ARDOT letting results, April 12, 2023
50 contracts let by Arkansas DOT on April 12, 2023, $139,663,752 in low bids, a median of 1 bidders per contract.
- Owner
- Arkansas DOT
- Contracts
- 50
- Low bids, total
- $139,663,752
- Data through
- 04 NOV 2026
Contracts let that day
| Contract | Project | County | Bids | Low bidder | Low bid | Second bid | Gap | Source |
|---|---|---|---|---|---|---|---|---|
| 040895 | THE PURPOSE OF THIS PROJECT IS TO INSTALL CABLE MEDAIN BARRIER ON I-49 & I-540 IN CRAWFORD AND WASHINGTON COUNTIES. THIS PROJECT CONSISTS OF TRENCHING AND SHOUL | Crawford, Washington | 2 | Nationwide Construction Group | $14,264,545 | $14,703,200 | +3.0% | ARDOT |
| A40025 | THE PURPOSE OF THIS PROJECT IS TO MILL AND INLAY WITH ACHM SURFACE COURSE APPROXIMATELY 10.762 MILES OF HIGHWAY 412 IN WASHINGTON COUNTY. THIS PROJECT CONSISTS | Washington | 2 | Emery Sapp & Sons, Inc. | $10,493,169 | $14,783,282 | +41% | ARDOT |
| A00045 | THE PURPOSE OF THIS PROJECT IS TO LEVEL AND OVERLAY WITH ACHM SURFACE COURSE APPROXIMATELY 3.979 MILES OF HIGHWAY 181 AND APPROXIMATELY 3.772 MILES OF HIGHWAY 1 | Mississippi | 1 | Delta Asphalt of Ark., Inc. | $8,906,577 | ARDOT | ||
| 012443 | THE PURPOSE OF THIS PROJECT IS TO POLYMER OVERLAY TWENTY-ONE BRIDGES IN VARIOUS COUNTIES. THIS PROJECT CONSISTS OF SILICONE JOINT SEALANT, MAINTENANCE OF TRAFFI | Various | 1 | Louis-Company, LLC | $8,004,308 | ARDOT | ||
| A80023 | THE PURPOSE OF THIS PROJECT IS TO LEVEL AND OVERLAY WITH ACHM SURFACE COURSE APPROXIMATELY 16.056 MILES OF HIGHWAY 7 IN POPE COUNTY. THIS PROJECT CONSISTS OF AG | Pope | 1 | Blackstone Construction, LLC | $7,413,415 | ARDOT | ||
| A40021 | THE PURPOSE OF THIS PROJECT IS TO RETAIN AND OVERLAY WITH AN ASPHALT SURFACE TREATMENT AND ACHM SURFACE COURSE FOR APPROXIMATELY 7.777 MILES AND MILL AND OVERLA | Crawford | 1 | Forsgren, Inc. | $6,516,447 | ARDOT | ||
| A70021 | THE PURPOSE OF THIS PROJECT IS TO LEVEL WITH ACHM SURFACE COURSE AND APPLY AN ULTRATHIN BONDED WEARING COURSE ON APPROXIMATELY 11.065 MILES OF HIGHWAY 82 IN COL | Columbia | 1 | Jet Asphalt & Rock Co., Inc. | $6,294,262 | ARDOT | ||
| A90021 | THE PURPOSE OF THIS PROJECT IS TO MILL AND INLAY APPROXIMATELY 4.688 MILES AND RETAIN AND OVERLAY APPROXIMATELY 6.757 MILES OF HIGHWAY 62 IN BAXTER COUNTY. THIS | Baxter | 1 | Atlas Asphalt, Inc. | $5,335,134 | ARDOT | ||
| A40022 | THE PURPOSE OF THIS PROJECT IS TO APPLY AN ULTRATHIN BONDED WEARING COURSE TO APPROXIMATELY 3.646 MILES OF HIGHWAY 62 AND 2.408 MILES OF HIGHWAY 170; COLD MILL | Washington | 1 | Apac-Central, Inc. | $5,309,369 | ARDOT | ||
| A40019 | THE PURPOSE OF THIS PROJECT IS TO RETAIN AND OVERLAY WITH ACHM SURFACE COURSE APPROXIMATELY 2.490 MILES; MILL AND OVERLAY WITH ACHM SURFACE COURSE APPROXIMATELY | Logan | 2 | Blackstone Construction, LLC | $5,167,635 | $5,998,582 | +16% | ARDOT |
| A50021 | THE PURPOSE OF THIS PROJECT IS TO RETAIN AND OVERLAY WITH ACHM SURFACE COURSE APPROXIMATELY 15.214 MILES OF HIGHWAY 56 IN IZARD COUNTY AND APPROXIMATELY 4.488 M | Izard, Sharp | 1 | Atlas Asphalt, Inc. | $5,143,905 | ARDOT | ||
| A40023 | THE PURPOSE OF THIS PROJECT IS TO MILL AND INLAY APPROXIMATELY 7.107 MILES OF HIGHWAY 64 IN FRANKLIN COUNTY. THIS PROJECT CONSISTS OF REMOVAL AND DISPOSAL OF IT | Franklin | 2 | Forsgren, Inc. | $4,997,454 | $5,663,826 | +13% | ARDOT |
| A50022 | THE PURPOSE OF THIS PROJECT IS TO RETAIN AND OVERLAY WITH ACHM SURFACE COURSE APPROXIMATELY 8.010 MILES OF HIGHWAY 69 IN INDEPENDENCE COUNTY AND APPROXIMATELY 4 | Independence, Jackson | 1 | Atlas Asphalt, Inc. | $4,605,130 | ARDOT | ||
| A30024 | THE PURPOSE OF THIS PROJECT IS TO OVERLAY WITH SURFACE COURSE APPROXIMATELY 4.690 MILES AND MILL AND OVERLAY WITH ACHM SURFACE COURSE APPROXIMATELY 6.081 MILES | Hempstead | 2 | Redstone Const. Group, Inc. | $4,528,583 | $5,281,676 | +17% | ARDOT |
| 012444 | THE PURPOSE OF THIS PROJECT IS TO POLYMER OVERLAY TWENTY-ONE BRIDGES IN VARIOUS COUNTIES. THIS PROJECT CONSISTS OF JOINT REHABILITATION, SILICONE JOINT SEALANT, | Various | 2 | PBX Corporation | $3,537,528 | $3,969,969 | +12% | ARDOT |
| A80021 | THE PURPOSE OF THIS PROJECT IS TO LEVEL AND OVERLAY WITH ACHM SURFACE COURSE ON APPROXIMATELY 5.812 MILES AND ADD 2'-0" SHOULDERS ON 5.560 MILES OF HIGHWAY 7 IN | Yell | 2 | Rogers Group, Inc. | $3,373,979 | $3,403,839 | +1.0% | ARDOT |
| 101009 | THE PURPOSE OF THIS PROJECT IS TO REPLACE ONE BRIDGE STRUCTURE ON HIGHWAY 61 IN MISSISSIPPI COUNTY. THIS PROJECT CONSISTS OF CLEARING AND GRUBBING, REMOVAL AND | Mississippi | 1 | Robertson Contractors, Inc. | $3,078,363 | ARDOT | ||
| A10019 | THE PURPOSE OF THIS PROJECT IS TO MILL AND INLAY WITH ACHM SURFACE COURSE APPROXIMATELY 5.264 MILES AND RETAIN AND FOG SEAL APPROXIMATELY 3.433 MILES OF HIGHWAY | Monroe | 1 | Atlas Asphalt, Inc. | $2,891,514 | ARDOT | ||
| A60022 | THE PURPOSE OF THIS PROJECT IS TO LEVEL WITH ACHM SURFACE COURSE AND APPLY AN ULTRATHIN BONDED WEARING COURSE ON APPROXIMATELY 3.588 MILES OF HIGHWAY 10 IN PULA | Pulaski | 2 | Redstone Const. Group, Inc. | $2,356,677 | $2,498,552 | +6.0% | ARDOT |
| A60023 | THE PURPOSE OF THIS PROJECT IS TO MILL AND OVERLAY WITH ACHM SURFACE COURSE APPROXIMATELY 2.770 MILES OF HIGHWAY 10 IN PULASKI COUNTY. THIS PROJECT CONSISTS OF | Pulaski | 1 | Cranford Construction Co. | $2,306,802 | ARDOT | ||
| A00039 | THE PURPOSE OF THIS PROJECT IS TO LEVEL AND OVERLAY WITH ACHM SURFACE COURSE APPROXIMATELY 5.926 MILES OF HIGHWAY 14 IN POINSETT COUNTY. THIS PROJECT CONSISTS O | Poinsett | 2 | Delta Asphalt of Ark., Inc. | $2,100,588 | $2,137,634 | +2.0% | ARDOT |
| A60024 | THE PURPOSE OF THIS PROJECT IS TO MILL AND OVERLAY SECTIONS OF HIGHWAY 88 AND HIGHWAY 35 IN SALINE COUNTY. THIS PROJECT CONSISTS OF AGGREGATE BASE COURSE, ACHM | Saline | 1 | Cranford Construction Co. | $1,858,655 | ARDOT | ||
| 020791 | THE PURPOSE OF THIS PROJECT IS TO REPAIR 2.31 MILES OF EMBANKMENT ON HIGHWAYS 82, 270 AND 278 IN ASHLEY, DREW AND JEFFERSON COUNTIES. THIS PROJECT CONSISTS OF E | Ashley, Drew, Jefferson | 2 | T & T Construction, LLC | $1,825,874 | $1,947,428 | +7.0% | ARDOT |
| 070511 | THE PURPOSE OF THIS PROJECT IS TO REPLACE TWO EXISTING STRUCTURES WITH TWO R.C. BOX CULVERTS ON HIGHWAY 9 IN DALLAS COUNTY. THIS PROJECT CONSISTS OF CLEARING AN | Dallas | 2 | Mehaffy Const. Co., Inc. | $1,747,496 | $1,829,268 | +5.0% | ARDOT |
| A00044 | THE PURPOSE OF THIS PROJECT IS TO LEVEL WITH ACHM SURFACE COURSE AND APPLY AN ULTRATHIN BONDED WEARING COURSE TO APPROXIMATELY 4.002 MILES OF HIGHWAY 67 IN CLAY | Clay | 2 | Delta Asphalt of Ark., Inc. | $1,592,260 | $1,658,602 | +4.0% | ARDOT |
| 061783 | THE PURPOSE OF THIS PROJECT IS TO CLEAN AND PAINT NINE STRUCTURES IN PULASKI COUNTY. THIS PROJECT CONSISTS OF CLEANING AND PAINTING EXISTING STRUCTURAL STEEL, R | Pulaski | 7 | Omega Coatings & Construction, LLC | $1,400,461 | $1,529,204 | +9.0% | ARDOT |
| 061681 | THE PURPOSE OF THIS PROJECT IS TO RUT MILL AND OVERLAY WITH ACHM SURFACE COURSE APPROXIMATELY 1.546 MILES, WITH CONSTRUCTION OF 2'-0" SHOULDERS ON APPROXIMATELY | Saline | 1 | Cranford Construction Co. | $1,342,282 | ARDOT | ||
| A10021 | THE PURPOSE OF THIS PROJECT IS TO MILL AND INLAY WITH ACHM SURFACE COURSE APPROXIMATELY 0.946 MILES AND APPLY AN ULTRATHIN BONDED WEARING COURSE ON APPROXIMATEL | Monroe | 2 | Rogers Group, Inc. | $1,244,949 | $1,273,682 | +2.0% | ARDOT |
| 050416 | THE PURPOSE OF THIS PROJECT IS TO REPLACE ONE STRUCTURE ON HIGHWAY 224 IN JACKSON COUNTY. THIS PROJECT CONSISTS OF CLEARING AND GRUBBING TREES, EARTHWORK, AGGRE | Jackson | 4 | Phillips Hardy, Inc. | $1,106,945 | $1,320,884 | +19% | ARDOT |
| C33008 | THE PURPOSE OF THIS PROJECT IS TO OVERLAY APPROXIMATELY 1.11 MILES OF VARIOUS CITY STREETS IN THE CITY OF CALICO ROCK, OVERLAY APPROXIMATELY 1.61 MILES OF VARIO | Izard | 1 | Atlas Asphalt, Inc. | $1,018,116 | ARDOT | ||
| C76071 | THE PURPOSE OF THIS PROJECT IS TO OVERLAY APPROXIMATELY 1.00 MILE OF VARIOUS CITY STREETS IN THE CITY OF STAMPS IN LAFAYETTE COUNTY AND 1.00 MILE OF VARIOUS CIT | Columbia, Lafayette | 1 | Smackover Paving Co. | $725,008 | ARDOT | ||
| C67006 | THE PURPOSE OF THIS PROJECT IS TO OVERLAY APPROXIMATELY 1.65 MILES OF VARIOUS CITY STREETS IN EVENING SHADE AND APPROXIMATELY 1.56 MILES OF VARIOUS CITY STREETS | Sharp | 1 | Atlas Asphalt, Inc. | $716,857 | ARDOT | ||
| C12008 | THE PURPOSE OF THIS PROJECT IS TO OVERLAY APPROXIMATELY 2.80 MILES OF VARIOUS CITY STREETS IN THE CITY OF GREERS FERRY AND OVERLAY APPROXIMATELY 1.67 MILES OF V | Cleburne | 2 | CK Asphalt, LLC | $653,353 | $728,203 | +11% | ARDOT |
| C76070 | THE PURPOSE OF THIS PROJECT IS TO OVERLAY APPROXIMATELY 1.14 MILES OF VARIOUS CITY STREETS IN THE CITY OF HAMPTON IN CALHOUN COUNTY AND APPROXIMATELY 0.86 MILE | Bradley, Calhoun | 1 | Smackover Paving Co. | $652,759 | ARDOT | ||
| C52009 | THE PURPOSE OF THIS PROJECT IS TO OVERLAY APPROXIMATELY 1.14 MILES OF VARIOUS CITY STREETS IN THE CITY OF CAMDEN AND OVERLAY APPROXIMATELY 0.72 MILE OF VARIOUS | Ouachita | 1 | Jet Asphalt & Rock Co., Inc. | $651,110 | ARDOT | ||
| SA0250 | THE PURPOSE OF THIS PROJECT IS TO SURFACE APPROXIMATELY 5.00 MILES OF COUNTY ROAD 25 IN ASHLEY COUNTY. THIS PROJECT CONSISTS OF RECONSTRUCTED BASE COURSE, ASPHA | Ashley | 1 | Smackover Paving Co. | $646,749 | ARDOT | ||
| SA7398 | THE PURPOSE OF THIS PROJECT IS TO OVERLAY APPROXIMATELY 3.78 MILES OF COUNTY ROADS 12 AND 90 IN WHITE COUNTY. THIS PROJECT CONSISTS OF AGGREGATE BASE COURSE, AC | White | 3 | CK Asphalt, LLC | $572,764 | $641,142 | +12% | ARDOT |
| C03010 | THE PURPOSE OF THIS PROJECT IS TO OVERLAY APPROXIMATELY 1.19 MILES OF VARIOUS CITY STREETS IN BRIARCLIFF AND APPROXIMATELY 1.68 MILES OF VARIOUS CITY STREETS IN | Baxter | 2 | Atlas Asphalt, Inc. | $552,725 | $554,146 | 0.0% | ARDOT |
| C76073 | THE PURPOSE OF THIS PROJECT IS TO OVERLAY AND SURFACE APPROXIMATELY 0.55 MILE OF VARIOUS CITY STREETS IN THE CITY OF BEEDEVILLE IN JACKSON COUNTY AND 1.22 MILES | Jackson, Woodruff | 3 | Atlas Asphalt, Inc. | $516,433 | $518,454 | 0.0% | ARDOT |
| SA1257 | THE PURPOSE OF THIS PROJECT IS TO OVERLAY APPROXIMATELY 3.00 MILES OF COUNTY ROAD 65 IN CLEBURNE COUNTY. THIS PROJECT CONSISTS OF ACHM SURFACE COURSE, MAINTENAN | Cleburne | 2 | CK Asphalt, LLC | $474,373 | $578,459 | +22% | ARDOT |
| C62013 | THE PURPOSE OF THIS PROJECT IS TO OVERLAY APPROXIMATELY 1.83 MILES OF W. MAIN ST. IN THE CITY OF TRASKWOOD IN SALINE COUNTY. THIS PROJECT CONSISTS OF AGGREGATE | Saline | 1 | M & T Paving & Const. Co., Inc. | $467,222 | ARDOT | ||
| C02009 | THE PURPOSE OF THIS PROJECT IS TO OVERLAY APPROXIMATELY 1.53 MILES OF VARIOUS CITY STREETS IN THE CITY OF HAMBURG IN ASHLEY COUNTY. THIS PROJECT CONSISTS OF BOR | Ashley | 1 | Pine Bluff Sand & Gravel Co. | $433,686 | ARDOT | ||
| C62014 | THE PURPOSE OF THIS PROJECT IS TO OVERLAY APPROXIMATELY 1.30 MILES OF VARIOUS CITY STREETS IN THE CITY OF SHANNON HILLS IN SALINE COUNTY. THIS PROJECT CONSISTS | Saline | 1 | Salt Creek Paving & Const. Co., Inc. | $401,697 | ARDOT | ||
| C09006 | THE PURPOSE OF THIS PROJECT IS TO OVERLAY APPROXIMATELY 1.05 MILES OF VARIOUS CITY STREETS IN THE CITY OF DERMOTT IN CHICOT COUNTY. THIS PROJECT CONSISTS OF AGG | Chicot | 1 | Pine Bluff Sand & Gravel Co. | $390,758 | ARDOT | ||
| C30006 | THE PURPOSE OF THIS PROJECT IS TO OVERLAY & SURFACE APPROXIMATELY 1.40 MILES OF VARIOUS CITY STREETS IN THE CITY OF FRIENDSHIP IN HOT SPRING COUNTY. THIS PROJEC | Hot Spring | 1 | M & T Paving & Const. Co., Inc. | $374,735 | ARDOT | ||
| C47016 | THE PURPOSE OF THIS PROJECT IS TO OVERLAY APPROXIMATELY 1.41 MILES OF VARIOUS CITY STREETS IN THE CITY OF VICTORIA IN MISSISSIPPI COUNTY. THIS PROJECT CONSISTS | Mississippi | 2 | Sugg Construction, Inc. | $367,024 | $416,499 | +13% | ARDOT |
| C21008 | THE PURPOSE OF THIS PROJECT IS TO REHABILITATE AND OVERLAY APPROXIMATELY 0.57 MILE OF VARIOUS CITY STREETS IN THE CITY OF MCGEHEE IN DESHA COUNTY. THIS PROJECT | Desha | 1 | Pine Bluff Sand & Gravel Co. | $347,594 | ARDOT | ||
| C33010 | THE PURPOSE OF THIS PROJECT IS TO OVERLAY APPROXIMATELY 1.36 MILES OF EAST TRI LAKES DRIVE IN THE CITY OF HORSESHOE BEND IN IZARD COUNTY. THIS PROJECT CONSISTS | Izard | 1 | Atlas Asphalt, Inc. | $333,611 | ARDOT | ||
| SA4049 | THE PURPOSE OF THIS PROJECT IS TO RESEAL APPROXIMATELY 3.05 MILES OF COUNTY ROAD 84 IN LINCOLN COUNTY. THIS PROJECT CONSISTS OF ASPHALT SURFACE TREATMENT, ACHM | Lincoln | 1 | Salt Creek Paving & Const. Co., Inc. | $320,000 | ARDOT | ||
| SA5449 | THE PURPOSE OF THIS PROJECT IS TO OVERLAY APPROXIMATELY 1.06 MILES OF COUNTY ROADS 68 & 96 IN PHILLIPS COUNTY. THIS PROJECT CONSISTS OF AGGREGATE BASE COURSE, A | Phillips | 2 | Atlas Asphalt, Inc. | $302,872 | $359,914 | +19% | ARDOT |
Gap is the second bid over the low bid. Where a contract shows fewer bids than ARDOT received, the others did not match their published totals and are left out.