Michelle'S Excavating, Inc.: ARDOT bid record
Michelle'S Excavating, Inc. submitted 39 bids on Arkansas DOT contracts in the data, from 12 JAN 2022 to 24 JUN 2026, and was the low bidder on 7 of them (18%). When it was not low, its total sat a median +9.0% above the low bid.
- Owner
- Arkansas DOT
- Low bid volume
- $3,478,734
- Latest bid
- 24 JUN 2026
- Data through
- 04 NOV 2026
By year
| Year | Bids | Low bids | Win rate |
|---|---|---|---|
| 2022 | 9 | 2 | 22% |
| 2023 | 6 | 3 | 50% |
| 2024 | 11 | 2 | 18% |
| 2025 | 7 | 0 | 0% |
| 2026 | 6 | 0 | 0% |
By county
| County | Bids | Low bids | Win rate |
|---|---|---|---|
| Randolph | 8 | 1 | 13% |
| Greene | 5 | 0 | 0% |
| Lawrence | 5 | 1 | 20% |
| Mississippi | 4 | 2 | 50% |
| Craighead | 3 | 2 | 67% |
| Jackson | 3 | 0 | 0% |
| Poinsett | 3 | 0 | 0% |
| Clay | 3 | 0 | 0% |
| Craighead, Mississippi | 1 | 1 | 100% |
| Jackson, Lawrence | 1 | 0 | 0% |
| White | 1 | 0 | 0% |
| Clay, Craighead, Greene | 1 | 0 | 0% |
Pay items where it is most often lowest
| Pay item | Code | Unit | Lines bid | Lowest on the line | Its median price | All bidders' median |
|---|---|---|---|---|---|---|
| Signs | 604003 | SF | 38 | 21 (55%) | $6.50 | $8.40 |
| Asphalt binder (PG 64-22) in achm surface course (3/8") (minimum bid $120.00) | 407431 | TON | 24 | 15 (63%) | $120.00 | $120.00 |
| Achm patching of existing roadway | 415011 | TON | 31 | 14 (45%) | $175.00 | $250.00 |
| Asphalt binder (PG 64-22) in achm surface course (1/2") (minimum bid $120.00) | 407432 | TON | 14 | 11 (79%) | $120.00 | $120.00 |
| Aggregate base course (class 7) | 303107 | TON | 19 | 10 (53%) | $40.00 | $51.00 |
| Reflectorized paint pavement marking yellow (4") | 718101 | LF | 19 | 8 (42%) | $0.18 | $0.21 |
| Asphalt binder (PG 64-22) in achm binder course (1") (minimum bid $120.00) | 406402 | TON | 7 | 5 (71%) | $120.00 | $126.00 |
| Aggregate base course (class 7) | 303117 | TON | 9 | 4 (44%) | $35.00 | $52.19 |
| Channel post sign support (type C) | 729003 | EACH | 5 | 4 (80%) | $80.00 | $89.00 |
| Selected material (class SM-4) | 302004 | CY | 5 | 4 (80%) | $25.00 | $53.30 |
| Standard sign | 726002 | SF | 6 | 3 (50%) | $23.00 | $25.38 |
| Water | 620030 | MGAL | 5 | 2 (40%) | $15.00 | $10.00 |
A line counts when the firm priced it and at least one other bidder did too; the lowest unit price on the line counts whoever won the contract. Token prices and bids over three times the low bid are left out.
Who it meets most
| Firm | Contracts in common | That firm ranked ahead |
|---|---|---|
| Sugg Construction, Inc. | 30 | 9 of 30 |
| Atlas Asphalt, Inc. | 26 | 21 of 26 |
| Delta Asphalt of Ark., Inc. | 14 | 3 of 14 |
| Delta Asphalt of Arkansas, Inc. | 10 | 3 of 10 |
| Richard Baughn Construction, Inc. | 5 | 1 of 5 |
| Rogers Group, Inc. | 4 | 4 of 4 |
| Robertson Contractors, Inc. | 4 | 3 of 4 |
| Seagraves Construction, Inc. | 3 | 2 of 3 |
| Mobley Contractors, Inc. | 3 | 0 of 3 |
| CK Asphalt, LLC | 2 | 1 of 2 |
Latest bids
| Let | Contract | County | Project | Rank | Its bid | Against the low bid |
|---|---|---|---|---|---|---|
| 24 JUN 2026 | BR2814 | Greene | THE PURPOSE OF THIS PROJECT IS TO REPLACE 1 BRIDGE AND RECONSTRUCT APPROXIMATELY 0.123 MILE OF COUNTY ROAD 49 IN GREENE COUNTY. THIS PROJECT | 4 of 7 | $1,660,143 | +18% |
| 08 APR 2026 | 101115 | Randolph | THE PURPOSE OF THIS PROJECT IS STREAM RESTORATION IN RANDOLPH COUNTY. THIS PROJECT CONSISTS OF CLEARING AND GRUBBING, EARTHWORK, AGGREGATE B | 3 of 4 | $1,629,797 | +99% |
| 04 MAR 2026 | 101100 | Greene | THE PURPOSE OF THIS PROJECT IS TO REPLACE A BRIDGE WITH A R.C BOX CULVERT ON HIGHWAY 34 IN GREENE COUNTY. THIS PROJECT CONSISTS OF CLEARING | 2 of 4 | $2,454,228 | +12% |
| 21 JAN 2026 | C47022 | Mississippi | THE PURPOSE OF THIS PROJECT IS TO OVERLAY APPROXIAMATELY 1.16 MILES OF VARIOUS CITY STREETS IN BLYTHEVILLE AND APPROXIMATELY 1.60 MILES OF V | 3 of 3 | $657,955 | +29% |
| 21 JAN 2026 | FA1108 | Clay | THE PURPOSE OF THIS PROJECT IS TO REPLACE 1 BRIDGE AND RECONSTRUCT APPROXIMATELY 1.01 MILES OF COUNTRY ROAD 53 IN CLAY COUNTY. THIS PROJECT | 3 of 7 | $3,174,197 | +7.0% |
| 21 JAN 2026 | SA6146 | Randolph | THE PURPOSE OF THIS PROJECT IS TO OVERLAY APPROXIMATELY 2.00 MILES OF CO. RDS. 2 AND 16 IN RANDOLPH COUNTY. THIS PROJECT CONSISTS OF AGGREGA | 4 of 5 | $331,477 | +32% |
| 13 AUG 2025 | SA2868 | Greene | THE PURPOSE OF THIS PROJECT IS TO SURFACE APPROXIMATELY 1.02 MILES OF COUNTY ROAD 133 IN GREENE COUNTY. THIS PROJECT CONSISTS OF AGGREGATE B | 3 of 3 | $231,303 | +17% |
| 26 FEB 2025 | SA6145 | Randolph | THE PURPOSE OF THIS PROJECT IS TO OVERLAY APPROXIMATELY 2.40 MILES OF COUNTY ROAD 275 IN RANDOLH COUNTY. THIS PROJECT CONSISTS OF AGGREGATE | 2 of 5 | $351,079 | +12% |
| 15 JAN 2025 | C34011 | Jackson | THE PURPOSE OF THIS PROJECT IS TO OVERLAY APPROXIMATELY 1.83 MILES OF VARIOUS CITY STREETS IN THE CITY OF CAMPBELL STATION IN JACKSON COUNTY | 4 of 6 | $284,483 | +12% |
| 15 JAN 2025 | C47021 | Mississippi | THE PURPOSE OF THIS PROJECT IS TO OVERLAY APPROXIMATELY 1.37 MILES OF VARIOUS CITY STREETS IN THE CITY OF WILSON IN MISSISSIPPI COUNTY. THIS | 2 of 5 | $264,866 | +1.0% |
| 15 JAN 2025 | C76084 | Clay, Craighead, Greene | THE PURPOSE OF THIS PROJECT IS TO OVERLAY APPROXIMATELY 3.09 MILES OF VARIOUS CITY STREETS IN THE CITY OF BROOKLAND IN CRAIGHEAD COUNTY, AND | 3 of 5 | $1,251,754 | +8.0% |
| 15 JAN 2025 | C76088 | Mississippi, Poinsett | THE PURPOSE OF THIS PROJECT IS TO OVERLAY APPROXIMATELY 1.11 MILES OF VARIOUS CITY STREETS IN THE CITY OF DYESS, OVERLAY AND SURFACE APPROXI | 3 of 6 | $1,208,961 | +8.0% |
| 15 JAN 2025 | SA3465 | Jackson | THE PURPOSE OF THIS PROJECT IS TO OVERLAY APPROXIMATELY 2.20 MILES OF COUNTY ROAD 7 IN JACKSON COUNTY. THIS PROJECT CONSISTS OF AGGREGATE BA | 3 of 7 | $374,726 | +23% |
| 22 MAY 2024 | SA7399 | White | THE PURPOSE OF THIS PROJECT IS TO OVERLAY APPROXIMATELY 3.43 MILES OF COUNTY ROADS 75 & 383 IN WHITE COUNTY. THIS PROJECT CONSISTS OF AGGREG | 3 of 3 | $584,486 | +12% |
| 10 APR 2024 | SA1149 | Clay | THE PURPOSE OF THIS PROJECT IS TO SURFACE APPROXIMATELY 2.11 MILES OF CO. RD. 53 IN CLAY COUNTY. THIS PROJECT CONSISTS OF SHAPING ROADWAY SE | 2 of 3 | $919,447 | +17% |
| 28 FEB 2024 | C38013 | Lawrence | THE PURPOSE OF THIS PROJECT IS TO OVERLAY AND SURFACE APPROXIMATELY 1.00 MILE OF VARIOUS CITY STREETS IN THE CITY OF SMITHVILLE IN LAWRENCE | 2 of 3 | $256,078 | +8.0% |
| 28 FEB 2024 | C38014 | Lawrence | THE PURPOSE OF THIS PROJECT IS TO OVERLAY APPROXIMATELY 0.70 MILES OF SMITHVILLE RD. IN THE CITY OF LYNN IN LAWRENCE COUNTY. THIS PROJECT CO | 2 of 3 | $252,627 | +5.0% |
| 28 FEB 2024 | C47020 | Mississippi | THE PURPOSE OF THIS PROJECT IS TO OVERLAY AND SURFACE APPROXIMATELY 0.92 MILE OF VARIOUS CITY STREETS IN THE CITY OF BIRDSONG IN MISSISSIPPI | 1 of 3 | $236,759 | Low, 8.0% under the second |
| 28 FEB 2024 | C56009 | Poinsett | THE PURPOSE OF THIS PROJECT IS TO OVERLAY APPROXIMATELY 1.33 MILES OF VARIOUS CITY STREETS IN THE CITY OF HARRISBURG IN POINSETT COUNTY. THI | 2 of 3 | $358,952 | +19% |
| 28 FEB 2024 | C76081 | Jackson, Lawrence | THE PURPOSE OF THIS PROJECT IS TO OVERLAY APPROXIMATELY 0.79 MILES OF VARIOUS CITY STREETS IN THE CITY OF ALICIA IN LAWRENCE COUNTY AND APPR | 2 of 3 | $421,458 | +9.0% |
| 17 JAN 2024 | C61008 | Randolph | THE PURPOSE OF THIS PROJECT IS TO OVERLAY APPROXIMATELY 3.05 MILES OF VARIOUS CITY STREETS IN THE CITY OF POCAHONTAS IN RANDOLPH COUNTY. THI | 3 of 3 | $621,553 | +13% |
| 17 JAN 2024 | SA3857 | Lawrence | THE PURPOSE OF THIS PROJECT IS TO OVERLAY APPROXIMATELY 2.06 MILES COUNTY ROADS 38 AND 85 IN LAWRENCE COUNTY. THIS PROJECT CONSISTS OF STONE | 1 of 4 | $488,163 | Low, 2.0% under the second |
| 17 JAN 2024 | SA5647 | Poinsett | THE PURPOSE OF THIS PROJECT IS TO OVERLAY AND SURFACE APPROXIMATELY 4.30 MILES OF VARIOUS COUNTY ROADS IN POINSETT COUNTY. THIS PROJECT CONS | 2 of 4 | $832,703 | +8.0% |
| 17 JAN 2024 | SA6144 | Randolph | THE PURPOSE OF THIS PROJECT IS TO OVERLAY APPROXIMATELY 2.95 MILES OF COUNTY ROAD 4 IN RANDOLPH COUNTY. THIS PROJECT CONSISTS OF ACHM SURFAC | 2 of 3 | $565,026 | +18% |
| 01 NOV 2023 | A00057 | Craighead | THE PURPOSE OF THIS PROJECT IS TO CONSTRUCT A THIN OVERLAY ON APPROXIMATELY 0.961 MILES OF HIGHWAY 226 IN CRAIGHEAD COUNTY. THIS PROJECT CON | 1 of 1 | $262,498 | Low |
How this record was read
ARDOT monthly bid tab PDFs (morning and afternoon sessions), January 2022 to November 2026. Base bids are printed in whole dollars; on A+B and A+C jobs the base bid is kept, and the published rank follows the award amount.
- Every bid counted here matched its published total to within one dollar; ARDOT's rank decides who was low.
- The gap to the low bid is the firm's total over the low total, minus one, on contracts it did not win, leaving out bids over three times the low bid.
- A record covers the lettings in the data, not every contract the firm ever bid. Coverage by year is on the state page.
A name split in two, or a figure that does not match the owner's tabulation? Write to mehdi@miragemetrics.com and we correct it.
Your own bid history, read the same way
Mirage deploys AI agents for heavy civil estimating teams: quantities from the plan set, specs and addenda read, and bid tabs compared, inside your systems and your rules.