ARDOT contract SA6650 bid tabulation

THE PURPOSE OF THIS PROJECT IS TO REPLACE A DRAINAGE STRUCTURE ON COUNTY ROAD 12 IN SEVIER COUNTY. THIS PROJECT CONSISTS OF STONE BACKFILL, AGGREGATE BASE COURSE, MAINTENANCE OF TRAFFIC, MINOR DRAINAGE STRUCTURES, PAVEMENT REPAIR OVER CULVERTS, EROSION CONTROL ITEMS, AND MISC. ITEMS. Let by Arkansas DOT on April 9, 2025, Sevier. 5 bids received; low bid $311,510 by Tri State Asphalt, Inc..

Owner
Arkansas DOT
Letting
09 APR 2025
Pay items
21
Data through
04 NOV 2026

Bidders

RankBidderTotal bidAgainst the low bid
1Tri State Asphalt, Inc.$311,510Low
2Redstone Construction Group, Inc.$402,350+29%
3Taylor-Hendrix, LLC$402,634+29%
4Mobley Contractors, Inc.$731,778+135%
5Robinson Construction, LLC$742,852+138%
ARDOT contract SA6650: bids by rank

Bid tabulation

LinePay itemUnitQuantity1. Tri State Asphalt, Inc.2. Redstone Construction Group, Inc.3. Taylor-Hendrix, LLC4. Mobley Contractors, Inc.5. Robinson Construction, LLC
0001Removal and disposal of pipe culverts (202096)EACH3$1,000.00$5,629.65$4,500.00$26,259$2,500.00
0002Stone backfill (207001)TON1,800$65.00$72.62$49.25$118.89$78.65
0003Aggregate base course (class 7) (303117)TON40$90.00$220.36$80.00$137.83$85.00
0004Maintenance of traffic (603009)LS1$12,000$37,750$40,000$156,446$165,000
0005Signs (604003)SF262$6.00$9.45$8.40$8.10$17.25
0006Barricades (604013)LF64$25.00$18.90$35.00$33.75$26.55
0007Selected pipe bedding (606990)CY85$116.30$130.00$50.00$30.74$135.00
0008Pavement repair over culverts (asphalt) (615002)TON125$250.00$325.00$535.50$573.75$425.00
0009Silt fence (621021)LF200$20.00$5.23$7.20$6.72$25.00
0010Sand bag ditch checks (621031)BAG88$44.00$14.55$12.00$18.71$24.00
0011Sediment removal and disposal (621111)CY40$100.00$15.00$2.00$56.53$75.00
0012Rock ditch checks (621151)CY12$160.00$185.00$50.00$151.30$155.00
0013Filter blanket (816001)SY150$80.00$16.00$6.00$34.24$85.00
0014Dumped riprap (816011)CY102$120.00$205.00$130.00$284.18$165.00
0016117" X 79" aluminum coated corrugated steel arch pipe culvert (12 gauge) (606558)LF180$390.00$575.00$797.00$661.31
0017117" X 79" polymer precoated metallic coated corrugated steel arch pipe culvert (12 gauge) (606617)LF180$1,535.00
0018Mobilization (unit bid amount may not exceed 5% of subtotal) (601001)LS1$14,800$18,000$17,740$34,520$35,000
0019Lime (620001)TON1$2,500.00$131.25$500.00$168.75$650.00
0020Seeding (620011)ACRE0.10$12,500$13,125$8,000.00$16,875$2,500.00
0021Mulch cover (620022)ACRE0.10$12,500$13,125$8,000.00$16,875$2,500.00
0022Water (620030)MGAL10.20$350.00$10.50$100.00$13.50$55.00
ARDOT contract SA6650: unit prices by line

The pay item list has one row per line (item, description, unit, quantity, the low bidder's unit price), the flat layout estimating software imports. Pay items with a page of their own open their price history.

Source

Read from ARDOT's tabulation for this contract. ARDOT monthly bid tab PDFs (morning and afternoon sessions), January 2022 to November 2026. Base bids are printed in whole dollars; on A+B and A+C jobs the base bid is kept, and the published rank follows the award amount.

Every contract let that day: ARDOT letting of April 9, 2025. Compiled by Mirage Metrics.

Your own bid history, read the same way

Mirage deploys AI agents for heavy civil estimating teams: quantities from the plan set, specs and addenda read, and bid tabs compared, inside your systems and your rules.

We use your email to reply to you and, now and then, to tell you about Mirage. You can opt out at any time. Privacy policy