R. L. Persons Const., Inc.: ARDOT bid record
R. L. Persons Const., Inc. submitted 22 bids on Arkansas DOT contracts in the data, from 16 FEB 2022 to 18 SEP 2024, and was the low bidder on 2 of them (9%). When it was not low, its total sat a median +26% above the low bid.
- Owner
- Arkansas DOT
- Low bid volume
- $8,687,998
- Latest bid
- 18 SEP 2024
- Data through
- 04 NOV 2026
By year
| Year | Bids | Low bids | Win rate |
|---|---|---|---|
| 2022 | 5 | 1 | 20% |
| 2023 | 12 | 0 | 0% |
| 2024 | 5 | 1 | 20% |
By county
| County | Bids | Low bids | Win rate |
|---|---|---|---|
| Craighead | 2 | 0 | 0% |
| Mississippi | 2 | 1 | 50% |
| Jackson | 2 | 0 | 0% |
| Cross | 2 | 1 | 50% |
| Jefferson | 1 | 0 | 0% |
| Greene | 1 | 0 | 0% |
| Independence | 1 | 0 | 0% |
| Crittenden | 1 | 0 | 0% |
| Hot Spring | 1 | 0 | 0% |
| Lincoln | 1 | 0 | 0% |
| Sharp | 1 | 0 | 0% |
| Pope | 1 | 0 | 0% |
Pay items where it is most often lowest
| Pay item | Code | Unit | Lines bid | Lowest on the line | Its median price | All bidders' median |
|---|---|---|---|---|---|---|
| Reinforcing steel-roadway (grade 60) | 804003 | LB | 17 | 9 (53%) | $1.95 | $2.40 |
| Unclassified excavation for structures-roadway | 801101 | CY | 17 | 9 (53%) | $90.75 | $140.00 |
| Compacted embankment | 210611 | CY | 18 | 8 (44%) | $33.50 | $30.00 |
| Furnishing field office | 602011 | EACH | 18 | 8 (44%) | $22,683 | $38,533 |
| Class S concrete-roadway | 802012 | CY | 17 | 6 (35%) | $1,575.00 | $1,500.00 |
| Removal and disposal of pipe culverts | 202096 | EACH | 16 | 5 (31%) | $780.00 | $1,100.00 |
| Signs | 604003 | SF | 21 | 3 (14%) | $11.00 | $8.40 |
| Tack coat | 401011 | GAL | 20 | 3 (15%) | $7.35 | $3.75 |
| Solid sodding | 624001 | SY | 20 | 3 (15%) | $15.82 | $8.25 |
| Aggregate base course (class 7) | 303117 | TON | 18 | 3 (17%) | $55.23 | $52.19 |
| Asphalt binder (PG 64-22) in achm binder course (1") (minimum bid $120.00) | 406402 | TON | 18 | 3 (17%) | $267.50 | $126.00 |
| Grubbing | 201111 | STA | 17 | 3 (18%) | $1,900.00 | $1,700.00 |
A line counts when the firm priced it and at least one other bidder did too; the lowest unit price on the line counts whoever won the contract. Token prices and bids over three times the low bid are left out.
Who it meets most
| Firm | Contracts in common | That firm ranked ahead |
|---|---|---|
| Seagraves Construction, Inc. | 6 | 6 of 6 |
| Mobley Contractors, Inc. | 6 | 5 of 6 |
| Kesser International, Inc. | 6 | 4 of 6 |
| Robertson Contractors, Inc. | 5 | 2 of 5 |
| 1911 Construction Company, Inc. | 3 | 3 of 3 |
| West Plains BR. & Grading, LLC | 3 | 2 of 3 |
| White River Materials, Inc. | 2 | 2 of 2 |
| Capital Paving & Construction, LLC | 2 | 2 of 2 |
| Hardrock Construction, Inc. | 2 | 2 of 2 |
| Central Arkansas Contractors, Inc. | 1 | 0 of 1 |
Latest bids
| Let | Contract | County | Project | Rank | Its bid | Against the low bid |
|---|---|---|---|---|---|---|
| 18 SEP 2024 | 110713 | Cross | THE PURPOSE OF THIS PROJECT IS TO REPLACE ONE STRUCTURE ON HIGHWAY 42 AND ONE STRUCTURE ON HIGHWAY 163 IN CROSS COUNTY. THIS PROJECT CONSIST | 1 of 1 | $5,298,999 | Low |
| 31 JUL 2024 | 050475 | Izard | THE PURPOSE OF THIS PROJECT IS TO REPLACE ONE STRUCTURE ON HIGHWAY 56 IN IZARD COUNTY. THIS PROJECT CONSISTS OF CLEARING AND GRUBBING, REMOV | 4 of 4 | $2,639,777 | +31% |
| 26 JUN 2024 | 080634 | Faulkner | THE PURPOSE OF THIS PROJECT IS TO CONSTRUCT A ROUNDABOUT AT THE INTERSECTION OF HIGHWAY 64 AND HOGAN LANE IN THE CITY OF CONWAY IN FAULKNER | 3 of 3 | $4,829,999 | +31% |
| 22 MAY 2024 | 100991 | Lawrence | THE PURPOSE OF THIS PROJECT IS TO REPLACE FOUR STRUCTURES ON HIGHWAY 25 IN LAWRENCE COUNTY. THIS PROJECT CONSISTS OF CLEARING AND GRUBBING, | 2 of 3 | $7,504,777 | +2.0% |
| 28 FEB 2024 | 030529 | Hempstead | THE PURPOSE OF THIS PROJECT IS TO REPLACE THREE STRUCTURES ON HIGHWAY 195 IN HEMPSTEAD COUNTY. THIS PROJECT CONSISTS OF CLEARING AND GRUBBIN | 2 of 3 | $3,138,777 | +5.0% |
| 01 NOV 2023 | 050171 | Sharp | THE PURPOSE OF THIS PROJECT IS TO REPLACE TWO STRUCTURES ON HIGHWAYS 175 AND 175S IN CHEROKEE VILLAGE IN SHARP COUNTY. THIS PROJECT CONSISTS | 2 of 2 | $5,689,999 | +11% |
| 01 NOV 2023 | 080616 | Pope | THE PURPOSE OF THIS PROJECT IS TO REPLACE FOUR STRUCTURES ON HIGHWAY 124 IN POPE COUNTY. THIS PROJECT CONSISTS OF CLEARING AND GRUBBING, REM | 4 of 4 | $5,320,999 | +83% |
| 01 NOV 2023 | 101053 | Randolph | THE PURPOSE OF THIS PROJECT IS TO REPLACE ONE BRIDGE WITH A R.C. BOX CULVERT ON HIGHWAY 90 IN RANDOLPH COUNTY. THIS PROJECT CONSISTS OF CLEA | 2 of 3 | $1,523,999 | +4.0% |
| 01 NOV 2023 | BR1113 | Clay | THE PURPOSE OF THIS PROJECT IS TO REPLACE THE EXISTING 60 FT. TIMBER DECK BRIDGE WITH A QUAD 11' X 11' R.C. BOX CULVERT ON 0.218 MILE OF COU | 2 of 2 | $1,204,999 | 0.0% |
| 20 SEP 2023 | 020713 | Lincoln | THE PURPOSE OF THIS PROJECT IS TO REPLACE ONE STRUCTURE WITH A REINFORCED CONCRETE BOX CULVERT ON HIGHWAY 11 IN LINCOLN COUNTY. THIS PROJECT | 3 of 4 | $2,904,999 | +14% |
| 16 AUG 2023 | 110709 | Crittenden | THE PURPOSE OF THIS PROJECT IS TO REPLACE TWO STRUCTURES WITH R.C. BOX CULVERTS ON HIGHWAY 50 AND HIGHWAY 118 IN CRITTENDEN COUNTY. THIS PRO | 2 of 3 | $3,074,999 | +15% |
| 16 AUG 2023 | 061743 | Hot Spring | THE PURPOSE OF THIS PROJECT IS TO REPLACE ONE STRUCTURE ON HIGHWAY 84 IN HOT SPRING COUNTY. THIS PROJECT CONSISTS OF CLEARING AND GRUBBING, | 3 of 3 | $1,538,999 | +12% |
| 28 JUN 2023 | 050415 | Independence | THE PURPOSE OF THIS PROJECT IS TO REPLACE ONE STRUCTURE WITH A RC BOX CULVERT ON HIGHWAY 230 IN INDEPENDENCE COUNTY. THIS PROJECT CONSISTS O | 3 of 3 | $1,699,999 | +36% |
| 17 MAY 2023 | 101130 | Greene | THE PURPOSE OF THIS PROJECT IS TO REPLACE ONE STRUCTURE ON HIGHWAY 34 IN GREENE COUNTY. THS PROJECT CONSISTS OF CLEARING AND GRUBBING, REMOV | 2 of 4 | $1,584,999 | +18% |
| 12 APR 2023 | 050416 | Jackson | THE PURPOSE OF THIS PROJECT IS TO REPLACE ONE STRUCTURE ON HIGHWAY 224 IN JACKSON COUNTY. THIS PROJECT CONSISTS OF CLEARING AND GRUBBING TRE | 4 of 4 | $2,074,999 | +87% |
| 01 MAR 2023 | 100985 | Craighead | THE PURPOSE OF THIS PROJECT IS TO REPLACE THREE STRUCTURES ON HIGHWAYS 135 AND 139 IN CRAIGHEAD COUNTY. THIS PROJECT CONSISTS OF CLEARING AN | 2 of 3 | $3,996,999 | +22% |
| 11 JAN 2023 | FA1913 | Cross | THE PURPOSE OF THIS PROJECT IS TO SCARIFY AND RECOMPACT SHOULDERS ON 1.378 MILES OF COUNTY ROADS 53 AND 140 AND RECONSTRUCT APPROXIMATELY 1. | 4 of 4 | $4,974,999 | +42% |
| 09 NOV 2022 | 050414 | Jackson | THE PURPOSE OF THIS PROJECT IS TO REPLACE A BRIDGE WITH A REINFORCED CONCRETE BOX CULVERT ON HIGHWAY 980 IN JACKSON COUNTY. THIS PROJECT CON | 3 of 3 | $1,874,999 | +84% |
| 21 SEP 2022 | 100098 | Mississippi | THE PURPOSE OF THIS PROJECT IS TO REPLACE A BRIDGE WITH A BOX CULVERT ON HIGHWAY 148 IN MISSISSIPPI COUNTY. THIS PROJECT CONSISTS OF CLEARIN | 4 of 4 | $3,179,999 | +34% |
| 18 MAY 2022 | 101001 | Mississippi | THE PURPOSE OF THIS PROJECT IS TO REPLACE ONE STRUCTURE ON HIGHWAY 120 IN MISSISSIPPI COUNTY. THIS PROJECT CONSISTS OF CLEARING AND GRUBBING | 1 of 3 | $3,388,999 | Low, 7.0% under the second |
| 06 APR 2022 | C35002 | Jefferson | THE PURPOSE OF THIS PROJECT IS TO RECONSTRUCT APPROXIMATELY 0.27 MILE OF 13TH AVENUE IN PINE BLUFF IN JEFFERSON COUNTY. THIS PROJECT CONSIST | 2 of 2 | $2,084,999 | +43% |
| 16 FEB 2022 | 101062 | Craighead | THE PURPOSE OF THIS PROJECT IS TO INSTALL A TRAFFIC SIGNAL ON HWY. 18 AND QUALITY WAY IN THE CITY OF JONESBORO IN CRAIGHEAD COUNTY. THIS PRO | 2 of 2 | $839,999 | +30% |
How this record was read
ARDOT monthly bid tab PDFs (morning and afternoon sessions), January 2022 to November 2026. Base bids are printed in whole dollars; on A+B and A+C jobs the base bid is kept, and the published rank follows the award amount.
- Every bid counted here matched its published total to within one dollar; ARDOT's rank decides who was low.
- The gap to the low bid is the firm's total over the low total, minus one, on contracts it did not win, leaving out bids over three times the low bid.
- A record covers the lettings in the data, not every contract the firm ever bid. Coverage by year is on the state page.
A name split in two, or a figure that does not match the owner's tabulation? Write to mehdi@miragemetrics.com and we correct it.