ARDOT letting results, November 1, 2023
39 contracts let by Arkansas DOT on November 1, 2023, $526,088,627 in low bids, a median of 1 bidders per contract.
- Owner
- Arkansas DOT
- Contracts
- 39
- Low bids, total
- $526,088,627
- Data through
- 04 NOV 2026
Contracts let that day
| Contract | Project | County | Bids | Low bidder | Low bid | Second bid | Gap | Source |
|---|---|---|---|---|---|---|---|---|
| 012326 | THE PURPOSE OF THIS PROJECT IS TO CONSTRUCT APPROXIMATELY 6.919 MILES OF FOUR LANE ROADWAY WITH BRIDGE STRUCTURES ON HIGHWAY 612 IN WASHINGTON AND BENTON COUNTI | Benton, Washington | 3 | Emery Sapp & Sons, Inc. | $180,787,345 | $219,437,081 | +21% | ARDOT |
| 061642 | THE PURPOSE OF THIS PROJECT IS TO WIDEN AND IMPROVE APPROXIMATELY 3.730 MILES OF HIGHWAY 67, REPLACE TWO BRIDGE STRUCTURES IN LONOKE COUNTY. THIS PROJECT CONSIS | Lonoke | 2 | Weaver-Bailey Contrs., Inc. | $116,993,040 | $138,878,657 | +19% | ARDOT |
| 040861 | THE PURPOSE OF THIS PROJECT IS TO CONSTRUCT APPROXIMATELY 1.193 MILES OF THE GREENWOOD BYPASS ON HIGHWAY 10 IN SEBASTIAN COUNTY. THIS PROJECT CONSISTS OF CLEARI | Sebastian | 1 | Forsgren, Mobley Contr, & Manhattan RD & | $57,849,904 | ARDOT | ||
| 040883 | THE PURPOSE OF THIS PROJECT IS TO OVERLAY WITH ULTRATHIN BONDED WEARING COURSE ON APPROXIMATELY 18.840 MILES AND POLYMER OVERLAY 20 BRIDGES ON INTERSTATE 49 IN | Washington | 2 | Emery Sapp & Sons, Inc. | $37,360,895 | $39,515,923 | +6.0% | ARDOT |
| 061508 | THE PURPOSE OF THIS PROJECT IS TO WIDEN WITH BIKE LANES ON APPROXIMATELY 1.192 MILES OF HIGHWAY 5 IN SALINE COUNTY. THIS PROJECT CONSISTS OF CLEARING AND GRUBBI | Saline | 2 | Kiewit Infrastructure South Co. | $20,721,856 | $19,770,072 | -5.0% | ARDOT |
| 100993 | THE PURPOSE OF THIS PROJECT IS TO REPLACE THREE STRUCTURES ON HIGHWAY 166 IN RANDOLPH COUNTY. THIS PROJECT CONSISTS OF CLEARING AND GRUBBING, REMOVAL AND DISPOS | Randolph | 2 | Robertson Contractors, Inc. | $9,409,372 | $9,995,000 | +6.0% | ARDOT |
| A30021 | THE PURPOSE OF THIS PROJECT IS TO RETAIN AND OVERLAY WITH ACHM SURFACE COURSE APPROXIMATELY 2.088 MILES IN LITTLE RIVER COUNTY AND APPROXIMATELY 4.033 MILES IN | Little River, Sevier | 1 | R. K. Hall, LLC | $7,494,388 | ARDOT | ||
| BR6210 | THE PURPOSE OF THIS PROJECT IS TO REPLACE 2 BRIDGES AND CONSTRUCT THE APPROACHES ON APPROXIMATELY 0.38 MILE OF COUNTY ROAD 65 IN SALINE COUNTY. THIS PROJECT CON | Saline | 1 | Thomco, Inc. | $7,260,520 | ARDOT | ||
| A20021 | THE PURPOSE OF THIS PROJECT IS TO LEVEL AND OVERLAY APPROXIMATELY 17.350 MILES OF HIGHWAY 8 IN ASHLEY AND CHICOT COUNTIES. THIS PROJECT CONSISTS OF REMOVAL AND | Ashley, Chicot | 1 | Pine Bluff Sand & Gravel Co. | $7,211,871 | ARDOT | ||
| 040721 | THE PURPOSE OF THIS PROJECT IS TO NOTCH, WIDEN, AND OVERLAY APPROXIMATELY 0.142 MILES OF HIGHWAY 64 IN ALMA IN CRAWFORD COUNTY. THIS PROJECT CONSISTS OF CLEARIN | Crawford | 1 | Mobley Contractors, Inc. | $5,251,736 | ARDOT | ||
| 050171 | THE PURPOSE OF THIS PROJECT IS TO REPLACE TWO STRUCTURES ON HIGHWAYS 175 AND 175S IN CHEROKEE VILLAGE IN SHARP COUNTY. THIS PROJECT CONSISTS OF CLEARING AND GRU | Sharp | 2 | West Plains BR. & Grading, LLC | $5,149,000 | $5,689,999 | +11% | ARDOT |
| A10033 | THE PURPOSE OF THIS PROJECT IS TO LEVEL UP AND OVERLAY APPROXIMATELY 10.219 MILES OF HIGHWAY 79 IN LEE COUNTY. THIS PROJECT CONSISTS OF REMOVAL AND DISPOSAL OF | Lee | 2 | Atlas Asphalt, Inc. | $5,032,330 | $6,437,506 | +28% | ARDOT |
| 101013 | THE PURPOSE OF THIS PROJECT IS TO REPLACE ONE BRIDGE ON HIGHWAY 135 IN GREENE COUNTY. THIS PROJECT CONSISTS OF CLEARING AND GRUBBING, REMOVAL AND DISPOSAL OF IT | Greene | 2 | Robertson Contractors, Inc. | $4,795,047 | $5,028,000 | +5.0% | ARDOT |
| A10025 | THE PURPOSE OF THIS PROJECT IS TO MILL AND OVERLAY APPROXIMATELY 4.149 MILES OF HIGHWAY 118 IN CRITTENDEN COUNTY. THIS PROJECT CONSISTS OF ACHM SURFACE COURSE, | Crittenden | 1 | Apac-Tennessee, Inc. | $4,647,616 | ARDOT | ||
| A50018 | THE PURPOSE OF THIS PROJECT IS TO RETAIN AND OVERLAY WITH ACHM SURFACE COURSE APPROXIMATELY 0.430 MILES AND APPROXIMATELY 10.674 MILES WITH OVERLAY AND 2'-0" SH | Izard | 1 | Atlas Asphalt, Inc. | $4,159,761 | ARDOT | ||
| 090435 | THE PURPOSE OF THIS PROJECT IS TO REPLACE ONE STRUCTURE ON HIGHWAY 21 IN CARROLL COUNTY. THIS PROJECT CONSISTS OF CLEARING AND GRUBBING, REMOVAL AND DISPOSAL OF | Carroll | 2 | L. E. Davis Construction, Inc. | $3,884,663 | $4,704,222 | +21% | ARDOT |
| 080646 | THE PURPOSE OF THIS PROJECT IS TO LEVEL AND OVERLAY APPROXIMATELY 6.237 MILES HIGHWAY 8 IN MONTGOMERY COUNTY. THIS PROJECT CONSISTS OF REMOVAL AND DISPOSAL OF G | Montgomery | 1 | Blackstone Construction, LLC | $3,799,408 | ARDOT | ||
| A10035 | THE PURPOSE OF THIS PROJECT IS TO LEVEL AND OVERLAY WITH AN ACHM SURFACE COURSE ON APPROXIMATELY 5.370 MILES OF HIGHWAY 1 IN PHILLIPS COUNTY. THIS PROJECT CONSI | Phillips | 1 | Atlas Asphalt, Inc. | $3,456,092 | ARDOT | ||
| A70028 | THE PURPOSE OF THIS PROJECT IS TO LEVEL AND OVERLAY WITH ULTRATHIN BONDED WEARING COURSE ON APPROXIMATELY 5.985 MILES OF HIGHWAY 7 IN OUACHITA COUNTY. THIS PROJ | Ouachita | 1 | Jet Asphalt & Rock Co., Inc. | $3,303,766 | ARDOT | ||
| A30022 | THE PURPOSE OF THIS PROJECT IS TO RETAIN AND OVERLAY WITH ACHM SURFACE COURSE APPROXIMATELY 4.460 MILES OF HIGHWAY 71 IN SEVIER COUNTY. THIS PROJECT CONSISTS OF | Sevier | 2 | Blackstone Construction, LLC | $3,064,882 | $3,950,442 | +29% | ARDOT |
| 080616 | THE PURPOSE OF THIS PROJECT IS TO REPLACE FOUR STRUCTURES ON HIGHWAY 124 IN POPE COUNTY. THIS PROJECT CONSISTS OF CLEARING AND GRUBBING, REMOVAL AND DISPOSAL IT | Pope | 4 | Bowden Specialties, Inc. | $2,905,442 | $2,980,641 | +3.0% | ARDOT |
| A40032 | THE PURPOSE OF THIS PROJECT IS TO OVERLAY WITH ULTRATHIN BONDED WEARING COURSE ON APPROXIMATELY 7.829 MILES OF HIGHWAY 265 IN WASHINGTON COUNTY. THIS PROJECT CO | Washington | 1 | Emery Sapp & Sons, Inc. | $2,877,323 | ARDOT | ||
| A50019 | THE PURPOSE OF THIS PROJECT IS TO OVERLAY APPROXIMATELY 11.753 MILES OF HIGHWAY 11, WITH 11.478 MILES HAVING SHOULDER WIDENING ON THE LEFT AND RIGHT, IN WHITE C | White | 3 | CK Asphalt, LLC | $2,808,944 | $2,936,533 | +5.0% | ARDOT |
| A80022 | THE PURPOSE OF THIS PROJECT IS TO MILL AND OVERLAY WITH ACHM SURFACE COURSE ON APPROXIMATELY 1.511 MILES OF HIGHWAY 7 AND APPROXIMATELY 1.642 MILES OF HIGHWAY 2 | Yell | 1 | Blackstone Construction, LLC | $2,761,383 | ARDOT | ||
| A70024 | THE PURPOSE OF THIS PROJECT IS TO LEVEL AND OVERLAY WITH ULTRATHIN BONDED WEARING COURSE ON APPROXIMATELY 5.084 MILES, ON HIGHWAY 371 IN COLUMBIA COUNTY. THIS P | Columbia | 1 | Jet Asphalt & Rock Co., Inc. | $2,559,909 | ARDOT | ||
| BR4707 | THE PURPOSE OF THIS PROJECT IS TO REPLACE THE BRIDGE STRUCTURE ON COUNTY ROAD 197 WEST OF BLYTHEVILLE IN MISSISSIPPI COUNTY. THIS PROJECT CONSISTS OF GRADING, A | Mississippi | 1 | Robertson Contractors, Inc. | $2,275,168 | ARDOT | ||
| A40034 | THE PURPOSE OF THIS PROJECT IS TO LEVEL WITH ACHM SURFACE COURSE AND OVERLAY WITH AN ULTRATHIN BONDED WEARING COURSE APPROXIMATELY 8.272 MILES OF HIGHWAY 96 IN | Sebastian | 1 | Emery Sapp & Sons, Inc. | $2,236,151 | ARDOT | ||
| A20028 | THE PURPOSE OF THIS PROJECT IS TO MILL AND OVERLAY APPROXIMATELY 2.248 MILES OF HIGHWAY 256 IN JEFFERSON COUNTY. THIS PROJECT CONSISTS OF TRENCHING AND SHOULDER | Jefferson | 1 | Cranford Construction Co. | $1,946,910 | ARDOT | ||
| A00060 | THE PURPOSE OF THIS PROJECT IS TO LEVEL AND OVERLAY WITH ULTRATHIN BONDED WEARING COURSE ON APPROXIMATELY 6.895 MILES OF HIGHWAY 351 IN CRAIGHEAD COUNTY. THIS P | Craighead | 1 | Atlas Asphalt, Inc. | $1,831,115 | ARDOT | ||
| 070571 | THE PURPOSE OF THIS PROJECT IS TO REPLACE RC BOX CULVERTS ON HIGHWAY 7 IN CLARK COUNTY. THIS PROJECT CONSISTS OF CLEARING AND GRUBBING, REMOVAL AND DISPOSAL OF | Clark | 2 | Thomco, Inc. | $1,689,662 | $1,979,278 | +17% | ARDOT |
| 050478 | THE PURPOSE OF THIS PROJECT IS TO WIDEN APPROXIMATELY 845.57 FT OF HIGHWAY 167 IN INDEPENDENCE COUNTY. THIS PROJECT CONSISTS OF CLEARING AND GRUBBING, REMOVAL A | Independence | 1 | White River Materials, Inc. | $1,583,546 | ARDOT | ||
| A00064 | THE PURPOSE OF THIS PROJECT IS TO LEVEL THE LANES AND SHOULDERS WITH AN ACHM SURFACE COURSE AND APPLY AN ULTRATHIN BONDED WEARING COURSE ON APPROXIMATELY 6.048 | Poinsett | 2 | Atlas Asphalt, Inc. | $1,502,345 | $1,795,309 | +20% | ARDOT |
| 101053 | THE PURPOSE OF THIS PROJECT IS TO REPLACE ONE BRIDGE WITH A R.C. BOX CULVERT ON HIGHWAY 90 IN RANDOLPH COUNTY. THIS PROJECT CONSISTS OF CLEARING AND GRUBBING, E | Randolph | 3 | Seagraves Construction, Inc. | $1,470,278 | $1,523,999 | +4.0% | ARDOT |
| A30030 | THE PURPOSE OF THIS PROJECT IS TO MILL AND OVERLAY APPROXIMATELY 2.01 MILES OF HIGHWAY 67 IN MILLER COUNTY AND 0.04 MILES OF HIGHWAY 67 IN HEMPSTEAD COUNTY. THI | Hempstead, Miller | 2 | Redstone Const. Group, Inc. | $1,468,311 | $1,909,366 | +30% | ARDOT |
| BR1113 | THE PURPOSE OF THIS PROJECT IS TO REPLACE THE EXISTING 60 FT. TIMBER DECK BRIDGE WITH A QUAD 11' X 11' R.C. BOX CULVERT ON 0.218 MILE OF COUNTY ROAD 76 IN CLAY | Clay | 2 | Seagraves Construction, Inc. | $1,200,274 | $1,204,999 | 0.0% | ARDOT |
| 012471 | THE PURPOSE OF THIS PROJECT IS TO INSTALL RAISED PAVEMENT MARKERS ON VARIOUS ROUTES IN VARIOUS COUNTIES. THIS PROJECT CONSISTS OF MAINTENANCE OF TRAFFIC, PAVEME | Various | 3 | Time Striping, Inc. | $1,093,933 | $1,839,973 | +68% | ARDOT |
| A10032 | THE PURPOSE OF THIS PROJECT IS TO MILL AND OVERLAY APPROXIMATELY 2.470 MILES OF HIGHWAY 79 IN LEE COUNTY. THIS PROJECT CONSISTS OF ACHM SURFACE COURSE, COLD MIL | Lee | 1 | Atlas Asphalt, Inc. | $1,031,153 | ARDOT | ||
| A50030 | THE PURPOSE OF THIS PROJECT IS TO LEVEL AND APPLY ULTRATHIN BONDED WEARING COURSE ON APPROXIMATELY 5.369 MILES OF HIGHWAY 63 IN SHARP COUNTY. THIS PROJECT CONSI | Sharp | 2 | Atlas Asphalt, Inc. | $950,790 | $1,111,575 | +17% | ARDOT |
| A00057 | THE PURPOSE OF THIS PROJECT IS TO CONSTRUCT A THIN OVERLAY ON APPROXIMATELY 0.961 MILES OF HIGHWAY 226 IN CRAIGHEAD COUNTY. THIS PROJECT CONSISTS OF REMOVAL AND | Craighead | 1 | Michelle'S Excavating, Inc. | $262,498 | ARDOT |
Gap is the second bid over the low bid. Where a contract shows fewer bids than ARDOT received, the others did not match their published totals and are left out.