THIS PROJECT CONSISTS OF REMOVAL AND DI1 of 2$5,459,333Low, 37% under the second
23 SEP 2026061921PulaskiTHE PURPOSE OF THIS PROJECT IS TO CONSTRUCT CROSSWALKS, PEDESTRIAN, AND ADA IMPROVEMENTS ON HIGHWAYS 10 AND 365 IN PULASKI COUNTY. THIS PROJ3 of 3$3,155,177+19%
23 SEP 2026061938PulaskiTHE PURPOSE OF THIS PROJECT IS TO PLACE GUARDRAILS ALONG VARIOUS INTERSTATES IN PULASKI COUNTY. THIS PROJECT CONSISTS OF REMOVAL AND DISPOSA2 of 2$14,954,812+1.0%
23 SEP 2026061950PulaskiTHE PURPOSE OF THIS PROJECT IS TO RESURFACE AND UPDATE PAVEMENT MARKING OF THE PARKING LOTS AT THE ARDOT CENTRAL OFFICE IN PULASKI COUNTY. T1 of 2$725,172Low, 10% under the second
23 SEP 2026SA2046DallasTHE PURPOSE OF THIS PROJECT IS TO OVERLAY APPROXIMATELY 0.96 MILE OF COUNTY ROAD 246 IN DALLAS COUNTY. THIS PROJECT CONSISTS OF ACHM SURFACE1 of 3$299,878Low, 11% under the second
12 AUG 2026030531Little RiverTHE PURPOSE OF THIS PROJECT IS TO RAISE THE ROADWAY GRADE ON HIGHWAY 71 IN LITTLE RIVER COUNTY. THIS PROJECT CONSISTS OF CLEARING AND GRUBBI4 of 6$22,934,421+34%
12 AUG 2026A30046MillerTHE PURPOSE OF THIS PROJECT IS TO DO A CONCRETE PAVEMENT REPAIR ON INTERSTATE 30 IN MILLER COUNTY. THIS PROJECT CONSISTS OF REMOVAL AND DISP4 of 4$1,915,990+48%
24 JUN 2026A60063GarlandTHE PURPOSE OF THIS PROJECT IS TO MILL AND OVERLAY APPROXIMATELY 5.876 MILES OF HIGHWAY 7 IN GARLAND COUNTY. THIS PROJECT CONSISTS OF ACHM S2 of 2$4,767,671+9.0%
24 JUN 2026SA3056Hot SpringTHE PURPOSE OF THIS PROJECT IS TO OVERLAY APPROXIMATELY 2.99 MILES OF SYCAMORE DR. IN HOT SPRING COUNTY. THIS PROJECT CONSISTS OF ACHM SURFA1 of 2$619,693Low, 6.0% under the second
24 JUN 2026SA4051LincolnTHE PURPOSE OF THIS PROJECT IS TO OVERLAY APPROXIMATELY 1.49 MILES OF DAKOTA ROAD AND APPROXIMATELY 0.51 MILE OF ALEXANDER ROAD IN LINCOLN C2 of 2$478,442+5.0%
24 JUN 2026SA5956PrairieTHE PURPOSE OF THIS PROJECT IS TO OVERLAY APPROXIMATELY 0.80 MILE OF W. JACKSON ST. IN PRAIRIE COUNTY. THIS PROJECT CONSISTS OF ACHM SURFACE1 of 5$119,468Low, 3.0% under the second
20 MAY 2026A10052Lee, MonroeTHE PURPOSE OF THIS PROJECT IS TO OVERLAY APPROXIMATELY 4.776 MILES OF HIGHWAY 79 IN LEE AND MONROE COUNTIES. THIS PROJECT CONSISTS OF AGGRE3 of 5$911,253+8.0%
20 MAY 2026020802JeffersonTHE PURPOSE OF THIS PROJECT IS TO IMPROVE THE INTERSECTION AT HIGHWAYS 15 AND 31 WITH CHANNELIZATION IN JEFFERSON COUNTY. THIS PROJECT CONSI5 of 5$2,055,243+77%
20 MAY 2026A60058Hot SpringTHE PURPOSE OF THIS PROJECT IS TO MILL, OVERLAY, AND PLACE ULTRATHIN BONDED WEARING COURSE ON APPROXIMATELY 10.115 MILES OF HIGHWAY 270 IN H2 of 2$3,755,489+11%
20 MAY 2026A70042Calhoun, DallasTHE PURPOSE OF THIS PROJECT IS TO OVERLAY AND PLACE ULTRATHIN BONDED WEARING COURSE ON APPROXIMATELY 13.680 MILES OF HIGHWAY 274 IN CALHOUN 1 of 2$4,358,636Low, 12% under the second
20 MAY 2026C73017WhiteTHE PURPOSE OF THIS PROJECT IS TO CONSTRUCT 0.331 MILE OF CITY STREET IN WHITE COUNTY. THIS PROJECT CONSISTS OF CLEARING AND GRUBBING, REMOV4 of 5$776,640+16%
20 MAY 2026FA5310PerryTHE PURPOSE OF THIS PROJECT IS TO SURFACE APPROXIMATELY 5.28 MILES OF UNION VALLEY RD. IN PERRY COUNTY. THIS PROJECT CONSISTS OF AGGREGATE B2 of 3$1,847,093+3.0%
20 MAY 2026SA4141Little RiverTHE PURPOSE OF THIS PROJECT IS TO SURFACE APPROXIMATELY 1.00 MILE OF CO. RD. 51 IN LITTLE RIVER COUNTY. THIS PROJECT CONSISTS OF AGGREGATE B1 of 4$324,580Low, 6.0% under the second
08 APR 2026110876CrittendenTHE PURPOSE OF THIS PROJECT RESURFACE APPROXIMATELY 2.174 MILES ON INTERSTATE 40 IN CRITTENDEN COUNTY. THIS PROJECT CONSISTS OF AGGREGATE BA3 of 3$17,046,377+31%
08 APR 2026A30028HowardTHE PURPOSE OF THIS PROJECT IS TO LEVEL AND OVERLAY APPROXIMATELY 9.327 MILES OF HIGHWAY 278 IN HOWARD COUNTY. THIS PROJECT CONSISTS OF REMO4 of 4$6,515,645+20%
08 APR 2026C20006DallasTHE PURPOSE OF THIS PROJECT IS TO OVERLAY APPROXIMATELY 1.20 MILES OF VARIOUS CITY STREETS IN THE CITY OF CARTHAGE IN DALLAS COUNTY. THIS PR1 of 3$366,900Low, 36% under the second
Redstone Construction Group, Inc.: latest ARDOT bids in the data

How this record was read

ARDOT monthly bid tab PDFs (morning and afternoon sessions), January 2022 to November 2026. Base bids are printed in whole dollars; on A+B and A+C jobs the base bid is kept, and the published rank follows the award amount.

  • Every bid counted here matched its published total to within one dollar; ARDOT's rank decides who was low.
  • The gap to the low bid is the firm's total over the low total, minus one, on contracts it did not win, leaving out bids over three times the low bid.
  • A record covers the lettings in the data, not every contract the firm ever bid. Coverage by year is on the state page.

A name split in two, or a figure that does not match the owner's tabulation? Write to mehdi@miragemetrics.com and we correct it.

Your own bid history, read the same way

Mirage deploys AI agents for heavy civil estimating teams: quantities from the plan set, specs and addenda read, and bid tabs compared, inside your systems and your rules.