Robertson Contractors, Inc.: ARDOT bid record

Robertson Contractors, Inc. submitted 57 bids on Arkansas DOT contracts in the data, from 12 JAN 2022 to 04 NOV 2026, and was the low bidder on 23 of them (40%). When it was not low, its total sat a median +19% above the low bid.

Owner
Arkansas DOT
Low bid volume
$148,172,947
Latest bid
04 NOV 2026
Data through
04 NOV 2026
57Bids
23Low bids
40Win rate, percent
+19%Median gap to the low bid when not low, 34 bids

By year

YearBidsLow bidsWin rate
202212542%
202311764%
202410550%
20259222%
202615427%
Robertson Contractors, Inc., ARDOT: bids and low bids by year of letting

By county

CountyBidsLow bidsWin rate
Mississippi6467%
Greene5480%
Craighead5360%
Randolph4250%
Cross400%
Madison3133%
Poinsett3267%
White200%
Fulton200%
Lonoke2150%
Benton2150%
Clay2150%
Robertson Contractors, Inc., ARDOT: bids and low bids by county

Pay items where it is most often lowest

Pay itemCodeUnitLines bidLowest on the lineIts median priceAll bidders' median
Water620030MGAL5352 (98%)$10.00$10.00
Mulch cover620022ACRE5147 (92%)$1,000.00$1,150.00
Lime620001TON5246 (88%)$100.00$105.00
Seeding620011ACRE5145 (88%)$1,350.00$1,500.00
Silt fence621021LF5144 (86%)$3.38$3.68
Temporary seeding621001ACRE4843 (90%)$750.00$805.89
Second seeding application623001ACRE4842 (88%)$350.00$395.00
Asphalt binder (PG 64-22) in achm surface course (1/2") (minimum bid $120.00)407432TON4742 (89%)$120.00$120.00
Signs604003SF5239 (75%)$8.00$8.40
Barricades604013LF4838 (79%)$20.00$25.00
Solid sodding624001SY4537 (82%)$9.68$8.25
Sand bag ditch checks621031BAG4237 (88%)$9.75$10.89
Robertson Contractors, Inc., ARDOT: pay items where its unit price was the lowest on the line

A line counts when the firm priced it and at least one other bidder did too; the lowest unit price on the line counts whoever won the contract. Token prices and bids over three times the low bid are left out.

Who it meets most

FirmContracts in commonThat firm ranked ahead
Mobley Contractors, Inc.3311 of 33
West Plains BR. & Grading, LLC169 of 16
Seagraves Construction, Inc.105 of 10
Capital Paving & Construction, LLC84 of 8
White River Materials, Inc.84 of 8
Manhattan Road & Bridge Co.52 of 5
Thomco, Inc.54 of 5
R. L. Persons Const., Inc.53 of 5
Kesser International, Inc.51 of 5
Central Arkansas Contractors, Inc.41 of 4
Robertson Contractors, Inc., ARDOT: the firms on the same contracts most often

Latest bids

LetContractCountyProjectRankIts bidAgainst the low bid
04 NOV 2026050439IndependenceTHE PURPOSE OF THIS PROJECT IS TO REPLACE ONE BRIDGE ON HIGHWAY 25 IN INDEPENDENCE COUNTY. THIS PROJECT CONSISTS OF CLEARING AND GRUBBING, R4 of 5$5,414,111+30%
04 NOV 2026BR4401MadisonTHE PURPOSE OF THIS PROJECT IS TO REPLACE THE BRIDGE STRUCTURE ON 0.452 MILE OF COUNTY ROAD 7 SOUTH OF HUNTSVILLE IN MADISON COUNTY. THIS PR4 of 5$5,714,396+26%
04 NOV 2026FA0314BaxterTHE PURPOSE OF THIS PROJECT IS TO RECONSTRUCT APPROXIMATELY 1.525 MILES OF COUNTY ROAD 73 IN BAXTER COUNTY. THIS PROJECT CONSISTS OF CLEARIN1 of 3$3,589,435Low, 16% under the second
23 SEP 2026110716PhillipsTHE PURPOSE OF THIS PROJECT IS TO REPLACE THREE STRUCTURES ON HIGHWAYS 185 AND 318 IN PHILLIPS COUNTY. THIS PROJECT CONSISITS OF CLEARING AN2 of 8$3,533,216+18%
23 SEP 2026070458ColumbiaTHE PURPOSE OF THIS PROJECT IS TO CONSTRUCT ONE FOUR LANE MEDIAN STRUCTURE ON HIGHWAY 82 IN COLUMBIA COUNTY. THIS PROJECT CONSISTS OF CLEARI3 of 7$29,331,953+9.0%
23 SEP 2026CB0401BentonTHE PURPOSE OF THIS PROJECT IS TO CONSTRUCT A QUINT. 12' X 8' R.C. BOX CULVERT AND APPROACHES ON 0.138 MILE OF BREDEHOEFT ROAD IN THE CITY O4 of 6$1,370,831+25%
24 JUN 2026BR2814GreeneTHE PURPOSE OF THIS PROJECT IS TO REPLACE 1 BRIDGE AND RECONSTRUCT APPROXIMATELY 0.123 MILE OF COUNTY ROAD 49 IN GREENE COUNTY. THIS PROJECT1 of 7$1,405,475Low, 2.0% under the second
08 APR 2026110751LeeTHE PURPOSE OF THIS PROJECT IS TO REPLACE ONE STRUCTURE ON HIGHWAY 121 IN LEE COUNTY. THIS PROJECT CONSISTS OF CLEARING AND GRUBBING, REMOVA8 of 8$2,104,660+52%
08 APR 2026110831CrossTHE PURPOSE OF THIS PROJECT IS TO REPAIR A SLIDE ON HIGHWAY 42 IN CROSS COUNTY. THIS PROJECT CONSISITS OF CLEARING AND GRUBBING, REMOVAL AND6 of 7$6,108,398+31%
08 APR 2026110832CrossTHE PURPOSE OF THIS PROJECT IS TO REPAIR A SLIDE ON HIGHWAY 75 IN CROSS COUNTY. THIS PROJECT CONSISITS OF CLEARING AND GRUBBING, EARTHWORK, 7 of 8$3,534,554+39%
08 APR 2026101115RandolphTHE PURPOSE OF THIS PROJECT IS STREAM RESTORATION IN RANDOLPH COUNTY. THIS PROJECT CONSISTS OF CLEARING AND GRUBBING, EARTHWORK, AGGREGATE B4 of 4$2,142,157+161%
04 MAR 2026020738ArkansasTHE PURPOSE OF THIS PROJECT IS TO REPLACE A STRUCTURE ON COUNTY ROAD BENZAL LANE IN ARKANSAS COUNTY. THIS PROJECT CONSISTS OF CLEARING AND G2 of 4$3,290,312+8.0%
04 MAR 2026101003RandolphTHE PURPOSE OF THIS PROJECT IS TO REPLACE ONE STRUCTURE ON HIGHWAY 90 IN RANDOLPH COUNTY. THIS PROJECT CONSISTS OF CLEARING AND GRUBBING, RE1 of 5$3,436,888Low, 1.0% under the second
04 MAR 2026101100GreeneTHE PURPOSE OF THIS PROJECT IS TO REPLACE A BRIDGE WITH A R.C BOX CULVERT ON HIGHWAY 34 IN GREENE COUNTY. THIS PROJECT CONSISTS OF CLEARING 1 of 4$2,192,762Low, 12% under the second
21 JAN 2026FA1108ClayTHE PURPOSE OF THIS PROJECT IS TO REPLACE 1 BRIDGE AND RECONSTRUCT APPROXIMATELY 1.01 MILES OF COUNTRY ROAD 53 IN CLAY COUNTY. THIS PROJECT 2 of 7$3,067,778+3.0%
05 NOV 2025090672SearcyTHE PURPOSE OF THIS PROJECT IS TO REALIGN HWY. 66 IN SEARCY COUNTY. THIS PROJECT CONSISTS OF CLEARING AND GRUBBING, REMOVAL AND DISPOSAL ITE6 of 6$10,909,770+70%
05 NOV 2025101091CraigheadTHE PURPOSE OF THIS PROJECT IS TO REPLACE ONE STRUCTURE ON HIGHWAY 18 IN CRAIGHEAD COUNTY. THIS PROJECT CONSISTS OF CLEARING AND GRUBBING, R2 of 3$1,198,827+12%
17 SEP 2025070509ClarkTHE PURPOSE OF THIS PROJECT IS TO REPLACE ONE STRUCTURE ON HIGHWAY 67 IN CLARK COUNTY. THIS PROJECT CONSISTS OF CLEARING AND GRUBBING, REMOV1 of 6$19,194,938Low, 4.0% under the second
17 SEP 2025090647BaxterTHE PURPOSE OF THIS PROJECT IS TO REPLACE ONE STRUCTURE ON HIGHWAY 5 IN BAXTER COUNTY. THIS PROJECT CONSISTS OF REMOVAL AND DISPOSAL ITEMS, 2 of 6$2,742,159+16%
17 SEP 2025101132PoinsettTHE PURPOSE OF THIS PROJECT IS TO REPLACE ONE STRUCTURE ON HIGHWAY 69 IN POINSETT COUNTY. THIS PROJECT CONSISITS OF CLEARING AND GRUBBING, R2 of 3$1,377,030+10%
25 JUN 2025061745LonokeTHE PURPOSE OF THIS PROJECT IS TO REPLACE ONE STRUCTURE ON HIGHWAY 13 IN LONOKE COUNTY. THIS PROJECT CONSISTS OF CLEARING AND GRUBBING, REMO2 of 3$4,096,983+3.0%
21 MAY 2025110861CrossTHE PURPOSE OF THIS PROJECT IS TO REPLACE ONE STRUCTURE ON HIGHWAY 42 IN CROSS COUNTY. THIS PROJECT CONSISTS OF CLEARING AND GRUBBING, REMOV2 of 3$5,951,252+7.0%
21 MAY 2025040866WashingtonTHE PURPOSE OF THIS PROJECT IS TO REPLACE THREE STRUCTURES ON HIGHWAY 45 IN WASHINGTON COUNTY. THIS PROJECT CONSISTS OF CLEARING AND GRUBBIN3 of 6$9,731,524+2.0%
15 JAN 2025100995CraigheadTHE PURPOSE OF THIS PROJECT IS TO REPLACE TWO STRUCTURES ON HIGHWAY 91 IN CRAIGHEAD COUNTY. THIS PROJECT CONSISTS OF CLEARING AND GRUBBING, 1 of 3$5,368,898Low, 26% under the second
06 NOV 2024110717St. FrancisTHE PURPOSE OF THIS PROJECT IS TO REPLACE ONE BRIDGE, REPLACE ONE BRIDGE WITH RC BOX CULVERT, AND MILL AND POLYMER OVERLAY ONE BRIDGE ON HIG3 of 4$7,986,725+19%
Robertson Contractors, Inc.: latest ARDOT bids in the data

How this record was read

ARDOT monthly bid tab PDFs (morning and afternoon sessions), January 2022 to November 2026. Base bids are printed in whole dollars; on A+B and A+C jobs the base bid is kept, and the published rank follows the award amount.

  • Every bid counted here matched its published total to within one dollar; ARDOT's rank decides who was low.
  • The gap to the low bid is the firm's total over the low total, minus one, on contracts it did not win, leaving out bids over three times the low bid.
  • A record covers the lettings in the data, not every contract the firm ever bid. Coverage by year is on the state page.

A name split in two, or a figure that does not match the owner's tabulation? Write to mehdi@miragemetrics.com and we correct it.

Your own bid history, read the same way

Mirage deploys AI agents for heavy civil estimating teams: quantities from the plan set, specs and addenda read, and bid tabs compared, inside your systems and your rules.

We use your email to reply to you and, now and then, to tell you about Mirage. You can opt out at any time. Privacy policy