ARDOT letting results, January 17, 2024
68 contracts let by Arkansas DOT on January 17, 2024, $330,022,394 in low bids, a median of 2 bidders per contract.
- Owner
- Arkansas DOT
- Contracts
- 68
- Low bids, total
- $330,022,394
- Data through
- 04 NOV 2026
Contracts let that day
| Contract | Project | County | Bids | Low bidder | Low bid | Second bid | Gap | Source |
|---|---|---|---|---|---|---|---|---|
| 090069 | THE PURPOSE OF THIS PROJECT IS TO CONSTRUCT APPROXIMATELY 3.977 MILES OF A NEW FOUR LANE DIVIDED HIGHWAY WITH ELEVEN (11) NEW BRIDGES TO BE THE ACCESS FOR THE N | Benton | 3 | Crossland Construction Co., Inc. | $127,674,717 | $132,045,323 | +3.0% | ARDOT |
| 040826 | THE PURPOSE OF THIS PROJECT IS TO MILL AND OVERLAY APPROXIMATELY 7.184 MILES OF INTERSTATE 540 IN CRAWFORD AND SEBASTIAN COUNTIES. THIS PROJECT CONSISTS OF ACHM | Crawford, Sebastian | 1 | Emery Sapp & Sons, Inc. | $21,955,314 | ARDOT | ||
| A80031 | THE PURPOSE OF THIS PROJECT IS TO MILL AND OVERLAY WITH ACHM SURFACE COURSE APPROXIMATELY 33.954 MILES OF HIGHWAY 9 AND APPROXIMATELY 2.039 MILES OF HIGHWAY 64 | Conway, Perry | 2 | Blackstone Construction, LLC | $17,680,027 | $18,125,414 | +3.0% | ARDOT |
| A30025 | THE PURPOSE OF THIS PROJECT IS TO OVERLAY APPROXIMATELY 17.454 MILES OF HIGHWAY 355 IN HEMPSTEAD AND HOWARD COUNTIES. THIS PROJECT CONSISTS OF REMOVAL AND DISPO | Hempstead, Howard | 1 | Redstone Const. Group, Inc. | $15,890,515 | ARDOT | ||
| 061820 | THE PURPOSE OF THIS PROJECT IS TO MILL AND OVERLAY APPROXIMATELY 2.787 MILES OF I-30 AND I-630 IN PULASKI COUNTY. THIS PROJECT CONSISTS OF ACHM SURFACE COURSE, | Pulaski | 1 | Redstone Const. Group, Inc. | $14,696,211 | ARDOT | ||
| A20026 | THE PURPOSE OF THIS PROJECT IS TO MILL AND OVERLAY WITH ACHM SURFACE COURSE, WITH SELECT LOCATIONS OF LEVELING ON HIGHWAYS 8 AND 133, FOR APPROXIMATELY 2.280 MI | Ashley | 1 | Pine Bluff Sand & Gravel Co. | $10,235,884 | ARDOT | ||
| 030585 | THE PURPOSE OF THIS PROJECT IS TO DIAMOND GRIND AND JOINT SEAL ON APPROXIMATELY 9.566 MILES AND POLYMER OVERLAY TWO BRIDGES ON INTERSTATE 30 IN HEMPSTEAD AND MI | Hempstead, Miller | 3 | Interstate Improvement, Inc. | $10,184,008 | $14,952,645 | +47% | ARDOT |
| A70029 | THE PURPOSE OF THIS PROJECT IS TO LEVEL AND OVERLAY WITH ACHM SURFACE COURSE ON APPROXIMATELY 10.75 MILES OF HIGHWAY 82 IN UNION COUNTY. THIS PROJECT CONSISTS O | Union | 1 | Jet Asphalt & Rock Co., Inc. | $8,927,019 | ARDOT | ||
| 040781 | THE PURPOSE OF THIS PROJECT IS TO REPLACE ONE BRIDGE OVER PRAIRIE CREEK AND TO REPLACE ONE RC BOX CULVERT ON HIGHWAY 71 IN SEBASTIAN COUNTY. THIS PROJECT CONSIS | Sebastian | 2 | Mobley Contractors, Inc. | $8,364,108 | $8,490,188 | +2.0% | ARDOT |
| 090523 | THE PURPOSE OF THIS PROJECT IS TO REPLACE ONE STRUCTURE ON HIGHWAY 23 IN MADISON COUNTY. THIS PROJECT CONSISTS OF CLEARING AND GRUBBING, REMOVAL AND DISPOSAL IT | Madison | 2 | Crouse Construction Co. | $8,062,324 | $9,693,029 | +20% | ARDOT |
| AX0006 | THE PURPOSE OF THIS PROJECT IS TO MILL AND OVERLAY APPROXIMATELY 16.147 MILES OF HIGHWAY 45 IN MADISON AND WASHINGTON COUNTIES. THIS PROJECT CONSISTS OF AGGREGA | Madison, Washington | 2 | Emery Sapp & Sons, Inc. | $7,380,182 | $8,810,672 | +19% | ARDOT |
| 050423 | THE PURPOSE OF THIS PROJECT IS TO REPLACE ONE STRUCTURE ON HIGHWAY 56 IN IZARD COUNTY. THIS PROJECT CONSISTS OF CLEARING AND GRUBBING, REMOVAL AND DISPOSAL ITEM | Izard | 2 | West Plains BR. & Grading, LLC | $6,520,000 | $10,335,279 | +59% | ARDOT |
| A40036 | THE PURPOSE OF THIS PROJECT IS TO MILL AND OVERLAY APPROXIMATELY 6.901 MILES OF HIGHWAY 71 IN WASHINGTON COUNTY. THIS PROJECT CONSISTS OF REMOVAL AND DISPOSAL O | Washington | 2 | Apac-Central, Inc. | $6,281,338 | $6,959,041 | +11% | ARDOT |
| A80032 | THE PURPOSE OF THIS PROJECT IS TO APPLY ULTRATHIN BONDED WEARING COURSE ON APPROXIMATELY 7.552 MILES OF HIGHWAY 247, MILL AND OVERLAY APPROXIMATELY 0.437 MILE O | Pope | 1 | Blackstone Construction, LLC | $5,943,870 | ARDOT | ||
| A70031 | THE PURPOSE OF THIS PROJECT IS TO MILL AND OVERLAY WITH ACHM SURFACE COURSE APPROXIMATELY 0.716 MILES AND LEVEL AND OVERLAY WITH ACHM SURFACE COURSE APPROXIMATE | Union | 1 | Jet Asphalt & Rock Co., Inc. | $4,641,256 | ARDOT | ||
| A70030 | THE PURPOSE OF THIS PROJECT IS TO PLACE ULTRATHIN BONDED WEARING COURSE ON APPROXIMATELY 8.171 MILES OF HIGHWAY 82 IN UNION COUNTY. THIS PROJECT CONSISTS OF REM | Union | 1 | Jet Asphalt & Rock Co., Inc. | $4,623,988 | ARDOT | ||
| A30027 | THE PURPOSE OF THIS PROJECT IS TO MILL AND OVERLAY APPROXIMATELY 5.761 MILES OF HIGHWAY 278 IN HEMPSTEAD AND HOWARD COUNTIES. THIS PROJECT CONSISTS OF REMOVAL A | Hempstead, Howard | 1 | Cranford Construction Co. | $4,299,639 | ARDOT | ||
| A40029 | THE PURPOSE OF THIS PROJECT IS TO LEVEL UP AND OVERLAY APPROXIMATELY 7.34 MILES OF HIGHWAY 255 IN SEBASTIAN COUNTY. THIS PROJECT CONSISTS OF REMOVAL AND DISPOSA | Sebastian | 3 | Forsgren, Inc. | $4,185,515 | $4,530,048 | +8.0% | ARDOT |
| A60043 | THE PURPOSE OF THIS PROJECT IS TO MILL AND OVERLAY APPROXIMATELY 2.377 MILES AND LEVEL AND OVERLAY APPROXIMATELY 13.257 MILES OF HIGHWAY 38 IN LONOKE AND PRAIRI | Lonoke, Prairie | 1 | Rogers Group, Inc. | $4,184,866 | ARDOT | ||
| A60044 | THE PURPOSE OF THIS PROJECT IS TO MILL AND OVERLAY WITH AN ACHM SURFACE COURSE APPROXIMATELY 1.259 MILES AND LEVEL WITH AN ACHM SURFACE COURSE OVERLAY FOR APPRO | Prairie | 3 | Rogers Group, Inc. | $3,324,970 | $3,410,990 | +3.0% | ARDOT |
| A40028 | THE PURPOSE OF THIS PROJECT IS TO MILL AND OVERLAY APPROXIMATELY 3.800 MILES OF HIGHWAY 71B IN FORT SMITH IN SEBASTIAN COUNTY. THIS PROJECT CONSISTS OF ACHM SUR | Sebastian | 1 | Forsgren, Inc. | $2,629,505 | ARDOT | ||
| A40033 | THE PURPOSE OF THIS PROJECT IS TO LEVEL AND OVERLAY APPROXIMATELY 6.104 MILES OF HIGHWAY 59 IN WASHINGTON COUNTY. THIS PROJECT CONSISTS OF AGGREGATE BASE COURSE | Washington | 2 | Apac-Central, Inc. | $2,605,961 | $3,023,520 | +16% | ARDOT |
| A90029 | THE PURPOSE OF THIS PROJECT IS TO APPLY ULTRATHIN BONDED WEARING COURSE ON HIGHWAY 27 IN SEARCY COUNTY FOR APPROXIMATELY 23.346 MILES. THIS PROJECT CONSISTS OF | Searcy | 2 | Rogers Group, Inc. | $2,316,468 | $2,564,233 | +11% | ARDOT |
| A60036 | THE PURPOSE OF THIS PROJECT IS TO MILL AND OVERLAY APPROXIMATELY 4.956 MILES OF HIGHWAY 15 AND APPROXIMATELY 2.274 MILES OF HIGHWAY 89 IN LONOKE COUNTY. THIS PR | Lonoke | 1 | Rogers Group, Inc. | $2,092,350 | ARDOT | ||
| A80034 | THE PURPOSE OF THIS PROJECT IS TO MILL AND OVERLAY APPROXIMATELY 3.30 MILES OF HIGHWAY 22 IN LOGAN COUNTY. THIS PROJECT CONSISTS OF AGGREGATE SURFACE COURSE, AC | Logan | 2 | Blackstone Construction, LLC | $2,038,245 | $2,298,944 | +13% | ARDOT |
| 012469 | THE PURPOSE OF THIS PROJECT IS TO INSTALL RAISED PAVEMENT MARKERS ON VARIOUS ROUTES IN VARIOUS COUNTIES. THIS PROJECT CONSISTS OF MAINTENANCE OF TRAFFIC, PAVEME | Various | 2 | Delta Traffic Control LLC | $1,646,425 | $1,993,055 | +21% | ARDOT |
| A00062 | THE PURPOSE OF THIS PROJECT IS TO APPLY AN ULTRATHIN BONDED WEARING COURSE ON APPROXIMATLEY 4.856 MILES OF HIGHWAY 412 SOUTH OF PARAGOULD IN GREENE COUNTY. THIS | Greene | 1 | Delta Asphalt of Ark., Inc. | $1,304,313 | ARDOT | ||
| C43011 | THE PURPOSE OF THIS PROJECT IS TO OVERLAY AND SURFACE APPROXIMATELY 1.19 MILES OF VARIOUS CITY STREETS IN THE CITY OF CARLISLE, OVERLAY AND SURFACE APPROXIMATEL | Lonoke | 3 | Rogers Group, Inc. | $1,275,311 | $1,313,739 | +3.0% | ARDOT |
| C04027 | THE PURPOSE OF THIS PROJECT IS TO OVERLAY APPROXIMATELY 1.05 MILES OF VARIOUS CITY STREETS IN THE CITY OF DECATUR, APPROXIMATELY 2.15 MILES OF VARIOUS CITY STRE | Benton | 3 | Emery Sapp & Sons, Inc. | $1,254,859 | $1,272,944 | +1.0% | ARDOT |
| C76085 | THE PURPOSE OF THIS PROJECT IS TO OVERLAY APPROXIMATELY 2.00 MILES OF VARIOUS CITY STREETS IN THE CITY OF MARIANNA IN LEE COUNTY, APPROXIMATELY 0.82 MILES OF VA | Lee, Phillips | 3 | M & T Paving & Const. Co., Inc. | $1,161,937 | $1,261,638 | +9.0% | ARDOT |
| A50027 | THE PURPOSE OF THIS PROJECT IS TO PLACE ULTRATHIN BONDED WEARING COURSE ON APPROXIMATELY 2.987 MILES OF HIGHWAY 69 IN BATESVILLE IN INDEPENDENCE COUNTY. THIS PR | Independence | 1 | Atlas Asphalt, Inc. | $1,099,422 | ARDOT | ||
| A60046 | THE PURPOSE OF THIS PROJECT IS TO OVERLAY WITH ACHM SURFACE COURSE ON APPROXIMATELY 1.540 MILES OF HIGHWAY 7S IN HOT SPRINGS IN GARLAND COUNTY. THIS PROJECT CON | Garland | 1 | Cranford Construction Co. | $860,812 | ARDOT | ||
| SA5647 | THE PURPOSE OF THIS PROJECT IS TO OVERLAY AND SURFACE APPROXIMATELY 4.30 MILES OF VARIOUS COUNTY ROADS IN POINSETT COUNTY. THIS PROJECT CONSISTS OF RECONSTRUCTE | Poinsett | 4 | Atlas Asphalt, Inc. | $769,049 | $832,703 | +8.0% | ARDOT |
| A60041 | THE PURPOSE OF THIS PROJECT IS TO MILL AND OVERLAY WITH ACHM SURFACE COURSE (SELECT SECTIONS) ON APPROXIMATELY 0.861 MILE OF HIGHWAY 107 IN NORTH LITTLE ROCK IN | Pulaski | 2 | Redstone Const. Group, Inc. | $752,331 | $944,505 | +26% | ARDOT |
| C35007 | THE PURPOSE OF THIS PROJECT IS TO OVERLAY APPROXIMATELY 1.04 MILES OF VARIOUS CITY STREETS IN THE CITY OF ALTHEIMER AND OVERLAY APPROXIMATELY 0.81 MILE OF VARIO | Jefferson | 2 | Kesser International, Inc. | $639,113 | $686,188 | +7.0% | ARDOT |
| SA6550 | THE PURPOSE OF THIS PROJECT IS TO SCRUB SEAL AND MICROSURFACE APPROXIMATELY 6.91 MILES OF COUNTY ROAD 51 IN SEBASTIAN COUNTY. THIS PROJECT CONSISTS OF MICROSURF | Sebastian | 3 | Vance Brothers, Inc. | $585,941 | $706,411 | +21% | ARDOT |
| C61008 | THE PURPOSE OF THIS PROJECT IS TO OVERLAY APPROXIMATELY 3.05 MILES OF VARIOUS CITY STREETS IN THE CITY OF POCAHONTAS IN RANDOLPH COUNTY. THIS PROJECT CONSISTS O | Randolph | 3 | Atlas Asphalt, Inc. | $549,867 | $601,052 | +9.0% | ARDOT |
| C23010 | THE PURPOSE OF THIS PROJECT IS TO OVERLAY AND SURFACE APPROXIMATELY 1.24 MILES OF VARIOUS CITY STREETS IN THE CITY OF ENOLA AND OVERLAY APPROXIMATELY 1.14 MILES | Faulkner | 2 | Rogers Group, Inc. | $499,304 | $509,747 | +2.0% | ARDOT |
| SA4282 | THE PURPOSE OF THIS PROJECT IS TO RESEAL APPROXIMATELY 3.23 MILES OF COUNTY ROAD 84 AND APPROXIMATELY 2.00 MILES OF COUNTY ROAD 81 IN LOGAN COUNTY. THIS PROJECT | Logan | 1 | Salt Creek Paving & Const. Co., Inc. | $488,867 | ARDOT | ||
| SA3857 | THE PURPOSE OF THIS PROJECT IS TO OVERLAY APPROXIMATELY 2.06 MILES COUNTY ROADS 38 AND 85 IN LAWRENCE COUNTY. THIS PROJECT CONSISTS OF STONE BACKFILL, AGGREGATE | Lawrence | 4 | Michelle'S Excavating, Inc. | $488,163 | $498,152 | +2.0% | ARDOT |
| SA5032 | THE PURPOSE OF THIS PROJECT IS TO LEVEL AND RESEAL APPROXIMATELY 3.50 MILES OF COUNTY ROADS 51, 230, AND 29 IN NEVADA COUNTY. THIS PROJECT CONSISTS OF ASPHALT S | Nevada | 1 | Smackover Paving Co. | $486,479 | ARDOT | ||
| SA6144 | THE PURPOSE OF THIS PROJECT IS TO OVERLAY APPROXIMATELY 2.95 MILES OF COUNTY ROAD 4 IN RANDOLPH COUNTY. THIS PROJECT CONSISTS OF ACHM SURFACE COURSE, ACHM PATCH | Randolph | 3 | Atlas Asphalt, Inc. | $480,079 | $565,026 | +18% | ARDOT |
| SA3942 | THE PURPOSE OF THIS PROJECT IS TO RESEAL APPROXIMATELY 7.72 MILES OF COUNTY ROADS 5, 57 AND 50 IN LEE COUNTY. THIS PROJECT CONSISTS OF ASPHALT SURFACE TREATMENT | Lee | 1 | Salt Creek Paving & Const. Co., Inc. | $473,900 | ARDOT | ||
| SA0251 | THE PURPOSE OF THIS PROJECT IS TO SURFACE APPROXIMATELY 3.22 MILES OF COUNTY ROAD 25 IN ASHLEY COUNTY. THIS PROJECT CONSISTS OF RECONSTRUCTED BASE COURSE, ASPHA | Ashley | 1 | Smackover Paving Co. | $459,050 | ARDOT | ||
| SA2754 | THE PURPOSE OF THIS PROJECT IS TO LEVEL AND RESEAL APPROXIMATELY 4.70 MILES OF COUNTY ROAD 8 IN GRANT COUNTY. THIS PROJECT CONSISTS OF AGGREGATE BASE COURSE, PO | Grant | 1 | Salt Creek Paving & Const. Co., Inc. | $458,928 | ARDOT | ||
| SA0653 | THE PURPOSE OF THIS PROJECT IS TO RESEAL APPROXIMATELY 5.80 MILES OF COUNTY ROADS 25 AND 32 IN BRADLEY COUNTY. THIS PROJECT CONSISTS OF ASPHALT SURFACE TREATMEN | Bradley | 2 | Smackover Paving Co. | $451,655 | $487,783 | +8.0% | ARDOT |
| C04023 | THE PURPOSE OF THIS PROJECT IS TO SURFACE APPROXIMATELY 1.38 MILES OF VARIOUS CITY STREETS IN THE CITY OF CENTERTON IN BENTON COUNTY. THIS PROJECT CONSISTS OF A | Benton | 2 | Grant Garrett Excavating, Inc. | $424,270 | $427,899 | +1.0% | ARDOT |
| C35008 | THE PURPOSE OF THIS PROJECT IS TO OVERLAY APPROXIMATELY 0.62 MILE OF W. 28TH AVENUE AND 0.27 MILE OF W. HARDING AVENUE IN THE CITY OF PINE BLUFF IN JEFFERSON CO | Jefferson | 2 | Pine Bluff Sand & Gravel Co. | $418,880 | $420,986 | +1.0% | ARDOT |
| C41007 | THE PURPOSE OF THIS PROJECT IS TO OVERLAY APPROXIMATELY 1.05 MILES OF VARIOUS STREETS IN THE CITY OF ASHDOWN IN LITTLE RIVER COUNTY. THIS PROJECT CONSISTS OF BO | Little River | 1 | Tri State Asphalt, Inc. | $406,639 | ARDOT | ||
| C71005 | THE PURPOSE OF THIS PROJECT IS TO OVERLAY APPROXIMATELY 1.15 MILES OF SNEAD DRIVE IN THE CITY OF FAIRFIELD BAY IN VAN BUREN COUNTY. THIS PROJECT CONSISTS OF BOR | Van Buren | 2 | CK Asphalt, LLC | $377,712 | $462,537 | +22% | ARDOT |
| C31005 | THE PURPOSE OF THIS PROJECT IS TO OVERLAY APPROXIMATELY 1.26 MILES OF VARIOUS STREETS IN THE CITY OF MINERAL SPRINGS IN HOWARD COUNTY. THIS PROJECT CONSISTS OF | Howard | 1 | Tri State Asphalt, Inc. | $372,555 | ARDOT | ||
| C02010 | THE PURPOSE OF THIS PROJECT IS TO OVERLAY APPROXIMATELY 1.09 MILES OF VARIOUS CITY STREETS IN THE CITY OF WILMOT IN ASHLEY COUNTY. THIS PROJECT CONSISTS OF AGGR | Ashley | 1 | Pine Bluff Sand & Gravel Co. | $353,783 | ARDOT | ||
| C04025 | THE PURPOSE OF THIS PROJECT IS TO OVERLAY APPROXIMATELY 1.76 MILES OF OLD WIRE AND TUCKS CHAPEL ROADS IN THE CITY OF AVOCA IN BENTON COUNTY. THIS PROJECT CONSIS | Benton | 3 | Grant Garrett Excavating, Inc. | $350,301 | $377,733 | +8.0% | ARDOT |
| C54005 | THE PURPOSE OF THIS PROJECT IS TO OVERLAY APPROXIMATELY 1.17 MILES OF VARIOUS CITY STREETS IN THE CITY OF HELENA-WEST HELENA IN PHILLIPS COUNTY. THIS PROJECT CO | Phillips | 3 | Atlas Asphalt, Inc. | $338,102 | $349,606 | +3.0% | ARDOT |
| C58008 | THE PURPOSE OF THIS PROJECT IS TO OVERLAY APPROXIMATELY 0.84 MILE OF VARIOUS CITY STREETS IN THE CITY OF POTTSVILLE IN POPE COUNTY. THIS PROJECT CONSISTS OF AGG | Pope | 1 | Blackstone Construction, LLC | $335,075 | ARDOT | ||
| C52007 | THE PURPOSE OF THIS PROJECT IS TO OVERLAY APPROXIMATELY 1.25 MILES OF VARIOUS CITY STREETS IN THE CITY OF CHIDESTER IN OUACHITA COUNTY. THIS PROJECT CONSISTS OF | Ouachita | 1 | Smackover Paving Co. | $331,207 | ARDOT | ||
| C21009 | THE PURPOSE OF THIS PROJECT IS TO OVERLAY APPROXIMATELY 0.68 MILE OF VARIOUS STREETS IN THE CITY OF ARKANSAS CITY IN DESHA COUNTY. THIS PROJECT CONSISTS OF SCAR | Desha | 1 | Pine Bluff Sand & Gravel Co. | $320,293 | ARDOT | ||
| C75005 | THE PURPOSE OF THIS PROJECT IS TO OVERLAY APPROXIMATELY 0.87 MILE OF VARIOUS CITY STREETS IN THE CITY OF PLAINVIEW IN YELL COUNTY. THIS PROJECT CONSISTS OF REMO | Yell | 1 | Blackstone Construction, LLC | $319,892 | ARDOT | ||
| C10007 | THE PURPOSE OF THIS PROJECT IS TO OVERLAY APPROXIMATELY 0.97 MILE OF VARIOUS CITY STREETS IN THE CITY OF CADDO VALLEY IN CLARK COUNTY. THIS PROJECT CONSISTS OF | Clark | 1 | Salt Creek Paving & Const. Co., Inc. | $316,352 | ARDOT | ||
| C04026 | THE PURPOSE OF THIS PROJECT IS TO OVERLAY APPROXIMATELY 0.97 MILES OF VARIOUS CITY STREETS IN THE CITY OF BENTONVILLE IN BENTON COUNTY. THIS PROJECT CONSISTS OF | Benton | 2 | Grant Garrett Excavating, Inc. | $291,198 | $358,884 | +23% | ARDOT |
| C18018 | THE PURPOSE OF THIS PROJECT IS TO OVERLAY APPROXIMATELY 0.60 MILE OF VARIOUS CITY STREETS IN THE CITY OF CRAWFORDSVILLE IN CRITTENDEN COUNTY. THIS PROJECT CONSI | Crittenden | 3 | Crisp Contractors, Inc. | $290,969 | $312,135 | +7.0% | ARDOT |
| C24004 | THE PURPOSE OF THIS PROJECT IS TO OVERLAY APPROXIMATELY 0.22 MILE AND SURFACE APPROXIMATELY 0.65 MILE OF VARIOUS CITY STREETS IN THE CITY OF BRANCH IN FRANKLIN | Franklin | 2 | Emery Sapp & Sons, Inc. | $289,525 | $389,085 | +34% | ARDOT |
| SA3351 | THE PURPOSE OF THIS PROJECT IS TO LEVEL AND SEAL APPROXIMATELY 3.18 MILES OF COUNTY ROADS 13, 36, & 298 IN IZARD COUNTY. THIS PROJECT CONSISTS OF MINERAL AGGREG | Izard | 1 | Atlas Asphalt, Inc. | $281,303 | ARDOT | ||
| SA6647 | THE PURPOSE OF THIS PROJECT IS TO SURFACE APPROXIMATELY 1.99 MILES OF COUNTY ROAD 304 AND 2.60 MILES OF COUNTY ROAD 33 IN SEVIER COUNTY. THIS PROJECT CONSISTS O | Sevier | 1 | Smackover Paving Co. | $278,301 | ARDOT | ||
| SA3350 | THE PURPOSE OF THIS PROJECT IS TO OVERLAY APPROXIMATELY 1.05 MILES OF COUNTY ROAD 3 IN IZARD COUNTY. THIS PROJECT CONSISTS OF ACHM SURFACE COURSE, MAINTENANCE O | Izard | 1 | Atlas Asphalt, Inc. | $274,842 | ARDOT | ||
| C35009 | THE PURPOSE OF THIS PROJECT IS TO OVERLAY APPROXIMATELY 0.86 MILES OF VARIOUS CITY STREETS IN THE CITY OF WABBASEKA IN JEFFERSON COUNTY. THIS PROJECT CONSISTS O | Jefferson | 2 | Kesser International, Inc. | $271,436 | $341,843 | +26% | ARDOT |
| C08011 | THE PURPOSE OF THIS PROJECT IS TO OVERLAY APPROXIMATELY 0.70 MILE OF VARIOUS CITY STREETS IN THE CITY OF BERRYVILLE IN CARROLL COUNTY. THIS PROJECT CONSISTS OF | Carroll | 2 | Emery Sapp & Sons, Inc. | $245,340 | $254,689 | +4.0% | ARDOT |
| C71006 | THE PURPOSE OF THIS PROJECT IS TO OVERLAY APPROXIMATELY 1.38 MILES OF VARIOUS CITY STREETS IN THE CITY OF SHIRLEY IN VAN BUREN COUNTY. THIS PROJECT CONSISTS OF | Van Buren | 2 | Rogers Group, Inc. | $210,334 | $217,515 | +3.0% | ARDOT |
Gap is the second bid over the low bid. Where a contract shows fewer bids than ARDOT received, the others did not match their published totals and are left out.