ARDOT letting results, January 12, 2022
53 contracts let by Arkansas DOT on January 12, 2022, $140,198,709 in low bids, a median of 2 bidders per contract.
- Owner
- Arkansas DOT
- Contracts
- 53
- Low bids, total
- $140,198,709
- Data through
- 04 NOV 2026
Contracts let that day
| Contract | Project | County | Bids | Low bidder | Low bid | Second bid | Gap | Source |
|---|---|---|---|---|---|---|---|---|
| 100955 | THE PURPOSE OF THIS PROJECT IS TO REPLACE 14 STRUCTURES ON VARIOUS HIGHWAYS IN MISSISSIPPI COUNTY. THIS PROJECT CONSISTS OF CLEARING AND GRUBBING, REMOVAL AND D | Mississippi | 3 | Manhattan Road & Bridge Co. | $48,663,324 | $49,231,281 | +1.0% | ARDOT |
| 020702 | THE PURPOSE OF THIS PROJECT IS TO GRIND, PATCH, AND REHABILITATE APPROXIMATELY 9.438 MILES OF HIGHWAYS 63 AND 65B IN JEFFERSON COUNTY. THIS PROJECT CONSISTS OF | Jefferson | 4 | Diamond Surface, Inc. | $10,204,945 | $9,465,775 | -7.0% | ARDOT |
| A50009 | THE PURPOSE OF THIS PROJECT IS TO LEVEL AND OVERLAY WITH MINOR WIDENING ON APPROXIMATELY 21.972 MILES OF HIGHWAY 9 IN STONE COUNTY. THIS PROJECT CONSIST OF REMO | Stone | 2 | Atlas Asphalt, Inc. | $7,404,161 | $9,201,474 | +24% | ARDOT |
| A60015 | THE PURPOSE OF THIS PROJECT IS TO MILL, LEVEL, AND OVERLAY APPROXIMATELY 17.499 MILES OF HIGHWAY 9, SOUTH OF MALVERN, IN HOT SPRING COUNTY. THIS PROJECT CONSIST | Hot Spring | 1 | Jet Asphalt & Rock Co., Inc. | $7,251,907 | ARDOT | ||
| A20014 | THE PURPOSE OF THIS PROJECT IS TO OVERLAY APPROXIMATELY 13.595 MILES OF HIGHWAY 138 IN DESHA AND DREW COUNTIES. THIS PROJECT CONSIST OF TRENCHING AND SHOULDER P | Desha, Drew | 1 | Pine Bluff Sand & Gravel Co. | $6,371,659 | ARDOT | ||
| 110800 | THE PURPOSE OF THIS PROJECT IS TO EXPAND TRUCK PARKING. THIS PROJECT CONSISTS OF CLEARING AND GRUBBING, REMOVAL AND DISPOSAL ITEMS, EARTHWORK, CEMENT STABILIZED | Crittenden | 2 | Weaver-Bailey Contrs., Inc. | $6,120,039 | $7,094,394 | +16% | ARDOT |
| A70009 | THE PURPOSE OF THIS PROJECT IS TO PLACE AN ASPHALT SURFACE TREATMENT BEFORE LEVELING AND OVERLAY WITH ACHM SURFACE COURSE ON APPROXIMATELY 12.457 MILES OF HIGHW | Union | 1 | Jet Asphalt & Rock Co., Inc. | $5,175,443 | ARDOT | ||
| A30008 | THE PURPOSE OF THIS PROJECT IS TO MILL AND OVERLAY APPROXIMATELY 10.795 MILES OF HIGHWAYS 41 AND 70B AT DE QUEEN IN SEVIER COUNTY. THIS PROJECT CONSIST OF EARTH | Sevier | 1 | R. K. Hall, LLC | $4,936,441 | ARDOT | ||
| A70008 | THE PURPOSE OF THIS PROJECT IS TO LEVEL WITH ACHM SURFACE COURSE AND PLACE AN ULTRATHIN BONDED WEARING COURSE ON THE LANES AND AN ASPHALT SURFACE TREATMENT ON T | Cleveland, Dallas | 1 | Jet Asphalt & Rock Co., Inc. | $4,571,917 | ARDOT | ||
| BR2605 | THE PURPOSE OF THIS PROJECT IS TO REPLACE TWO STRUCTURES AND CONSTRUCT APPROACHES ON APPROXIMATELY 0.656 MILE OF COUNTY ROAD 63 IN GARLAND COUNTY. THIS PROJECT | Garland | 2 | Mobley Contractors, Inc. | $4,353,662 | $4,875,294 | +12% | ARDOT |
| A80013 | THE PURPOSE OF THIS PROJECT IS TO MILL AND OVERLAY APPROXIMATELY 12.359 MILES OF HIGHWAY 95, NORTH OF MORRILTON, IN CONWAY COUNTY. THIS PROJECT CONSIST OF AGGRE | Conway | 2 | Blackstone Construction, LLC | $4,258,248 | $4,300,759 | +1.0% | ARDOT |
| A10012 | THE PURPOSE OF THIS PROJECT IS TO MILL AND OVERLAY APPROXIMATELY 6.098 MILES OF HIGHWAY 20 AT HELENA-WEST HELENA IN PHILLIPS COUNTY. THIS PROJECT CONSIST OF AGG | Phillips | 2 | Atlas Asphalt, Inc. | $3,275,371 | $4,386,570 | +34% | ARDOT |
| A90013 | THE PURPOSE OF THIS PROJECT IS TO OVERLAY APPROXIMATELY 15.709 MILES OF HIGHWAY 14, SOUTH OF YELLVILLE, IN MARION COUNTY. THIS PROJECT CONSIST OF AGGREGATE BASE | Marion | 2 | Atlas Asphalt, Inc. | $3,036,765 | $3,227,710 | +6.0% | ARDOT |
| A00012 | THE PURPOSE OF THIS PROJECT IS TO LEVEL WITH ACHM SURFACE COURSE, PLACE AN ASPHALT SURFACE TREATMENT, AND ADD MINOR WIDENING ON APPROXIMATELY 10.534 MILES OF HI | Craighead | 2 | Delta Asphalt of Ark., Inc. | $1,875,387 | $1,889,937 | +1.0% | ARDOT |
| A00010 | THE PURPOSE OF THIS PROJECT IS TO LEVEL WITH ACHM SURFACE COURSE AND PLACE AN ASPHALT SURFACE TREATMENT ON 8.892 MILES OF HIGHWAYS 90 & 139 IN CLAY COUNTY. THIS | Clay | 1 | Delta Asphalt of Ark., Inc. | $1,703,907 | ARDOT | ||
| A40013 | THE PURPOSE OF THIS PROJECT IS TO OVERLAY APPROXIMATELY 5.505 MILES OF HIGHWAY 80, NORTHWEST OF WALDRON, IN SCOTT COUNTY. THIS PROJECT CONSIST OF AGGREGATE BASE | Scott | 2 | Blackstone Construction, LLC | $1,560,063 | $1,589,896 | +2.0% | ARDOT |
| SA5740 | THE PURPOSE OF THIS PROJECT IS TO OVERLAY APPROXIMATELY 6.80 MILES OF VARIOUS COUNTY ROADS IN POLK COUNTY. THIS PROJECT CONSISTS OF ACHM SURFACE COURSE, MAINTEN | Polk | 1 | Tri State Asphalt, Inc. | $1,326,119 | ARDOT | ||
| BR5007 | THE PURPOSE OF THIS PROJECT IS TO REPLACE A STRUCTURE AND CONSTRUCT APPROACHES ON APPROXIMATELY 0.218 MILE OF COUNTY ROAD 37 IN NEVADA COUNTY. THIS PROJECT CONS | Nevada | 6 | Taylor-Hendrix, LLC | $1,016,768 | $1,099,987 | +8.0% | ARDOT |
| A00023 | THE PURPOSE OF THIS PROJECT IS TO LEVEL WITH ACHM SURFACE COURSE AND PLACE AN ASPHALT SURFACE TREATMENT ON APPROXIMATELY 3.950 MILES OF HIGHWAY 158 IN MISSISSIP | Mississippi | 1 | Delta Asphalt of Ark., Inc. | $969,724 | ARDOT | ||
| SA2376 | THE PURPOSE OF THIS PROJECT IS TO OVERLAY APPROXIMATELY 6.69 MILES OF COUNTY ROAD 51 IN FAULKNER COUNTY. THIS PROJECT CONSISTS OF TRENCHING AND SHOULDER PREPARA | Faulkner | 2 | Rogers Group, Inc. | $952,859 | $979,687 | +3.0% | ARDOT |
| A80016 | THE PURPOSE OF THIS PROJECT IS TO MILL AND OVERLAY APPROXIMATELY 2.205 MILES OF HIGHWAY 9B AT MORRILTON IN CONWAY COUTY. THIS PROJECT CONSIST OF ACHM SURFACE CO | Conway | 2 | Rogers Group, Inc. | $881,121 | $941,614 | +7.0% | ARDOT |
| SA4838 | THE PURPOSE OF THIS PROJECT IS TO OVERLAY APPROXIMATELY 4.38 MILES OF COUNTY ROADS 21 AND 63 IN MONROE COUNTY. THIS PROJECT CONSISTS OF AGGREGATE BASE COURSE, A | Monroe | 1 | M & T Paving & Const. Co., Inc. | $802,338 | ARDOT | ||
| SA3146 | THE PURPOSE OF THIS PROJECT IS TO LEVEL AND RESEAL APPROXIMATELY 15.87 MILES OF VARIOUS COUNTY ROADS IN HOWARD COUNTY. THIS PROJECT CONSISTS OF ASPHALT SURFACE | Howard | 2 | Salt Creek Paving & Const. Co., Inc. | $777,959 | $804,437 | +3.0% | ARDOT |
| C75001 | THE PURPOSE OF THIS PROJECT IS TO OVERLAY APPROXIMATELY 1.83 MILES OF VARIOUS CITY STREETS IN THE CITY OF BELLEVILLE AND APPROXIMATELY 2.10 MILES OF VARIOUS CIT | Yell | 1 | Blackstone Construction, LLC | $754,376 | ARDOT | ||
| SA5560 | THE PURPOSE OF THIS PROJECT IS TO RESEAL APPROXIMATELY 12.12 MILES OF VARIOUS COUNTY ROADS IN PIKE COUNTY. THIS PROJECT CONSISTS OF ASPHALT SURFACE TREATMENT, A | Pike | 2 | Salt Creek Paving & Const. Co., Inc. | $746,667 | $793,425 | +6.0% | ARDOT |
| SA6345 | THE PURPOSE OF THIS PROJECT IS TO OVERLAY APPROXIMATELY 0.96 MILE OF COUNTY ROADS 300 AND 312 AND APPROXIMATELY 0.29 MILE OF COUNTY ROAD 76 IN SCOTT COUNTY. THI | Scott | 2 | Blackstone Construction, LLC | $729,791 | $736,540 | +1.0% | ARDOT |
| C50007 | THE PURPOSE OF THIS PROJECT IS TO OVERLAY AND SURFACE APPROXIMATELY 1.34 MILES OF VARIOUS CITY STREETS IN THE CITY OF PRESCOTT AND 0.54 MILE OF VARIOUS CITY STR | Nevada | 1 | Smackover Paving Co. | $638,082 | ARDOT | ||
| SA1557 | THE PURPOSE OF THIS PROJECT IS TO OVERLAY APPROXIMATELY 1.70 MILES OF COUNTY ROAD 22, SURFACE APPROXIMATELY 1.00 MILE OF COUNTY ROAD 72, AND SURFACE APPROXIMATE | Conway | 2 | Blackstone Construction, LLC | $628,781 | $724,393 | +15% | ARDOT |
| C08008 | THE PURPOSE OF THIS PROJECT IS TO OVERLAY APPROXIMATELY 2.82 MILES OF VARIOUS CITY STREETS IN THE CITY OF HOLIDAY ISLAND IN CARROLL COUNTY. THIS PROJECT CONSIST | Carroll | 2 | Marion County Paving, LLC | $607,722 | $658,262 | +8.0% | ARDOT |
| C15006 | THE PURPOSE OF THIS PROJECT IS TO OVERLAY APPROXIMATELY 3.04 MILES OF VARIOUS CITY STREETS IN THE CITY OF MORRILTON IN CONWAY COUNTY. THIS PROJECT CONSISTS OF A | Conway | 2 | Rogers Group, Inc. | $551,429 | $610,901 | +11% | ARDOT |
| SA7138 | THE PURPOSE OF THIS PROJECT IS TO OVERLAY APPROXIMATELY 3.39 MILES OF COUNTY ROAD 87 IN VAN BUREN COUNTY. THIS PROJECT CONSISTS OF AGGREGATE BASE COURSE, ACHM S | Van Buren | 3 | CK Asphalt, LLC | $545,131 | $613,953 | +13% | ARDOT |
| SA3856 | THE PURPOSE OF THIS PROJECT IS TO OVERLAY APPROXIMATELY 2.58 MILES OF COUNTY ROADS 22 AND 44 IN LAWRENCE COUNTY. THIS PROJECT CONSISTS OF AGGREGATE BASE COURSE, | Lawrence | 4 | Atlas Asphalt, Inc. | $516,552 | $538,958 | +4.0% | ARDOT |
| A60017 | THE PURPOSE OF THIS PROJECT IS TO MILL AND OVERLAY APPROXIMATELY 1.188 MILES OF HIGHWAY 89 IN CABOT, IN LONOKE COUNTY. THIS PROJECT CONSISTS OF COLD MILLING ASP | Lonoke | 2 | Rogers Group, Inc. | $507,792 | $571,604 | +13% | ARDOT |
| SA2867 | THE PURPOSE OF THIS PROJECT IS TO OVERLAY APPROXIMATELY 2.78 MILES OF COUNTY ROAD 63 IN GREENE COUNTY. THIS PROJECT CONSISTS OF AGGREGATE BASE COURSE, ACHM SURF | Greene | 3 | Delta Asphalt of Ark., Inc. | $488,678 | $518,489 | +6.0% | ARDOT |
| SA0652 | THE PURPOSE OF THIS PROJECT IS TO LEVEL AND RESEAL APPROXIMATELY 5.88 MILES OF COUNTY ROADS 8 AND 32 IN BRADLEY COUNTY. THIS PROJECT CONSISTS OF ASPHALT SURFACE | Bradley | 2 | Smackover Paving Co. | $436,297 | $473,717 | +9.0% | ARDOT |
| SA1772 | THE PURPOSE OF THIS PROJECT IS TO OVERLAY APPROXIMATELY 1.62 MILES OF COUNTY ROAD 25 IN CRAWFORD COUNTY. THIS PROJECT CONSISTS OF AGGREGATE BASE COURSE, ACHM SU | Crawford | 1 | Forsgren, Inc. | $413,827 | ARDOT | ||
| C32007 | THE PURPOSE OF THIS PROJECT IS TO OVERLAY APPROXIMATELY 2.06 MILES OF VARIOUS CITY STREETS IN THE CITY OF CUSHMAN IN INDEPENDENCE COUNTY. THIS PROJECT CONSISTS | Independence | 1 | Atlas Asphalt, Inc. | $371,704 | ARDOT | ||
| C23007 | THE PURPOSE OF THIS PROJECT IS TO OVERLAY APPROXIMATELY 2.85 MILES OF VARIOUS CITY STREETS IN THE CITY OF VILONIA IN FAULKNER COUNTY. THIS PROJECT CONSISTS OF A | Faulkner | 3 | CK Asphalt, LLC | $357,799 | $373,743 | +4.0% | ARDOT |
| C62009 | THE PURPOSE OF THIS PROJECT IS TO OVERLAY APPROXIMATELY 1.45 MILES AND SURFACE APPROXIMATELY 0.11 MILE OF VARIOUS CITY STREETS IN THE CITY OF HASKELL IN SALINE | Saline | 2 | Redstone Const. Group, Inc. | $353,003 | $375,815 | +6.0% | ARDOT |
| SA4047 | THE PURPOSE OF THIS PROJECT IS TO SURFACE APPROXIMATELY 3.25 MILES OF COUNTY ROAD 10 IN LINCOLN COUNTY. THIS PROJECT CONSISTS OF RECONSTRUCTED BASE COURSE, ASPH | Lincoln | 2 | Salt Creek Paving & Const. Co., Inc. | $348,214 | $424,880 | +22% | ARDOT |
| SA1665 | THE PURPOSE OF THIS PROJECT IS TO OVERLAY APPROXIMATELY 2.21 MILES OF COUNTY ROADS 65 AND 250 IN CRAIGHEAD COUNTY. THIS PROJECT CONSISTS OF AGGREGATE BASE COURS | Craighead | 2 | Atlas Asphalt, Inc. | $343,519 | $383,167 | +12% | ARDOT |
| C54004 | THE PURPOSE OF THIS PROJECT IS TO OVERLAY APPROXIMATELY 1.39 MILES OF VARIOUS CITY STREETS IN THE CITY OF ELAINE IN PHILLIPS COUNTY. THIS PROJECT CONSISTS OF RE | Phillips | 3 | M & T Paving & Const. Co., Inc. | $341,385 | $387,868 | +14% | ARDOT |
| C51002 | THE PURPOSE OF THIS PROJECT IS TO OVERLAY APPROXIMATELY 1.88 MILES OF VARIOUS STREETS IN THE CITY OF JASPER IN NEWTON COUNTY. THIS PROJECT CONSISTS OF ACHM SURF | Newton | 3 | Apac-Central, Inc. | $339,493 | $364,998 | +8.0% | ARDOT |
| C52006 | THE PURPOSE OF THIS PROJECT IS TO OVERLAY APPROXIMATELY 1.43 MILES OF VARIOUS CITY STREETS IN THE CITY OF BEARDEN IN OUACHITA COUNTY. THIS PROJECT CONSISTS OF A | Ouachita | 1 | Smackover Paving Co. | $329,907 | ARDOT | ||
| C53006 | THE PURPOSE OF THIS PROJECT IS TO OVERLAY APPROXIMATELY 2.24 MILES OF VARIOUS CITY STREETS IN THE CITY OF PERRYVILLE IN PERRY COUNTY. THIS PROJECT CONSISTS OF R | Perry | 2 | Rogers Group, Inc. | $309,298 | $320,160 | +4.0% | ARDOT |
| C36008 | THE PURPOSE OF THIS PROJECT IS TO OVERLAY APPROXIMATELY 1.44 MILES OF VARIOUS CITY STREETS IN THE CITY OF LAMAR IN JOHNSON COUNTY. THIS PROJECT CONSISTS OF AGGR | Johnson | 1 | Blackstone Construction, LLC | $296,469 | ARDOT | ||
| C03003 | THE PURPOSE OF THIS PROJECT IS TO OVERLAY APPROXIMATELY 1.62 MILES AND SURFACE APPROXIMATELY 0.23 MILE OF VARIOUS CITY STREETS IN THE CITY OF SALESVILLE IN BAXT | Baxter | 2 | Atlas Asphalt, Inc. | $295,829 | $324,101 | +10% | ARDOT |
| SA1148 | THE PURPOSE OF THIS PROJECT IS TO LEVEL AND RESEAL APPROXIMATELY 4.85 MILES OF COUNTY ROADS 96 AND 39 IN CLAY COUNTY. THIS PROJECT CONSISTS OF ASPHALT SURFACE T | Clay | 3 | Marion County Paving, LLC | $287,684 | $297,478 | +3.0% | ARDOT |
| C23008 | THE PURPOSE OF THIS PROJECT IS TO OVERLAY APPROXIMATELY 2.31 MILES OF VARIOUS CITY STREETS IN THE CITY OF MAYFLOWER IN FAULKNER COUNTY. THIS PROJECT CONSISTS OF | Faulkner | 2 | CK Asphalt, LLC | $287,180 | $332,657 | +16% | ARDOT |
| SA3349 | THE PURPOSE OF THIS PROJECT IS TO LEVEL AND RESEAL APPROXIMATELY 4.08 MILES OF COUNTY ROADS 36, 61, AND 72 IN IZARD COUNTY. THIS PROJECT CONSISTS OF ASPHALT SUR | Izard | 2 | Atlas Asphalt, Inc. | $285,804 | $296,404 | +4.0% | ARDOT |
| C68007 | THE PURPOSE OF THIS PROJECT IS TO OVERLAY APPROXIMATELY 1.39 MILES OF VARIOUS CITY STREETS IN THE CITY OF CALDWELL IN ST. FRANCIS COUNTY. THIS PROJECT CONSISTS | St. Francis | 2 | M & T Paving & Const. Co., Inc. | $258,604 | $284,341 | +10% | ARDOT |
| SA1939 | THE PURPOSE OF THIS PROJECT IS TO BASE AND SURFACE APPROXIMATELY 0.67 MILE OF COUNTY ROAD 47 IN CROSS COUNTY. THIS PROJECT CONSISTS OF AGGREGATE BASE COURSE, AC | Cross | 2 | M & T Paving & Const. Co., Inc. | $230,075 | $296,352 | +29% | ARDOT |
| 061736 | THE PURPOSE OF THIS PROJECT IS TO OVERLAY AND CONSTRUCT APPROXIMATELY 1875.24 FEET OF WALKING TRAIL IN PULASKI COUNTY. THIS PROJECT CONSISTS OF AGGREGATE BASE C | Pulaski | 2 | Creative Design Concepts, Inc. | $107,490 | $219,304 | +104% | ARDOT |
Gap is the second bid over the low bid. Where a contract shows fewer bids than ARDOT received, the others did not match their published totals and are left out.