Mobley Contractors, Inc.: ARDOT bid record
Mobley Contractors, Inc. submitted 69 bids on Arkansas DOT contracts in the data, from 12 JAN 2022 to 04 NOV 2026, and was the low bidder on 15 of them (22%). When it was not low, its total sat a median +21% above the low bid.
- Owner
- Arkansas DOT
- Low bid volume
- $120,524,882
- Latest bid
- 04 NOV 2026
- Data through
- 04 NOV 2026
By year
| Year | Bids | Low bids | Win rate |
|---|---|---|---|
| 2022 | 15 | 3 | 20% |
| 2023 | 15 | 3 | 20% |
| 2024 | 10 | 4 | 40% |
| 2025 | 13 | 2 | 15% |
| 2026 | 16 | 3 | 19% |
By county
| County | Bids | Low bids | Win rate |
|---|---|---|---|
| Prairie | 5 | 2 | 40% |
| Greene | 4 | 0 | 0% |
| Cross | 4 | 1 | 25% |
| Mississippi | 3 | 0 | 0% |
| White | 3 | 0 | 0% |
| Clark | 3 | 0 | 0% |
| Lonoke | 3 | 0 | 0% |
| Crawford | 3 | 3 | 100% |
| Garland | 2 | 1 | 50% |
| Pope | 2 | 0 | 0% |
| Columbia | 2 | 1 | 50% |
| Jefferson | 2 | 1 | 50% |
Pay items where it is most often lowest
| Pay item | Code | Unit | Lines bid | Lowest on the line | Its median price | All bidders' median |
|---|---|---|---|---|---|---|
| Water | 620030 | MGAL | 64 | 25 (39%) | $10.00 | $10.00 |
| Sediment removal and disposal | 621111 | CY | 63 | 22 (35%) | $14.84 | $18.14 |
| Barricades | 604013 | LF | 58 | 20 (34%) | $23.10 | $25.00 |
| Epoxy coated reinforcing steel (grade 60) | 804023 | LB | 34 | 20 (59%) | $1.95 | $2.00 |
| Silt fence | 621021 | LF | 62 | 19 (31%) | $3.56 | $3.68 |
| Signs | 604003 | SF | 63 | 18 (29%) | $9.45 | $8.40 |
| Lime | 620001 | TON | 63 | 18 (29%) | $105.00 | $105.00 |
| Seeding | 620011 | ACRE | 63 | 18 (29%) | $1,417.50 | $1,500.00 |
| Temporary seeding | 621001 | ACRE | 58 | 18 (31%) | $787.50 | $805.89 |
| Traffic drums | 604023 | EACH | 54 | 18 (33%) | $31.50 | $33.00 |
| Mulch cover | 620022 | ACRE | 63 | 17 (27%) | $1,050.00 | $1,150.00 |
| Asphalt binder (PG 64-22) in achm surface course (1/2") (minimum bid $120.00) | 407432 | TON | 57 | 17 (30%) | $126.00 | $120.00 |
A line counts when the firm priced it and at least one other bidder did too; the lowest unit price on the line counts whoever won the contract. Token prices and bids over three times the low bid are left out.
Who it meets most
| Firm | Contracts in common | That firm ranked ahead |
|---|---|---|
| Robertson Contractors, Inc. | 33 | 22 of 33 |
| West Plains BR. & Grading, LLC | 11 | 9 of 11 |
| Capital Paving & Construction, LLC | 11 | 5 of 11 |
| Kesser International, Inc. | 9 | 4 of 9 |
| Seagraves Construction, Inc. | 7 | 6 of 7 |
| Central Arkansas Contractors, Inc. | 7 | 3 of 7 |
| White River Materials, Inc. | 7 | 6 of 7 |
| 1911 Construction Company, Inc. | 7 | 5 of 7 |
| Manhattan Road & Bridge Co. | 6 | 3 of 6 |
| Thomco, Inc. | 6 | 3 of 6 |
Latest bids
| Let | Contract | County | Project | Rank | Its bid | Against the low bid |
|---|---|---|---|---|---|---|
| 04 NOV 2026 | BR4401 | Madison | THE PURPOSE OF THIS PROJECT IS TO REPLACE THE BRIDGE STRUCTURE ON 0.452 MILE OF COUNTY ROAD 7 SOUTH OF HUNTSVILLE IN MADISON COUNTY. THIS PR | 5 of 5 | $5,846,182 | +28% |
| 23 SEP 2026 | 110716 | Phillips | THE PURPOSE OF THIS PROJECT IS TO REPLACE THREE STRUCTURES ON HIGHWAYS 185 AND 318 IN PHILLIPS COUNTY. THIS PROJECT CONSISITS OF CLEARING AN | 7 of 8 | $3,989,844 | +33% |
| 23 SEP 2026 | 070458 | Columbia | THE PURPOSE OF THIS PROJECT IS TO CONSTRUCT ONE FOUR LANE MEDIAN STRUCTURE ON HIGHWAY 82 IN COLUMBIA COUNTY. THIS PROJECT CONSISTS OF CLEARI | 1 of 7 | $27,033,828 | Low, 7.0% under the second |
| 23 SEP 2026 | CB0401 | Benton | THE PURPOSE OF THIS PROJECT IS TO CONSTRUCT A QUINT. 12' X 8' R.C. BOX CULVERT AND APPROACHES ON 0.138 MILE OF BREDEHOEFT ROAD IN THE CITY O | 1 of 6 | $1,094,785 | Low, 18% under the second |
| 24 JUN 2026 | 061748 | Garland | THE PURPOSE OF THIS PROJECT IS TO REPLACE ONE BRIDGE ON HIGHWAY 600 IN GARLAND COUNTY. THIS PROJECT CONSISTS OF CLEARING AND GRUBBING, REMOV | 2 of 5 | $1,949,558 | +3.0% |
| 24 JUN 2026 | C22005 | Drew | THE PURPOSE OF THIS PROJECT IS TO REPLACE ONE BRIDGE STRUCTURE AND CONSTRUCT APPROACHES ON 0.043 MILE OF 7TH STREET IN WILMAR IN DREW COUNTY | 4 of 6 | $739,240 | +21% |
| 24 JUN 2026 | BR2814 | Greene | THE PURPOSE OF THIS PROJECT IS TO REPLACE 1 BRIDGE AND RECONSTRUCT APPROXIMATELY 0.123 MILE OF COUNTY ROAD 49 IN GREENE COUNTY. THIS PROJECT | 5 of 7 | $1,772,744 | +26% |
| 20 MAY 2026 | 020802 | Jefferson | THE PURPOSE OF THIS PROJECT IS TO IMPROVE THE INTERSECTION AT HIGHWAYS 15 AND 31 WITH CHANNELIZATION IN JEFFERSON COUNTY. THIS PROJECT CONSI | 3 of 5 | $1,446,009 | +25% |
| 20 MAY 2026 | C73017 | White | THE PURPOSE OF THIS PROJECT IS TO CONSTRUCT 0.331 MILE OF CITY STREET IN WHITE COUNTY. THIS PROJECT CONSISTS OF CLEARING AND GRUBBING, REMOV | 5 of 5 | $830,518 | +24% |
| 08 APR 2026 | 110751 | Lee | THE PURPOSE OF THIS PROJECT IS TO REPLACE ONE STRUCTURE ON HIGHWAY 121 IN LEE COUNTY. THIS PROJECT CONSISTS OF CLEARING AND GRUBBING, REMOVA | 5 of 8 | $1,832,841 | +32% |
| 08 APR 2026 | 110831 | Cross | THE PURPOSE OF THIS PROJECT IS TO REPAIR A SLIDE ON HIGHWAY 42 IN CROSS COUNTY. THIS PROJECT CONSISITS OF CLEARING AND GRUBBING, REMOVAL AND | 3 of 7 | $5,606,549 | +20% |
| 08 APR 2026 | 110832 | Cross | THE PURPOSE OF THIS PROJECT IS TO REPAIR A SLIDE ON HIGHWAY 75 IN CROSS COUNTY. THIS PROJECT CONSISITS OF CLEARING AND GRUBBING, EARTHWORK, | 2 of 8 | $2,711,148 | +7.0% |
| 04 MAR 2026 | 020738 | Arkansas | THE PURPOSE OF THIS PROJECT IS TO REPLACE A STRUCTURE ON COUNTY ROAD BENZAL LANE IN ARKANSAS COUNTY. THIS PROJECT CONSISTS OF CLEARING AND G | 1 of 4 | $3,033,588 | Low, 8.0% under the second |
| 04 MAR 2026 | 101003 | Randolph | THE PURPOSE OF THIS PROJECT IS TO REPLACE ONE STRUCTURE ON HIGHWAY 90 IN RANDOLPH COUNTY. THIS PROJECT CONSISTS OF CLEARING AND GRUBBING, RE | 4 of 5 | $4,539,552 | +32% |
| 04 MAR 2026 | 101100 | Greene | THE PURPOSE OF THIS PROJECT IS TO REPLACE A BRIDGE WITH A R.C BOX CULVERT ON HIGHWAY 34 IN GREENE COUNTY. THIS PROJECT CONSISTS OF CLEARING | 3 of 4 | $2,919,854 | +33% |
| 21 JAN 2026 | FA1108 | Clay | THE PURPOSE OF THIS PROJECT IS TO REPLACE 1 BRIDGE AND RECONSTRUCT APPROXIMATELY 1.01 MILES OF COUNTRY ROAD 53 IN CLAY COUNTY. THIS PROJECT | 7 of 7 | $4,793,584 | +62% |
| 05 NOV 2025 | 090672 | Searcy | THE PURPOSE OF THIS PROJECT IS TO REALIGN HWY. 66 IN SEARCY COUNTY. THIS PROJECT CONSISTS OF CLEARING AND GRUBBING, REMOVAL AND DISPOSAL ITE | 5 of 6 | $9,927,797 | +55% |
| 17 SEP 2025 | 070509 | Clark | THE PURPOSE OF THIS PROJECT IS TO REPLACE ONE STRUCTURE ON HIGHWAY 67 IN CLARK COUNTY. THIS PROJECT CONSISTS OF CLEARING AND GRUBBING, REMOV | 2 of 6 | $19,873,131 | +4.0% |
| 17 SEP 2025 | 090647 | Baxter | THE PURPOSE OF THIS PROJECT IS TO REPLACE ONE STRUCTURE ON HIGHWAY 5 IN BAXTER COUNTY. THIS PROJECT CONSISTS OF REMOVAL AND DISPOSAL ITEMS, | 5 of 6 | $3,771,941 | +59% |
| 25 JUN 2025 | 061745 | Lonoke | THE PURPOSE OF THIS PROJECT IS TO REPLACE ONE STRUCTURE ON HIGHWAY 13 IN LONOKE COUNTY. THIS PROJECT CONSISTS OF CLEARING AND GRUBBING, REMO | 3 of 3 | $4,385,081 | +10% |
| 21 MAY 2025 | 110861 | Cross | THE PURPOSE OF THIS PROJECT IS TO REPLACE ONE STRUCTURE ON HIGHWAY 42 IN CROSS COUNTY. THIS PROJECT CONSISTS OF CLEARING AND GRUBBING, REMOV | 3 of 3 | $6,005,209 | +8.0% |
| 21 MAY 2025 | 040866 | Washington | THE PURPOSE OF THIS PROJECT IS TO REPLACE THREE STRUCTURES ON HIGHWAY 45 IN WASHINGTON COUNTY. THIS PROJECT CONSISTS OF CLEARING AND GRUBBIN | 4 of 6 | $10,211,974 | +7.0% |
| 21 MAY 2025 | 061467 | Prairie | THE PURPOSE OF THIS PROJECT IS TO CONSTRUCT TWO STRUCTURES ON HIGHWAYS 63 AND 70 IN PRAIRIE COUNTY. THIS PROJECT CONSISTS OF REMOVAL AND DIS | 3 of 3 | $7,934,027 | +23% |
| 09 APR 2025 | 061856 | Prairie | THE PURPOSE OF THIS PROJECT IS TO IMPROVE APPROXIMATELY 0.197 MILE OF A Y-INTERSECTION ON HIGHWAYS 63 AND 70 IN PRAIRIE COUNTY. THIS PROJECT | 6 of 6 | $585,223 | +88% |
| 09 APR 2025 | SA6650 | Sevier | THE PURPOSE OF THIS PROJECT IS TO REPLACE A DRAINAGE STRUCTURE ON COUNTY ROAD 12 IN SEVIER COUNTY. THIS PROJECT CONSISTS OF STONE BACKFILL, | 4 of 5 | $731,778 | +135% |
How this record was read
ARDOT monthly bid tab PDFs (morning and afternoon sessions), January 2022 to November 2026. Base bids are printed in whole dollars; on A+B and A+C jobs the base bid is kept, and the published rank follows the award amount.
- Every bid counted here matched its published total to within one dollar; ARDOT's rank decides who was low.
- The gap to the low bid is the firm's total over the low total, minus one, on contracts it did not win, leaving out bids over three times the low bid.
- A record covers the lettings in the data, not every contract the firm ever bid. Coverage by year is on the state page.
A name split in two, or a figure that does not match the owner's tabulation? Write to mehdi@miragemetrics.com and we correct it.
Your own bid history, read the same way
Mirage deploys AI agents for heavy civil estimating teams: quantities from the plan set, specs and addenda read, and bid tabs compared, inside your systems and your rules.