Thomco, Inc.: ARDOT bid record

Thomco, Inc. submitted 10 bids on Arkansas DOT contracts in the data, from 12 JAN 2022 to 04 NOV 2026, and was the low bidder on 4 of them (40%). When it was not low, its total sat a median +19% above the low bid.

Owner
Arkansas DOT
Low bid volume
$14,819,456
Latest bid
04 NOV 2026
Data through
04 NOV 2026
10Bids
4Low bids
40Win rate, percent
+19%Median gap to the low bid when not low, 6 bids

By year

YearBidsLow bidsWin rate
2022300%
20233267%
202511100%
20263133%
Thomco, Inc., ARDOT: bids and low bids by year of letting

By county

CountyBidsLow bidsWin rate
White200%
Drew200%
Nevada100%
Clark11100%
Saline11100%
Lonoke11100%
Garland11100%
Independence100%
Thomco, Inc., ARDOT: bids and low bids by county

Pay items where it is most often lowest

Pay itemCodeUnitLines bidLowest on the lineIts median priceAll bidders' median
Water620030MGAL99 (100%)$10.00$10.00
Barricades604013LF95 (56%)$22.05$25.00
Elastomeric bearings808002CUIN55 (100%)$4.00$4.78
Signs604003SF94 (44%)$8.00$8.40
Mineral aggregate in achm surface course (1/2")407162TON94 (44%)$115.50$124.55
Reinforcing steel-roadway (grade 60)804003LB94 (44%)$2.00$2.40
Cold milling asphalt pavement412002SY74 (57%)$8.50$8.00
Asphalt binder (PG 64-22) in achm surface course (1/2") (minimum bid $120.00)407432TON83 (38%)$844.75$120.00
Mulch cover620022ACRE83 (38%)$990.00$1,150.00
Temporary seeding621001ACRE83 (38%)$710.00$805.89
Rock ditch checks621151CY83 (38%)$93.50$105.00
Tack coat401011GAL73 (43%)$5.02$3.75
Thomco, Inc., ARDOT: pay items where its unit price was the lowest on the line

A line counts when the firm priced it and at least one other bidder did too; the lowest unit price on the line counts whoever won the contract. Token prices and bids over three times the low bid are left out.

Who it meets most

FirmContracts in commonThat firm ranked ahead
Mobley Contractors, Inc.63 of 6
Robertson Contractors, Inc.51 of 5
Kesser International, Inc.30 of 3
Capital Paving & Construction, LLC31 of 3
West Plains BR. & Grading, LLC22 of 2
Graylee Construction, LLC20 of 2
Taylor-Hendrix, LLC11 of 1
Belt Construction Inc.11 of 1
WL Bass Construction, Inc.11 of 1
JB James Construction, LLC10 of 1
Thomco, Inc., ARDOT: the firms on the same contracts most often

Latest bids

LetContractCountyProjectRankIts bidAgainst the low bid
04 NOV 2026050439IndependenceTHE PURPOSE OF THIS PROJECT IS TO REPLACE ONE BRIDGE ON HIGHWAY 25 IN INDEPENDENCE COUNTY. THIS PROJECT CONSISTS OF CLEARING AND GRUBBING, R2 of 5$5,142,038+23%
24 JUN 2026061748GarlandTHE PURPOSE OF THIS PROJECT IS TO REPLACE ONE BRIDGE ON HIGHWAY 600 IN GARLAND COUNTY. THIS PROJECT CONSISTS OF CLEARING AND GRUBBING, REMOV1 of 5$1,897,440Low, 3.0% under the second
24 JUN 2026C22005DrewTHE PURPOSE OF THIS PROJECT IS TO REPLACE ONE BRIDGE STRUCTURE AND CONSTRUCT APPROACHES ON 0.043 MILE OF 7TH STREET IN WILMAR IN DREW COUNTY2 of 6$651,353+7.0%
25 JUN 2025061745LonokeTHE PURPOSE OF THIS PROJECT IS TO REPLACE ONE STRUCTURE ON HIGHWAY 13 IN LONOKE COUNTY. THIS PROJECT CONSISTS OF CLEARING AND GRUBBING, REMO1 of 3$3,971,834Low, 3.0% under the second
01 NOV 2023070571ClarkTHE PURPOSE OF THIS PROJECT IS TO REPLACE RC BOX CULVERTS ON HIGHWAY 7 IN CLARK COUNTY. THIS PROJECT CONSISTS OF CLEARING AND GRUBBING, REMO1 of 2$1,689,662Low, 17% under the second
01 NOV 2023BR6210SalineTHE PURPOSE OF THIS PROJECT IS TO REPLACE 2 BRIDGES AND CONSTRUCT THE APPROACHES ON APPROXIMATELY 0.38 MILE OF COUNTY ROAD 65 IN SALINE COUN1 of 1$7,260,520Low
11 JAN 2023020475DrewTHE PURPOSE OF THIS PROJECT IS TO RESURFACE AND EXTEND HIGHWAY 83 SPUR AND CONSTRUCT TWO ROUNDABOUTS IN DREW COUNTY. THIS PROJECT CONSISTS O2 of 3$32,310,689+7.0%
21 SEP 2022050342WhiteTHE PURPOSE OF THIS PROJECT IS TO REPLACE THREE STRUCTURES ON HIGHWAY 31 IN WHITE COUNTY. THIS PROJECT CONSISTS OF CLEARING AND GRUBBING, RE5 of 6$12,560,679+15%
16 FEB 2022050417WhiteTHE PURPOSE OF THIS PROJECT IS TO REPLACE ONE STRUCTURE ON HIGHWAY 36 IN WHITE COUNTY. THIS PROJECT CONSISTS OF CLEARING AND GRUBBING, REMOV4 of 4$4,972,786+25%
12 JAN 2022BR5007NevadaTHE PURPOSE OF THIS PROJECT IS TO REPLACE A STRUCTURE AND CONSTRUCT APPROACHES ON APPROXIMATELY 0.218 MILE OF COUNTY ROAD 37 IN NEVADA COUNT4 of 6$1,246,541+23%
Thomco, Inc.: latest ARDOT bids in the data

How this record was read

ARDOT monthly bid tab PDFs (morning and afternoon sessions), January 2022 to November 2026. Base bids are printed in whole dollars; on A+B and A+C jobs the base bid is kept, and the published rank follows the award amount.

  • Every bid counted here matched its published total to within one dollar; ARDOT's rank decides who was low.
  • The gap to the low bid is the firm's total over the low total, minus one, on contracts it did not win, leaving out bids over three times the low bid.
  • A record covers the lettings in the data, not every contract the firm ever bid. Coverage by year is on the state page.

A name split in two, or a figure that does not match the owner's tabulation? Write to mehdi@miragemetrics.com and we correct it.

Your own bid history, read the same way

Mirage deploys AI agents for heavy civil estimating teams: quantities from the plan set, specs and addenda read, and bid tabs compared, inside your systems and your rules.

We use your email to reply to you and, now and then, to tell you about Mirage. You can opt out at any time. Privacy policy