Robertson Contractors, Inc.: ARDOT bid record
Robertson Contractors, Inc. submitted 57 bids on Arkansas DOT contracts in the data, from 12 JAN 2022 to 04 NOV 2026, and was the low bidder on 23 of them (40%). When it was not low, its total sat a median +19% above the low bid.
- Owner
- Arkansas DOT
- Low bid volume
- $148,172,947
- Latest bid
- 04 NOV 2026
- Data through
- 04 NOV 2026
By year
| Year | Bids | Low bids | Win rate |
|---|---|---|---|
| 2022 | 12 | 5 | 42% |
| 2023 | 11 | 7 | 64% |
| 2024 | 10 | 5 | 50% |
| 2025 | 9 | 2 | 22% |
| 2026 | 15 | 4 | 27% |
By county
| County | Bids | Low bids | Win rate |
|---|---|---|---|
| Mississippi | 6 | 4 | 67% |
| Greene | 5 | 4 | 80% |
| Craighead | 5 | 3 | 60% |
| Randolph | 4 | 2 | 50% |
| Cross | 4 | 0 | 0% |
| Madison | 3 | 1 | 33% |
| Poinsett | 3 | 2 | 67% |
| White | 2 | 0 | 0% |
| Fulton | 2 | 0 | 0% |
| Lonoke | 2 | 1 | 50% |
| Benton | 2 | 1 | 50% |
| Clay | 2 | 1 | 50% |
Pay items where it is most often lowest
| Pay item | Code | Unit | Lines bid | Lowest on the line | Its median price | All bidders' median |
|---|---|---|---|---|---|---|
| Water | 620030 | MGAL | 53 | 52 (98%) | $10.00 | $10.00 |
| Mulch cover | 620022 | ACRE | 51 | 47 (92%) | $1,000.00 | $1,150.00 |
| Lime | 620001 | TON | 52 | 46 (88%) | $100.00 | $105.00 |
| Seeding | 620011 | ACRE | 51 | 45 (88%) | $1,350.00 | $1,500.00 |
| Silt fence | 621021 | LF | 51 | 44 (86%) | $3.38 | $3.68 |
| Temporary seeding | 621001 | ACRE | 48 | 43 (90%) | $750.00 | $805.89 |
| Second seeding application | 623001 | ACRE | 48 | 42 (88%) | $350.00 | $395.00 |
| Asphalt binder (PG 64-22) in achm surface course (1/2") (minimum bid $120.00) | 407432 | TON | 47 | 42 (89%) | $120.00 | $120.00 |
| Signs | 604003 | SF | 52 | 39 (75%) | $8.00 | $8.40 |
| Barricades | 604013 | LF | 48 | 38 (79%) | $20.00 | $25.00 |
| Solid sodding | 624001 | SY | 45 | 37 (82%) | $9.68 | $8.25 |
| Sand bag ditch checks | 621031 | BAG | 42 | 37 (88%) | $9.75 | $10.89 |
A line counts when the firm priced it and at least one other bidder did too; the lowest unit price on the line counts whoever won the contract. Token prices and bids over three times the low bid are left out.
Who it meets most
| Firm | Contracts in common | That firm ranked ahead |
|---|---|---|
| Mobley Contractors, Inc. | 33 | 11 of 33 |
| West Plains BR. & Grading, LLC | 16 | 9 of 16 |
| Seagraves Construction, Inc. | 10 | 5 of 10 |
| Capital Paving & Construction, LLC | 8 | 4 of 8 |
| White River Materials, Inc. | 8 | 4 of 8 |
| Manhattan Road & Bridge Co. | 5 | 2 of 5 |
| Thomco, Inc. | 5 | 4 of 5 |
| R. L. Persons Const., Inc. | 5 | 3 of 5 |
| Kesser International, Inc. | 5 | 1 of 5 |
| Central Arkansas Contractors, Inc. | 4 | 1 of 4 |
Latest bids
| Let | Contract | County | Project | Rank | Its bid | Against the low bid |
|---|---|---|---|---|---|---|
| 04 NOV 2026 | 050439 | Independence | THE PURPOSE OF THIS PROJECT IS TO REPLACE ONE BRIDGE ON HIGHWAY 25 IN INDEPENDENCE COUNTY. THIS PROJECT CONSISTS OF CLEARING AND GRUBBING, R | 4 of 5 | $5,414,111 | +30% |
| 04 NOV 2026 | BR4401 | Madison | THE PURPOSE OF THIS PROJECT IS TO REPLACE THE BRIDGE STRUCTURE ON 0.452 MILE OF COUNTY ROAD 7 SOUTH OF HUNTSVILLE IN MADISON COUNTY. THIS PR | 4 of 5 | $5,714,396 | +26% |
| 04 NOV 2026 | FA0314 | Baxter | THE PURPOSE OF THIS PROJECT IS TO RECONSTRUCT APPROXIMATELY 1.525 MILES OF COUNTY ROAD 73 IN BAXTER COUNTY. THIS PROJECT CONSISTS OF CLEARIN | 1 of 3 | $3,589,435 | Low, 16% under the second |
| 23 SEP 2026 | 110716 | Phillips | THE PURPOSE OF THIS PROJECT IS TO REPLACE THREE STRUCTURES ON HIGHWAYS 185 AND 318 IN PHILLIPS COUNTY. THIS PROJECT CONSISITS OF CLEARING AN | 2 of 8 | $3,533,216 | +18% |
| 23 SEP 2026 | 070458 | Columbia | THE PURPOSE OF THIS PROJECT IS TO CONSTRUCT ONE FOUR LANE MEDIAN STRUCTURE ON HIGHWAY 82 IN COLUMBIA COUNTY. THIS PROJECT CONSISTS OF CLEARI | 3 of 7 | $29,331,953 | +9.0% |
| 23 SEP 2026 | CB0401 | Benton | THE PURPOSE OF THIS PROJECT IS TO CONSTRUCT A QUINT. 12' X 8' R.C. BOX CULVERT AND APPROACHES ON 0.138 MILE OF BREDEHOEFT ROAD IN THE CITY O | 4 of 6 | $1,370,831 | +25% |
| 24 JUN 2026 | BR2814 | Greene | THE PURPOSE OF THIS PROJECT IS TO REPLACE 1 BRIDGE AND RECONSTRUCT APPROXIMATELY 0.123 MILE OF COUNTY ROAD 49 IN GREENE COUNTY. THIS PROJECT | 1 of 7 | $1,405,475 | Low, 2.0% under the second |
| 08 APR 2026 | 110751 | Lee | THE PURPOSE OF THIS PROJECT IS TO REPLACE ONE STRUCTURE ON HIGHWAY 121 IN LEE COUNTY. THIS PROJECT CONSISTS OF CLEARING AND GRUBBING, REMOVA | 8 of 8 | $2,104,660 | +52% |
| 08 APR 2026 | 110831 | Cross | THE PURPOSE OF THIS PROJECT IS TO REPAIR A SLIDE ON HIGHWAY 42 IN CROSS COUNTY. THIS PROJECT CONSISITS OF CLEARING AND GRUBBING, REMOVAL AND | 6 of 7 | $6,108,398 | +31% |
| 08 APR 2026 | 110832 | Cross | THE PURPOSE OF THIS PROJECT IS TO REPAIR A SLIDE ON HIGHWAY 75 IN CROSS COUNTY. THIS PROJECT CONSISITS OF CLEARING AND GRUBBING, EARTHWORK, | 7 of 8 | $3,534,554 | +39% |
| 08 APR 2026 | 101115 | Randolph | THE PURPOSE OF THIS PROJECT IS STREAM RESTORATION IN RANDOLPH COUNTY. THIS PROJECT CONSISTS OF CLEARING AND GRUBBING, EARTHWORK, AGGREGATE B | 4 of 4 | $2,142,157 | +161% |
| 04 MAR 2026 | 020738 | Arkansas | THE PURPOSE OF THIS PROJECT IS TO REPLACE A STRUCTURE ON COUNTY ROAD BENZAL LANE IN ARKANSAS COUNTY. THIS PROJECT CONSISTS OF CLEARING AND G | 2 of 4 | $3,290,312 | +8.0% |
| 04 MAR 2026 | 101003 | Randolph | THE PURPOSE OF THIS PROJECT IS TO REPLACE ONE STRUCTURE ON HIGHWAY 90 IN RANDOLPH COUNTY. THIS PROJECT CONSISTS OF CLEARING AND GRUBBING, RE | 1 of 5 | $3,436,888 | Low, 1.0% under the second |
| 04 MAR 2026 | 101100 | Greene | THE PURPOSE OF THIS PROJECT IS TO REPLACE A BRIDGE WITH A R.C BOX CULVERT ON HIGHWAY 34 IN GREENE COUNTY. THIS PROJECT CONSISTS OF CLEARING | 1 of 4 | $2,192,762 | Low, 12% under the second |
| 21 JAN 2026 | FA1108 | Clay | THE PURPOSE OF THIS PROJECT IS TO REPLACE 1 BRIDGE AND RECONSTRUCT APPROXIMATELY 1.01 MILES OF COUNTRY ROAD 53 IN CLAY COUNTY. THIS PROJECT | 2 of 7 | $3,067,778 | +3.0% |
| 05 NOV 2025 | 090672 | Searcy | THE PURPOSE OF THIS PROJECT IS TO REALIGN HWY. 66 IN SEARCY COUNTY. THIS PROJECT CONSISTS OF CLEARING AND GRUBBING, REMOVAL AND DISPOSAL ITE | 6 of 6 | $10,909,770 | +70% |
| 05 NOV 2025 | 101091 | Craighead | THE PURPOSE OF THIS PROJECT IS TO REPLACE ONE STRUCTURE ON HIGHWAY 18 IN CRAIGHEAD COUNTY. THIS PROJECT CONSISTS OF CLEARING AND GRUBBING, R | 2 of 3 | $1,198,827 | +12% |
| 17 SEP 2025 | 070509 | Clark | THE PURPOSE OF THIS PROJECT IS TO REPLACE ONE STRUCTURE ON HIGHWAY 67 IN CLARK COUNTY. THIS PROJECT CONSISTS OF CLEARING AND GRUBBING, REMOV | 1 of 6 | $19,194,938 | Low, 4.0% under the second |
| 17 SEP 2025 | 090647 | Baxter | THE PURPOSE OF THIS PROJECT IS TO REPLACE ONE STRUCTURE ON HIGHWAY 5 IN BAXTER COUNTY. THIS PROJECT CONSISTS OF REMOVAL AND DISPOSAL ITEMS, | 2 of 6 | $2,742,159 | +16% |
| 17 SEP 2025 | 101132 | Poinsett | THE PURPOSE OF THIS PROJECT IS TO REPLACE ONE STRUCTURE ON HIGHWAY 69 IN POINSETT COUNTY. THIS PROJECT CONSISITS OF CLEARING AND GRUBBING, R | 2 of 3 | $1,377,030 | +10% |
| 25 JUN 2025 | 061745 | Lonoke | THE PURPOSE OF THIS PROJECT IS TO REPLACE ONE STRUCTURE ON HIGHWAY 13 IN LONOKE COUNTY. THIS PROJECT CONSISTS OF CLEARING AND GRUBBING, REMO | 2 of 3 | $4,096,983 | +3.0% |
| 21 MAY 2025 | 110861 | Cross | THE PURPOSE OF THIS PROJECT IS TO REPLACE ONE STRUCTURE ON HIGHWAY 42 IN CROSS COUNTY. THIS PROJECT CONSISTS OF CLEARING AND GRUBBING, REMOV | 2 of 3 | $5,951,252 | +7.0% |
| 21 MAY 2025 | 040866 | Washington | THE PURPOSE OF THIS PROJECT IS TO REPLACE THREE STRUCTURES ON HIGHWAY 45 IN WASHINGTON COUNTY. THIS PROJECT CONSISTS OF CLEARING AND GRUBBIN | 3 of 6 | $9,731,524 | +2.0% |
| 15 JAN 2025 | 100995 | Craighead | THE PURPOSE OF THIS PROJECT IS TO REPLACE TWO STRUCTURES ON HIGHWAY 91 IN CRAIGHEAD COUNTY. THIS PROJECT CONSISTS OF CLEARING AND GRUBBING, | 1 of 3 | $5,368,898 | Low, 26% under the second |
| 06 NOV 2024 | 110717 | St. Francis | THE PURPOSE OF THIS PROJECT IS TO REPLACE ONE BRIDGE, REPLACE ONE BRIDGE WITH RC BOX CULVERT, AND MILL AND POLYMER OVERLAY ONE BRIDGE ON HIG | 3 of 4 | $7,986,725 | +19% |
How this record was read
ARDOT monthly bid tab PDFs (morning and afternoon sessions), January 2022 to November 2026. Base bids are printed in whole dollars; on A+B and A+C jobs the base bid is kept, and the published rank follows the award amount.
- Every bid counted here matched its published total to within one dollar; ARDOT's rank decides who was low.
- The gap to the low bid is the firm's total over the low total, minus one, on contracts it did not win, leaving out bids over three times the low bid.
- A record covers the lettings in the data, not every contract the firm ever bid. Coverage by year is on the state page.
A name split in two, or a figure that does not match the owner's tabulation? Write to mehdi@miragemetrics.com and we correct it.
Your own bid history, read the same way
Mirage deploys AI agents for heavy civil estimating teams: quantities from the plan set, specs and addenda read, and bid tabs compared, inside your systems and your rules.