Mobley Contractors, Inc.: ARDOT bid record

Mobley Contractors, Inc. submitted 69 bids on Arkansas DOT contracts in the data, from 12 JAN 2022 to 04 NOV 2026, and was the low bidder on 15 of them (22%). When it was not low, its total sat a median +21% above the low bid.

Owner
Arkansas DOT
Low bid volume
$120,524,882
Latest bid
04 NOV 2026
Data through
04 NOV 2026
69Bids
15Low bids
22Win rate, percent
+21%Median gap to the low bid when not low, 54 bids

By year

YearBidsLow bidsWin rate
202215320%
202315320%
202410440%
202513215%
202616319%
Mobley Contractors, Inc., ARDOT: bids and low bids by year of letting

By county

CountyBidsLow bidsWin rate
Prairie5240%
Greene400%
Cross4125%
Mississippi300%
White300%
Clark300%
Lonoke300%
Crawford33100%
Garland2150%
Pope200%
Columbia2150%
Jefferson2150%
Mobley Contractors, Inc., ARDOT: bids and low bids by county

Pay items where it is most often lowest

Pay itemCodeUnitLines bidLowest on the lineIts median priceAll bidders' median
Water620030MGAL6425 (39%)$10.00$10.00
Sediment removal and disposal621111CY6322 (35%)$14.84$18.14
Barricades604013LF5820 (34%)$23.10$25.00
Epoxy coated reinforcing steel (grade 60)804023LB3420 (59%)$1.95$2.00
Silt fence621021LF6219 (31%)$3.56$3.68
Signs604003SF6318 (29%)$9.45$8.40
Lime620001TON6318 (29%)$105.00$105.00
Seeding620011ACRE6318 (29%)$1,417.50$1,500.00
Temporary seeding621001ACRE5818 (31%)$787.50$805.89
Traffic drums604023EACH5418 (33%)$31.50$33.00
Mulch cover620022ACRE6317 (27%)$1,050.00$1,150.00
Asphalt binder (PG 64-22) in achm surface course (1/2") (minimum bid $120.00)407432TON5717 (30%)$126.00$120.00
Mobley Contractors, Inc., ARDOT: pay items where its unit price was the lowest on the line

A line counts when the firm priced it and at least one other bidder did too; the lowest unit price on the line counts whoever won the contract. Token prices and bids over three times the low bid are left out.

Who it meets most

FirmContracts in commonThat firm ranked ahead
Robertson Contractors, Inc.3322 of 33
West Plains BR. & Grading, LLC119 of 11
Capital Paving & Construction, LLC115 of 11
Kesser International, Inc.94 of 9
Seagraves Construction, Inc.76 of 7
Central Arkansas Contractors, Inc.73 of 7
White River Materials, Inc.76 of 7
1911 Construction Company, Inc.75 of 7
Manhattan Road & Bridge Co.63 of 6
Thomco, Inc.63 of 6
Mobley Contractors, Inc., ARDOT: the firms on the same contracts most often

Latest bids

LetContractCountyProjectRankIts bidAgainst the low bid
04 NOV 2026BR4401MadisonTHE PURPOSE OF THIS PROJECT IS TO REPLACE THE BRIDGE STRUCTURE ON 0.452 MILE OF COUNTY ROAD 7 SOUTH OF HUNTSVILLE IN MADISON COUNTY. THIS PR5 of 5$5,846,182+28%
23 SEP 2026110716PhillipsTHE PURPOSE OF THIS PROJECT IS TO REPLACE THREE STRUCTURES ON HIGHWAYS 185 AND 318 IN PHILLIPS COUNTY. THIS PROJECT CONSISITS OF CLEARING AN7 of 8$3,989,844+33%
23 SEP 2026070458ColumbiaTHE PURPOSE OF THIS PROJECT IS TO CONSTRUCT ONE FOUR LANE MEDIAN STRUCTURE ON HIGHWAY 82 IN COLUMBIA COUNTY. THIS PROJECT CONSISTS OF CLEARI1 of 7$27,033,828Low, 7.0% under the second
23 SEP 2026CB0401BentonTHE PURPOSE OF THIS PROJECT IS TO CONSTRUCT A QUINT. 12' X 8' R.C. BOX CULVERT AND APPROACHES ON 0.138 MILE OF BREDEHOEFT ROAD IN THE CITY O1 of 6$1,094,785Low, 18% under the second
24 JUN 2026061748GarlandTHE PURPOSE OF THIS PROJECT IS TO REPLACE ONE BRIDGE ON HIGHWAY 600 IN GARLAND COUNTY. THIS PROJECT CONSISTS OF CLEARING AND GRUBBING, REMOV2 of 5$1,949,558+3.0%
24 JUN 2026C22005DrewTHE PURPOSE OF THIS PROJECT IS TO REPLACE ONE BRIDGE STRUCTURE AND CONSTRUCT APPROACHES ON 0.043 MILE OF 7TH STREET IN WILMAR IN DREW COUNTY4 of 6$739,240+21%
24 JUN 2026BR2814GreeneTHE PURPOSE OF THIS PROJECT IS TO REPLACE 1 BRIDGE AND RECONSTRUCT APPROXIMATELY 0.123 MILE OF COUNTY ROAD 49 IN GREENE COUNTY. THIS PROJECT5 of 7$1,772,744+26%
20 MAY 2026020802JeffersonTHE PURPOSE OF THIS PROJECT IS TO IMPROVE THE INTERSECTION AT HIGHWAYS 15 AND 31 WITH CHANNELIZATION IN JEFFERSON COUNTY. THIS PROJECT CONSI3 of 5$1,446,009+25%
20 MAY 2026C73017WhiteTHE PURPOSE OF THIS PROJECT IS TO CONSTRUCT 0.331 MILE OF CITY STREET IN WHITE COUNTY. THIS PROJECT CONSISTS OF CLEARING AND GRUBBING, REMOV5 of 5$830,518+24%
08 APR 2026110751LeeTHE PURPOSE OF THIS PROJECT IS TO REPLACE ONE STRUCTURE ON HIGHWAY 121 IN LEE COUNTY. THIS PROJECT CONSISTS OF CLEARING AND GRUBBING, REMOVA5 of 8$1,832,841+32%
08 APR 2026110831CrossTHE PURPOSE OF THIS PROJECT IS TO REPAIR A SLIDE ON HIGHWAY 42 IN CROSS COUNTY. THIS PROJECT CONSISITS OF CLEARING AND GRUBBING, REMOVAL AND3 of 7$5,606,549+20%
08 APR 2026110832CrossTHE PURPOSE OF THIS PROJECT IS TO REPAIR A SLIDE ON HIGHWAY 75 IN CROSS COUNTY. THIS PROJECT CONSISITS OF CLEARING AND GRUBBING, EARTHWORK, 2 of 8$2,711,148+7.0%
04 MAR 2026020738ArkansasTHE PURPOSE OF THIS PROJECT IS TO REPLACE A STRUCTURE ON COUNTY ROAD BENZAL LANE IN ARKANSAS COUNTY. THIS PROJECT CONSISTS OF CLEARING AND G1 of 4$3,033,588Low, 8.0% under the second
04 MAR 2026101003RandolphTHE PURPOSE OF THIS PROJECT IS TO REPLACE ONE STRUCTURE ON HIGHWAY 90 IN RANDOLPH COUNTY. THIS PROJECT CONSISTS OF CLEARING AND GRUBBING, RE4 of 5$4,539,552+32%
04 MAR 2026101100GreeneTHE PURPOSE OF THIS PROJECT IS TO REPLACE A BRIDGE WITH A R.C BOX CULVERT ON HIGHWAY 34 IN GREENE COUNTY. THIS PROJECT CONSISTS OF CLEARING 3 of 4$2,919,854+33%
21 JAN 2026FA1108ClayTHE PURPOSE OF THIS PROJECT IS TO REPLACE 1 BRIDGE AND RECONSTRUCT APPROXIMATELY 1.01 MILES OF COUNTRY ROAD 53 IN CLAY COUNTY. THIS PROJECT 7 of 7$4,793,584+62%
05 NOV 2025090672SearcyTHE PURPOSE OF THIS PROJECT IS TO REALIGN HWY. 66 IN SEARCY COUNTY. THIS PROJECT CONSISTS OF CLEARING AND GRUBBING, REMOVAL AND DISPOSAL ITE5 of 6$9,927,797+55%
17 SEP 2025070509ClarkTHE PURPOSE OF THIS PROJECT IS TO REPLACE ONE STRUCTURE ON HIGHWAY 67 IN CLARK COUNTY. THIS PROJECT CONSISTS OF CLEARING AND GRUBBING, REMOV2 of 6$19,873,131+4.0%
17 SEP 2025090647BaxterTHE PURPOSE OF THIS PROJECT IS TO REPLACE ONE STRUCTURE ON HIGHWAY 5 IN BAXTER COUNTY. THIS PROJECT CONSISTS OF REMOVAL AND DISPOSAL ITEMS, 5 of 6$3,771,941+59%
25 JUN 2025061745LonokeTHE PURPOSE OF THIS PROJECT IS TO REPLACE ONE STRUCTURE ON HIGHWAY 13 IN LONOKE COUNTY. THIS PROJECT CONSISTS OF CLEARING AND GRUBBING, REMO3 of 3$4,385,081+10%
21 MAY 2025110861CrossTHE PURPOSE OF THIS PROJECT IS TO REPLACE ONE STRUCTURE ON HIGHWAY 42 IN CROSS COUNTY. THIS PROJECT CONSISTS OF CLEARING AND GRUBBING, REMOV3 of 3$6,005,209+8.0%
21 MAY 2025040866WashingtonTHE PURPOSE OF THIS PROJECT IS TO REPLACE THREE STRUCTURES ON HIGHWAY 45 IN WASHINGTON COUNTY. THIS PROJECT CONSISTS OF CLEARING AND GRUBBIN4 of 6$10,211,974+7.0%
21 MAY 2025061467PrairieTHE PURPOSE OF THIS PROJECT IS TO CONSTRUCT TWO STRUCTURES ON HIGHWAYS 63 AND 70 IN PRAIRIE COUNTY. THIS PROJECT CONSISTS OF REMOVAL AND DIS3 of 3$7,934,027+23%
09 APR 2025061856PrairieTHE PURPOSE OF THIS PROJECT IS TO IMPROVE APPROXIMATELY 0.197 MILE OF A Y-INTERSECTION ON HIGHWAYS 63 AND 70 IN PRAIRIE COUNTY. THIS PROJECT6 of 6$585,223+88%
09 APR 2025SA6650SevierTHE PURPOSE OF THIS PROJECT IS TO REPLACE A DRAINAGE STRUCTURE ON COUNTY ROAD 12 IN SEVIER COUNTY. THIS PROJECT CONSISTS OF STONE BACKFILL, 4 of 5$731,778+135%
Mobley Contractors, Inc.: latest ARDOT bids in the data

How this record was read

ARDOT monthly bid tab PDFs (morning and afternoon sessions), January 2022 to November 2026. Base bids are printed in whole dollars; on A+B and A+C jobs the base bid is kept, and the published rank follows the award amount.

  • Every bid counted here matched its published total to within one dollar; ARDOT's rank decides who was low.
  • The gap to the low bid is the firm's total over the low total, minus one, on contracts it did not win, leaving out bids over three times the low bid.
  • A record covers the lettings in the data, not every contract the firm ever bid. Coverage by year is on the state page.

A name split in two, or a figure that does not match the owner's tabulation? Write to mehdi@miragemetrics.com and we correct it.

Your own bid history, read the same way