Delta Asphalt of Ark., Inc.: ARDOT bid record
Delta Asphalt of Ark., Inc. submitted 95 bids on Arkansas DOT contracts in the data, from 12 JAN 2022 to 18 SEP 2024, and was the low bidder on 28 of them (29%). When it was not low, its total sat a median +21% above the low bid.
- Owner
- Arkansas DOT
- Low bid volume
- $222,894,106
- Latest bid
- 18 SEP 2024
- Data through
- 04 NOV 2026
By year
| Year | Bids | Low bids | Win rate |
|---|---|---|---|
| 2022 | 39 | 14 | 36% |
| 2023 | 38 | 9 | 24% |
| 2024 | 18 | 5 | 28% |
By county
| County | Bids | Low bids | Win rate |
|---|---|---|---|
| Mississippi | 16 | 8 | 50% |
| Greene | 11 | 9 | 82% |
| White | 8 | 0 | 0% |
| Clay | 7 | 4 | 57% |
| Craighead | 7 | 1 | 14% |
| Lawrence | 7 | 1 | 14% |
| Poinsett | 7 | 1 | 14% |
| Jackson | 6 | 1 | 17% |
| Cleburne | 4 | 1 | 25% |
| Randolph | 3 | 0 | 0% |
| Sharp | 3 | 0 | 0% |
| Monroe | 3 | 0 | 0% |
Pay items where it is most often lowest
| Pay item | Code | Unit | Lines bid | Lowest on the line | Its median price | All bidders' median |
|---|---|---|---|---|---|---|
| Signs | 604003 | SF | 75 | 39 (52%) | $7.00 | $8.40 |
| Construction pavement markings | 604041 | LF | 33 | 22 (67%) | $0.25 | $0.28 |
| Mineral aggregate in achm surface course (3/8") | 407161 | TON | 36 | 20 (56%) | $108.25 | $124.22 |
| Mineral aggregate in achm surface course (1/2") | 407162 | TON | 39 | 18 (46%) | $90.81 | $124.55 |
| Raised pavement markers (type II) | 721002 | EACH | 34 | 14 (41%) | $5.11 | $6.50 |
| Asphalt binder (PG 64-22) in achm surface course (1/2") (minimum bid $120.00) | 407432 | TON | 31 | 14 (45%) | $700.00 | $120.00 |
| Tack coat | 401011 | GAL | 44 | 12 (27%) | $4.31 | $3.75 |
| Thermoplastic pavement marking yellow (6") | 719102 | LF | 25 | 11 (44%) | $0.95 | $0.85 |
| Water | 620030 | MGAL | 17 | 11 (65%) | $10.00 | $10.00 |
| Asphalt binder (PG 64-22) in achm binder course (1") (minimum bid $120.00) | 406402 | TON | 19 | 10 (53%) | $120.00 | $126.00 |
| Centerline rumble stripes in asphalt roadways | 642102 | LF | 15 | 10 (67%) | $0.12 | $0.15 |
| Mailbox supports (single) | 637011 | EACH | 13 | 9 (69%) | $100.20 | $122.88 |
A line counts when the firm priced it and at least one other bidder did too; the lowest unit price on the line counts whoever won the contract. Token prices and bids over three times the low bid are left out.
Who it meets most
| Firm | Contracts in common | That firm ranked ahead |
|---|---|---|
| Atlas Asphalt, Inc. | 45 | 39 of 45 |
| Sugg Construction, Inc. | 30 | 28 of 30 |
| CK Asphalt, LLC | 17 | 13 of 17 |
| Rogers Group, Inc. | 16 | 13 of 16 |
| Michelle'S Excavating, Inc. | 14 | 11 of 14 |
| Crisp Contractors, Inc. | 4 | 2 of 4 |
| M & T Paving & Const. Co., Inc. | 3 | 1 of 3 |
| Marion County Paving, LLC | 1 | 1 of 1 |
| Redstone Const. Group, Inc. | 1 | 1 of 1 |
| Cranford Construction Co. | 1 | 1 of 1 |
Latest bids
| Let | Contract | County | Project | Rank | Its bid | Against the low bid |
|---|---|---|---|---|---|---|
| 18 SEP 2024 | 100633 | Greene | THE PURPOSE OF THIS PROJECT IS TO WIDEN APPROXIMATELY 2.375 MILES OF HIGHWAY 49 FROM TWO LANES TO FOUR LANES IN GREENE COUNTY. THIS PROJECT | 1 of 1 | $23,927,182 | Low |
| 26 JUN 2024 | 110826 | Monroe | THE PURPOSE OF THIS PROJECT IS TO IMPROVE APPROXIMATELY 0.093 MILE OF A Y-INTERSECTION ON HIGHWAYS 17 AND 70 IN MONROE COUNTY. THIS PROJECT | 2 of 2 | $727,304 | +19% |
| 26 JUN 2024 | SA3464 | Jackson | THE PURPOSE OF THIS PROJECT IS TO OVERLAY APPROXIMATELY 2.25 MILES OF COUNTY ROAD 630 IN JACKSON COUNTY. THIS PROJECT CONSISTS OF ACHM SURFA | 3 of 3 | $364,978 | +21% |
| 22 MAY 2024 | A00070 | Clay | THE PURPOSE OF THIS PROJECT IS TO LEVEL AND OVERLAY APPROXIMATELY 4.860 MILES OF HIGHWAY 1 IN CLAY COUNTY. THIS PROJECT CONSISTS OF REMOVAL | 1 of 1 | $2,267,097 | Low |
| 22 MAY 2024 | SA1258 | Cleburne | THE PURPOSE OF THIS PROJECT IS TO OVERLAY APPROXIMATELY 2.00 MILES OF COUNTY ROAD 61 IN CLEBURNE COUNTY. THIS PROJECT CONSISTS OF ACHM SURFA | 1 of 3 | $347,062 | Low, 1.0% under the second |
| 22 MAY 2024 | SA7399 | White | THE PURPOSE OF THIS PROJECT IS TO OVERLAY APPROXIMATELY 3.43 MILES OF COUNTY ROADS 75 & 383 IN WHITE COUNTY. THIS PROJECT CONSISTS OF AGGREG | 2 of 3 | $526,109 | +1.0% |
| 10 APR 2024 | A00063 | Mississippi | THE PURPOSE OF THIS PROJECT IS TO LEVEL AND OVERLAY APPROXIMATELY 5.777 MILES OF HIGHWAYS 77 AND 140 IN MISSISSIPPI COUNTY. THIS PROJECT CON | 2 of 2 | $2,456,271 | +10% |
| 10 APR 2024 | SA1149 | Clay | THE PURPOSE OF THIS PROJECT IS TO SURFACE APPROXIMATELY 2.11 MILES OF CO. RD. 53 IN CLAY COUNTY. THIS PROJECT CONSISTS OF SHAPING ROADWAY SE | 3 of 3 | $988,718 | +26% |
| 28 FEB 2024 | A10039 | Woodruff | THE PURPOSE OF THIS PROJECT IS TO PLACE AN ULTRATHIN BONDED WEARING COURSE ON APPROXIMATELY 3.025 MILES OF HIGHWAY 33 IN WOODRUFF COUNTY. TH | 3 of 4 | $1,114,773 | +25% |
| 28 FEB 2024 | A50026 | Fulton | THE PURPOSE OF THIS PROJECT IS TO LEVEL AND OVERLAY APPROXIMATELY 11.767 MILES OF HIGHWAY 63 IN FULTON COUNTY. THIS PROJECT CONSISTS OF REMO | 2 of 2 | $5,641,669 | +17% |
| 28 FEB 2024 | A50032 | White | THE PURPOSE OF THIS PROJECT IS TO APPLY AN ULTRATHIN BONDED WEARING COURSE ON APPROXIMATELY 7.831 MILES OF HIGHWAY 31 IN WHITE COUNTY. THIS | 3 of 3 | $1,732,114 | +40% |
| 28 FEB 2024 | A00058 | Craighead | THE PURPOSE OF THIS PROJECT IS TO LEVEL AND OVERLAY APPROXIMATELY 6.922 MILES OF HIGHWAY 139 IN CRAIGHEAD COUNTY. THIS PROJECT CONSISTS OF A | 2 of 2 | $2,281,941 | +19% |
| 28 FEB 2024 | A00061 | Craighead, Poinsett | THE PURPOSE OF THIS PROJECT IS TO LEVEL AND OVERLAY APPROXIMATELY 14.297 MILES OF HIGHWAY 49 IN CRAIGHEAD AND POINSETT COUNTIES. THIS PROJEC | 2 of 2 | $6,154,564 | +22% |
| 28 FEB 2024 | C28008 | Greene | THE PURPOSE OF THIS PROJECT IS TO OVERLAY APPROXIMATELY 4.23 MILES OF FAIRVIEW AND SHILOH ROADS IN THE CITY OF PARAGOULD IN GREENE COUNTY. T | 1 of 1 | $854,198 | Low |
| 17 JAN 2024 | A60044 | Prairie | THE PURPOSE OF THIS PROJECT IS TO MILL AND OVERLAY WITH AN ACHM SURFACE COURSE APPROXIMATELY 1.259 MILES AND LEVEL WITH AN ACHM SURFACE COUR | 3 of 3 | $3,432,433 | +3.0% |
| 17 JAN 2024 | A00062 | Greene | THE PURPOSE OF THIS PROJECT IS TO APPLY AN ULTRATHIN BONDED WEARING COURSE ON APPROXIMATLEY 4.856 MILES OF HIGHWAY 412 SOUTH OF PARAGOULD IN | 1 of 1 | $1,304,313 | Low |
| 17 JAN 2024 | SA3857 | Lawrence | THE PURPOSE OF THIS PROJECT IS TO OVERLAY APPROXIMATELY 2.06 MILES COUNTY ROADS 38 AND 85 IN LAWRENCE COUNTY. THIS PROJECT CONSISTS OF STONE | 4 of 4 | $602,025 | +23% |
| 17 JAN 2024 | SA5647 | Poinsett | THE PURPOSE OF THIS PROJECT IS TO OVERLAY AND SURFACE APPROXIMATELY 4.30 MILES OF VARIOUS COUNTY ROADS IN POINSETT COUNTY. THIS PROJECT CONS | 4 of 4 | $944,387 | +23% |
| 01 NOV 2023 | A50019 | White | THE PURPOSE OF THIS PROJECT IS TO OVERLAY APPROXIMATELY 11.753 MILES OF HIGHWAY 11, WITH 11.478 MILES HAVING SHOULDER WIDENING ON THE LEFT A | 3 of 3 | $2,950,933 | +5.0% |
| 01 NOV 2023 | A50030 | Sharp | THE PURPOSE OF THIS PROJECT IS TO LEVEL AND APPLY ULTRATHIN BONDED WEARING COURSE ON APPROXIMATELY 5.369 MILES OF HIGHWAY 63 IN SHARP COUNTY | 2 of 2 | $1,111,575 | +17% |
| 01 NOV 2023 | A00064 | Poinsett | THE PURPOSE OF THIS PROJECT IS TO LEVEL THE LANES AND SHOULDERS WITH AN ACHM SURFACE COURSE AND APPLY AN ULTRATHIN BONDED WEARING COURSE ON | 2 of 2 | $1,795,309 | +20% |
| 28 JUN 2023 | 101077 | Mississippi | THE PURPOSE OF THIS PROJECT IS TO RESURFACE APPROXIMATELY 7.647 MILES OF MAIN LANES ON INTERSTATE 55 IN MISSISSIPPI COUNTY. THIS PROJECT CON | 1 of 1 | $4,824,697 | Low |
| 28 JUN 2023 | A00046 | Greene | THE PURPOSE OF THIS PROJECT IS TO LEVEL AND OVERLAY THE MAIN LANES WITH ACHM SURFACE COURSE AND CONSTRUCT 2'-0" SHOULDERS ON APPROXIMATELY 5 | 2 of 2 | $2,229,797 | +1.0% |
| 17 MAY 2023 | 101165 | Poinsett | THE PURPOSE OF THIS PROJECT IS TO RETAIN, LEVEL, AND OVERLAY WITH ACHM SURFACE COURSE, WITH AGGREGATE BASE COURSE ON THE SIDE SLOPES, ON APP | 2 of 2 | $4,808,230 | +24% |
| 17 MAY 2023 | A00043 | Clay | THE PURPOSE OF THIS PROJECT IS TO OVERLAY WITH ACHM SURFACE COURSE APPROXIMATELY 1.229 MILES OF HIGHWAY 62 IN CLAY COUNTY. THIS PROJECT CONS | 1 of 1 | $730,990 | Low |
How this record was read
ARDOT monthly bid tab PDFs (morning and afternoon sessions), January 2022 to November 2026. Base bids are printed in whole dollars; on A+B and A+C jobs the base bid is kept, and the published rank follows the award amount.
- Every bid counted here matched its published total to within one dollar; ARDOT's rank decides who was low.
- The gap to the low bid is the firm's total over the low total, minus one, on contracts it did not win, leaving out bids over three times the low bid.
- A record covers the lettings in the data, not every contract the firm ever bid. Coverage by year is on the state page.
A name split in two, or a figure that does not match the owner's tabulation? Write to mehdi@miragemetrics.com and we correct it.
Your own bid history, read the same way
Mirage deploys AI agents for heavy civil estimating teams: quantities from the plan set, specs and addenda read, and bid tabs compared, inside your systems and your rules.