Tri State Asphalt, Inc.: ARDOT bid record
Tri State Asphalt, Inc. submitted 34 bids on Arkansas DOT contracts in the data, from 12 JAN 2022 to 13 AUG 2025, and was the low bidder on 13 of them (38%). When it was not low, its total sat a median +35% above the low bid.
- Owner
- Arkansas DOT
- Low bid volume
- $8,592,110
- Latest bid
- 13 AUG 2025
- Data through
- 04 NOV 2026
By year
| Year | Bids | Low bids | Win rate |
|---|---|---|---|
| 2022 | 3 | 3 | 100% |
| 2023 | 3 | 3 | 100% |
| 2024 | 6 | 5 | 83% |
| 2025 | 22 | 2 | 9% |
By county
| County | Bids | Low bids | Win rate |
|---|---|---|---|
| Sevier | 4 | 4 | 100% |
| Little River | 3 | 3 | 100% |
| Polk | 2 | 1 | 50% |
| Howard | 2 | 2 | 100% |
| Miller | 2 | 0 | 0% |
| Conway | 2 | 0 | 0% |
| Hempstead, Pike | 1 | 1 | 100% |
| Polk, Sevier | 1 | 1 | 100% |
| Montgomery | 1 | 0 | 0% |
| Nevada | 1 | 0 | 0% |
| Howard, Sevier | 1 | 1 | 100% |
| Calhoun | 1 | 0 | 0% |
Pay items where it is most often lowest
| Pay item | Code | Unit | Lines bid | Lowest on the line | Its median price | All bidders' median |
|---|---|---|---|---|---|---|
| Signs | 604003 | SF | 24 | 21 (88%) | $7.00 | $8.40 |
| Reflectorized paint pavement marking yellow (4") | 718101 | LF | 18 | 12 (67%) | $0.16 | $0.21 |
| Asphalt binder (PG 64-22) in achm surface course (1/2") (minimum bid $120.00) | 407432 | TON | 14 | 7 (50%) | $139.50 | $120.00 |
| Achm patching of existing roadway | 415011 | TON | 22 | 6 (27%) | $250.00 | $250.00 |
| Mineral aggregate in achm surface course (3/8") | 407161 | TON | 9 | 5 (56%) | $162.00 | $124.22 |
| Standard sign | 726002 | SF | 5 | 4 (80%) | $22.00 | $25.38 |
| Channel post sign support (type C) | 729003 | EACH | 5 | 4 (80%) | $85.00 | $89.00 |
| Tack coat | 401011 | GAL | 19 | 3 (16%) | $6.00 | $3.75 |
| Reflectorized paint pavement marking white (4") | 718001 | LF | 7 | 3 (43%) | $0.15 | $0.23 |
| Aggregate base course (class 7) | 303117 | TON | 11 | 1 (9%) | $60.00 | $52.19 |
| Asphalt binder (PG 64-22) in achm surface course (3/8") (minimum bid $120.00) | 407431 | TON | 9 | 1 (11%) | $250.00 | $120.00 |
| Cold milling asphalt pavement | 412002 | SY | 5 | 1 (20%) | $13.00 | $8.00 |
A line counts when the firm priced it and at least one other bidder did too; the lowest unit price on the line counts whoever won the contract. Token prices and bids over three times the low bid are left out.
Who it meets most
| Firm | Contracts in common | That firm ranked ahead |
|---|---|---|
| Redstone Construction Group, Inc. | 9 | 7 of 9 |
| Blackstone Construction, LLC | 7 | 6 of 7 |
| Cranford Construction Co. | 6 | 5 of 6 |
| R. K. Hall, LLC | 5 | 0 of 5 |
| CK Asphalt, LLC | 5 | 5 of 5 |
| Atlas Asphalt, Inc. | 5 | 5 of 5 |
| Rogers Group, Inc. | 5 | 5 of 5 |
| Delta Asphalt of Arkansas, Inc. | 3 | 3 of 3 |
| Smackover Paving Co. | 2 | 1 of 2 |
| Jet Asphalt & Rock Co., Inc. | 2 | 2 of 2 |
Latest bids
| Let | Contract | County | Project | Rank | Its bid | Against the low bid |
|---|---|---|---|---|---|---|
| 13 AUG 2025 | SA0563 | Boone | THE PURPOSE OF THIS PROJECT IS TO OVERLAY APPROXIMATELY 3.26 MILES OF COUNTY ROAD 47 IN BOONE COUNTY. THIS PROJECT CONSISTS OF AGGREGATE BAS | 3 of 3 | $853,932 | +65% |
| 13 AUG 2025 | SA1563 | Conway | THE PURPOSE OF THIS PROJECT IS TO OVERLAY APPROXIMATELY 0.87 MILE OF COUNTY ROAD 55 IN CONWAY COUNTY. THIS PROJECT CONSISTS OF AGGREGATE SUR | 3 of 3 | $301,622 | +79% |
| 13 AUG 2025 | SA2378 | Faulkner | THE PURPOSE OF THIS PROJECT IS TO OVERLAY APPROXIMATELY 0.75 MILE OF OLD HWY. 25 IN FAULKNER COUNTY. THIS PROJECT CONSISTS OF AGGREGATE SURF | 4 of 4 | $236,411 | +82% |
| 25 JUN 2025 | SA7634 | Hempstead, Nevada | THE PURPOSE OF THIS PROJECT IS TO OVERLAY APPROXIMATELY 0.53 MILE OF COUNTY ROADS 262 & 55 IN NEVADA & HEMPSTEAD COUNTIES. THIS PROJECT CONS | 2 of 4 | $161,355 | +1.0% |
| 21 MAY 2025 | SA1067 | Clark | THE PURPOSE OF THIS PROJECT IS TO OVERLAY APPROXIMATELY 1.60 MILES OF COUNTY ROAD 38 IN CLARK COUNTY. THIS PROJECT CONSISTS OF ACHM SURFACE | 4 of 5 | $395,508 | +18% |
| 21 MAY 2025 | SA1259 | Cleburne | THE PURPOSE OF THIS PROJECT IS TO OVERLAY APPROXIMATELY 2.99 MILES OF COUNTY ROADS 61 AND 373 IN CLEBURNE COUNTY. THIS PROJECT CONSISTS OF A | 5 of 5 | $566,207 | +39% |
| 21 MAY 2025 | SA1562 | Conway | THE PURPOSE OF THIS PROJECT IS TO OVERLAY APPROXIMATELY 1.95 MILES OF COUNTY ROAD 89 IN CONWAY COUNTY. THIS PROJECT CONSISTS OF AGGREGATE BA | 4 of 4 | $448,787 | +56% |
| 21 MAY 2025 | SA4554 | Marion | THE PURPOSE OF THIS PROJECT IS TO OVERLAY APPROXIMATELY 1.50 MILES OF COUNTY ROADS 14 & 222 IN MARION COUNTY. THIS PROJECT CONSISTS OF AGGRE | 3 of 3 | $397,190 | +44% |
| 21 MAY 2025 | SA5452 | Phillips | THE PURPOSE OF THIS PROJECT IS TO OVERLAY APPROXIMATELY 0.71 MILE OF COUNTY ROAD 68 IN PHILLIPS COUNTY. THIS PROJECT CONSISTS OF ACHM SURFAC | 2 of 2 | $276,910 | +38% |
| 21 MAY 2025 | SA5864 | Pope | THE PURPOSE OF THIS PROJECT IS TO OVERLAY APPROXIMATELY 3.49 MILES OF COUNTY ROADS 133, 98, AND 136 IN POPE COUNTY. THIS PROJECT CONSISTS OF | 2 of 2 | $788,667 | +31% |
| 21 MAY 2025 | SA6058 | Pulaski | THE PURPOSE OF THIS PROJECT IS TO OVERLAY 0.97 MILE OF COUNTY ROAD 26 IN PULASKI COUNTY. THIS PROJECT CONSISTS OF AGGREGATE BASE COURSE (CLA | 4 of 4 | $281,770 | +32% |
| 21 MAY 2025 | SA6948 | Stone | THE PURPOSE OF THIS PROJECT IS TO OVERLAY APPROXIMATELY 3.21 MILES OF COUNTY ROADS 83 & 86 IN STONE COUNTY. THIS PROJECT CONSISTS OF AGGREGA | 3 of 3 | $683,953 | +35% |
| 21 MAY 2025 | SA73A0 | White | THE PURPOSE OF THIS PROJECT IS TO OVERLAY APPROXIMATELY 3.10 MILES OF COUNTY ROADS 97 AND 149 IN WHITE COUNTY. THIS PROJECT CONSISTS OF ACHM | 4 of 4 | $673,810 | +41% |
| 09 APR 2025 | SA0769 | Calhoun | THE PURPOSE OF THIS PROJECT IS TO OVERLAY APPROXIMATELY 2.08 MILES OF COUNTY ROAD 35 IN CALHOUN COUNTY. THIS PROJECT CONSISTS OF AGGREGATE B | 2 of 2 | $523,634 | +16% |
| 09 APR 2025 | SA2756 | Grant | THE PURPOSE OF THIS PROJECT IS TO OVERLAY APPROXIMATELY 2.00 MILES OF COUNTY ROAD 51 IN GRANT COUNTY. THIS PROJECT CONSISTS OF AGGREGATE BAS | 3 of 3 | $603,598 | +69% |
| 09 APR 2025 | SA6258 | Saline | THE PURPOSE OF THIS PROJECT IS TO OVERLAY 1.20 MILES OF COUNTY ROAD 39 IN SALINE COUNTY. THIS PROJECT CONSISTS OF ACHM SURFACE COURSE, COLD | 3 of 3 | $405,337 | +59% |
| 09 APR 2025 | SA6650 | Sevier | THE PURPOSE OF THIS PROJECT IS TO REPLACE A DRAINAGE STRUCTURE ON COUNTY ROAD 12 IN SEVIER COUNTY. THIS PROJECT CONSISTS OF STONE BACKFILL, | 1 of 5 | $311,510 | Low, 29% under the second |
| 15 JAN 2025 | C46004 | Miller | THE PURPOSE OF THIS PROJECT IS TO OVERLAY APPROXIMATELY 0.50 MILE OF EUCLID STREET IN THE CITY OF TEXARKANA IN MILLER COUNTY. THIS PROJECT C | 2 of 3 | $346,340 | +11% |
| 15 JAN 2025 | C46005 | Miller | THE PURPOSE OF THIS PROJECT IS TO OVERLAY APPROXIMATELY 1.10 MILES OF WILSON STREET AND MLK JR. BLVD. IN THE CITY OF GARLAND IN MILLER COUNT | 2 of 3 | $290,719 | +4.0% |
| 15 JAN 2025 | C50008 | Nevada | THE PURPOSE OF THIS PROJECT IS TO OVERLAY APPROXIMATELY 0.30 MILE OF LAKE ROAD IN THE CITY OF CALE, APPROXIMATELY 1.34 MILES OF VARIOUS CITY | 4 of 5 | $906,743 | +22% |
| 15 JAN 2025 | C57007 | Polk | THE PURPOSE OF THIS PROJECT IS TO OVERLAY APPROXIMATELY 0.46 MILES OF 4TH STREET AND 0.07 MILES OF ADAIR STREET IN THE CITY OF VANDERVOORT I | 2 of 3 | $262,258 | +7.0% |
| 15 JAN 2025 | C76089 | Howard, Sevier | THE PURPOSE OF THIS PROJECT IS TO OVERLAY APPROXIMATELY 1.35 MILES OF VARIOUS CITY STREETS IN THE CITY OF BEN LOMOND IN SEVIER COUNTY, APPRO | 1 of 4 | $900,741 | Low, 11% under the second |
| 10 APR 2024 | SA4140 | Little River | THE PURPOSE OF THIS PROJECT IS TO OVERLAY APPROXIMATELY 2.00 MILES OF COUNTY ROAD 29 IN LITTLE RIVER COUNTY. THIS PROJECT CONSISTS OF AGGREG | 1 of 1 | $542,915 | Low |
| 10 APR 2024 | SA4942 | Montgomery | THE PURPOSE OF THIS PROJECT IS TO OVERLAY APPROXIMATELY 1.50 MILES OF COUNTY ROAD 20 IN MONTGOMERY COUNTY. THIS PROJECT CONSISTS OF ASPHALT | 2 of 2 | $469,463 | +1.0% |
| 10 APR 2024 | SA6648 | Sevier | THE PURPOSE OF THIS PROJECT IS TO OVERLAY APPROXIMATELY 1.83 MILES OF CO. RD. LANDFILL ROAD IN SEVIER COUNTY. THIS PROJECT CONSISTS OF AGGRE | 1 of 1 | $598,537 | Low |
How this record was read
ARDOT monthly bid tab PDFs (morning and afternoon sessions), January 2022 to November 2026. Base bids are printed in whole dollars; on A+B and A+C jobs the base bid is kept, and the published rank follows the award amount.
- Every bid counted here matched its published total to within one dollar; ARDOT's rank decides who was low.
- The gap to the low bid is the firm's total over the low total, minus one, on contracts it did not win, leaving out bids over three times the low bid.
- A record covers the lettings in the data, not every contract the firm ever bid. Coverage by year is on the state page.
A name split in two, or a figure that does not match the owner's tabulation? Write to mehdi@miragemetrics.com and we correct it.
Your own bid history, read the same way
Mirage deploys AI agents for heavy civil estimating teams: quantities from the plan set, specs and addenda read, and bid tabs compared, inside your systems and your rules.