Smackover Paving Co.: ARDOT bid record
Smackover Paving Co. submitted 52 bids on Arkansas DOT contracts in the data, from 12 JAN 2022 to 23 SEP 2026, and was the low bidder on 39 of them (75%). When it was not low, its total sat a median +20% above the low bid.
- Owner
- Arkansas DOT
- Low bid volume
- $18,337,486
- Latest bid
- 23 SEP 2026
- Data through
- 04 NOV 2026
By year
| Year | Bids | Low bids | Win rate |
|---|---|---|---|
| 2022 | 7 | 7 | 100% |
| 2023 | 12 | 11 | 92% |
| 2024 | 11 | 9 | 82% |
| 2025 | 10 | 6 | 60% |
| 2026 | 12 | 6 | 50% |
By county
| County | Bids | Low bids | Win rate |
|---|---|---|---|
| Ouachita | 7 | 6 | 86% |
| Dallas | 6 | 2 | 33% |
| Nevada | 5 | 3 | 60% |
| Lafayette | 5 | 4 | 80% |
| Ashley | 4 | 3 | 75% |
| Bradley | 3 | 2 | 67% |
| Union | 3 | 3 | 100% |
| Hempstead | 3 | 3 | 100% |
| Cleveland | 2 | 1 | 50% |
| Columbia | 2 | 2 | 100% |
| Calhoun | 2 | 2 | 100% |
| Calhoun, Dallas | 1 | 1 | 100% |
Pay items where it is most often lowest
| Pay item | Code | Unit | Lines bid | Lowest on the line | Its median price | All bidders' median |
|---|---|---|---|---|---|---|
| Signs | 604003 | SF | 20 | 11 (55%) | $9.50 | $8.40 |
| Mineral aggregate in achm surface course (3/8") | 407161 | TON | 15 | 9 (60%) | $179.77 | $124.22 |
| Tack coat | 401011 | GAL | 17 | 7 (41%) | $6.00 | $3.75 |
| Channel post sign support (type C) | 729003 | EACH | 6 | 3 (50%) | $91.00 | $89.00 |
| Standard sign | 726002 | SF | 5 | 3 (60%) | $25.00 | $25.38 |
| Mineral aggregate in asphalt surface treatment (class 2) | 402112 | TON | 5 | 3 (60%) | $125.00 | $81.46 |
| Polymer modified cationic emulsified asphalt (CRS-2P) (solid polymer) | 402214 | GAL | 5 | 3 (60%) | $4.80 | $4.80 |
| Achm patching of existing roadway | 415011 | TON | 12 | 2 (17%) | $350.00 | $250.00 |
| Reflectorized paint pavement marking yellow (4") | 718101 | LF | 8 | 2 (25%) | $0.16 | $0.21 |
| Scarifying and recompacting roadway | 216201 | STA | 8 | 2 (25%) | $1,075.00 | $1,000.00 |
| Asphalt binder (PG 64-22) in achm surface course (3/8") (minimum bid $120.00) | 407431 | TON | 15 | 1 (7%) | $500.00 | $120.00 |
| Aggregate base course (class 7) | 303117 | TON | 6 | 1 (17%) | $105.00 | $52.19 |
A line counts when the firm priced it and at least one other bidder did too; the lowest unit price on the line counts whoever won the contract. Token prices and bids over three times the low bid are left out.
Who it meets most
| Firm | Contracts in common | That firm ranked ahead |
|---|---|---|
| Salt Creek Paving & Const. Co., Inc. | 8 | 5 of 8 |
| Redstone Construction Group, Inc. | 6 | 6 of 6 |
| Cranford Construction Co. | 6 | 5 of 6 |
| Jet Asphalt & Rock Co., Inc. | 3 | 3 of 3 |
| Tri State Asphalt, Inc. | 2 | 1 of 2 |
| Marion County Paving, LLC | 1 | 0 of 1 |
| Redstone Const. Group, Inc. | 1 | 0 of 1 |
| Pine Bluff Sand & Gravel Co. | 1 | 1 of 1 |
| Kesser International, Inc. | 1 | 0 of 1 |
| M & T Paving & Const. Co., Inc. | 1 | 1 of 1 |
Latest bids
| Let | Contract | County | Project | Rank | Its bid | Against the low bid |
|---|---|---|---|---|---|---|
| 23 SEP 2026 | SA2046 | Dallas | THE PURPOSE OF THIS PROJECT IS TO OVERLAY APPROXIMATELY 0.96 MILE OF COUNTY ROAD 246 IN DALLAS COUNTY. THIS PROJECT CONSISTS OF ACHM SURFACE | 2 of 3 | $331,498 | +11% |
| 20 MAY 2026 | SA0770 | Calhoun | THE PURPOSE OF THIS PROJECT IS TO RESEAL APPROXIMATELY 1.00 MILE OF COUNTY ROAD 187 AND APPROXIMATELY 0.85 MILE OF COUNTY ROAD 24 IN CALHOUN | 1 of 2 | $170,646 | Low, 25% under the second |
| 20 MAY 2026 | SA3736 | Lafayette | THE PURPOSE OF THIS PROJECT IS TO LEVEL AND SEAL APPROXIMATELY 4.15 MILES OF CO. RD. 28 IN LAFAYETTE COUNTY. THIS PROJECT CONSISTS OF FOG SE | 1 of 1 | $410,462 | Low |
| 08 APR 2026 | C20006 | Dallas | THE PURPOSE OF THIS PROJECT IS TO OVERLAY APPROXIMATELY 1.20 MILES OF VARIOUS CITY STREETS IN THE CITY OF CARTHAGE IN DALLAS COUNTY. THIS PR | 3 of 3 | $542,647 | +48% |
| 08 APR 2026 | C52010 | Ouachita | THE PURPOSE OF THIS PROJECT IS TO OVERLAY APPROXIMATELY 2.36 MILES OF VARIOUS CITY STREETS IN THE CITY OF BEARDEN IN OUACHITA COUNTY. THIS P | 1 of 1 | $596,112 | Low |
| 08 APR 2026 | SA0944 | Chicot | THE PURPOSE OF THIS PROJECT IS TO SURFACE APPROXIMATELY 3.96 MILES OF JENNIE CUTOFF RD. IN CHICOT COUNTY. THIS PROJECT CONSISTS OF RECONSTRU | 1 of 1 | $659,420 | Low |
| 08 APR 2026 | SA2138 | Desha | THE PURPOSE OF THIS PROJECT IS TO LEVEL AND RESEAL APPROXIMATELY 1.08 MILES OF STATE POLICE RD IN DESHA COUNTY. THIS PROJECT CONSISTS OF SIN | 2 of 2 | $314,967 | +23% |
| 04 MAR 2026 | SA2950 | Hempstead | THE PURPOSE OF THIS PROJECT IS TO RESEAL APPROXIMATELY 1.65 MILES ON CO. RD. 14 IN HEMPSTEAD COUNTY. THIS PROJECT CONSISTS OF AGGREGATE BASE | 1 of 2 | $312,384 | Low, 11% under the second |
| 21 JAN 2026 | C07003 | Calhoun | THE PURPOSE OF THIS PROJECT IS TO SURFACE APPROXIMATELY 0.87 MILE OF VARIOUS CITY STREETS IN THE CITY OF HARRELL IN CALHOUN COUNTY. THIS PRO | 1 of 1 | $297,688 | Low |
| 21 JAN 2026 | C37007 | Lafayette | THE PURPOSE OF THIS PROJECT IS TO OVERLAY APPROXIMATELY 0.83 MILE OF VARIOUS CITY STREETS IN THE CITY OF BRADLEY IN LAFAYETTE COUNTY. THIS P | 2 of 2 | $426,493 | +26% |
| 21 JAN 2026 | SA0654 | Bradley | THE PURPOSE OF THIS PROJECT IS TO LEVEL AND RESEAL APPROXIMATELY 8.76 MILES ON COUNTY ROADS 1, 55, & 57 IN BRADLEY COUNTY. THIS PROJECT CONS | 2 of 2 | $498,037 | +3.0% |
| 21 JAN 2026 | SA2045 | Dallas | THE PURPOSE OF THIS PROJECT IS TO OVERLAY APPROXIMATELY 1.02 MILES OF CO. RD. 236 IN DALLAS COUNTY. THIS PROJECT CONSISTS OF ACHM SURFACE CO | 4 of 4 | $297,556 | +67% |
| 09 APR 2025 | SA0252 | Ashley | THE PURPOSE OF THIS PROJECT IS TO SURFACE APPROXIMATELY 1.02 MILES OF COUNTY ROAD 402 AND 0.75 MILE OF COUNTY ROAD 403 IN ASHLEY COUNTY. THI | 1 of 1 | $224,668 | Low |
| 09 APR 2025 | SA1449 | Columbia | THE PURPOSE OF THIS PROJECT IS TO LEVEL AND SEAL APPROXIMATELY 7.15 MILES OF COUNTY ROAD 15 IN COLUMBIA COUNTY. THIS PROJECT CONSISTS OF ASP | 1 of 1 | $483,399 | Low |
| 09 APR 2025 | SA2044 | Dallas | THE PURPOSE OF THIS PROJECT IS TO OVERLAY APPROXIMATELY 1.04 MILES OF COUNTY ROADS 6 AND 19 IN DALLAS COUNTY. THIS PROJECT CONSISTS OF ACHM | 4 of 4 | $359,994 | +26% |
| 09 APR 2025 | SA3147 | Howard | THE PURPOSE OF THIS PROJECT IS TO LEVEL AND SEAL APPROXIMATELY 3.06 MILES OF COUNTY ROAD 2 IN HOWARD COUNTY. THIS PROJECT CONSISTS OF SCARIF | 3 of 3 | $424,937 | +4.0% |
| 26 FEB 2025 | SA5259 | Ouachita | THE PURPOSE OF THIS PROJECT IS TO RESEAL APPROXIMATELY 4.35 MILES OF COUNTY ROADS 2 AND 55 IN OUACHITA COUNTY. THIS PROJECT CONSISTS OF ASPH | 1 of 1 | $221,205 | Low |
| 15 JAN 2025 | C46005 | Miller | THE PURPOSE OF THIS PROJECT IS TO OVERLAY APPROXIMATELY 1.10 MILES OF WILSON STREET AND MLK JR. BLVD. IN THE CITY OF GARLAND IN MILLER COUNT | 1 of 3 | $279,937 | Low, 4.0% under the second |
| 15 JAN 2025 | C50008 | Nevada | THE PURPOSE OF THIS PROJECT IS TO OVERLAY APPROXIMATELY 0.30 MILE OF LAKE ROAD IN THE CITY OF CALE, APPROXIMATELY 1.34 MILES OF VARIOUS CITY | 5 of 5 | $1,030,948 | +38% |
| 15 JAN 2025 | C70010 | Union | THE PURPOSE OF THIS PROJECT IS TO OVERLAY APPROXIMATELY 1.36 MILES OF VARIOUS CITY STREETS IN THE CITY OF EL DORADO AND OVERLAY APPROXIMATEL | 1 of 1 | $1,039,193 | Low |
| 15 JAN 2025 | C76086 | Ouachita, Union | THE PURPOSE OF THIS PROJECT IS TO OVERLAY APPROXIMATELY 0.94 MILE OF VARIOUS CITY STREETS IN THE CITY OF LOUANN IN OUACHITA COUNTY, APPROXIM | 1 of 1 | $1,031,609 | Low |
| 15 JAN 2025 | SA5034 | Nevada | THE PURPOSE OF THIS PROJECT IS TO DOUBLE SEAL APPROXIMATELY 0.51 MILE OF COUNTY ROAD 260 IN NEVADA COUNTY. THIS PROJECT CONSISTS OF SCARIFYI | 2 of 2 | $169,204 | +19% |
| 22 MAY 2024 | SA1361 | Cleveland | THE PURPOSE OF THIS PROJECT IS TO OVERLAY APPROXIMATELY 1.70 MILES OF COUNTY ROAD 3 AND COUNTY ROAD 6 IN CLEVELAND COUNTY. THIS PROJECT CONS | 2 of 2 | $532,634 | +3.0% |
| 22 MAY 2024 | SA5258 | Ouachita | THE PURPOSE OF THIS PROJECT IS TO OVERLAY APPROXIMATELY 2.71 MILES OF COUNTY ROADS 23 AND 88 IN OUACHITA COUNTY. THIS PROJECT CONSISTS OF AG | 2 of 2 | $895,977 | +2.0% |
| 28 FEB 2024 | C13005 | Cleveland | THE PURPOSE OF THIS PROJECT IS TO OVERLAY APPROXIMATELY 0.22 MILE OF HOLMAN STREET AND SURFACE APPROXIMATELY 0.53 MILE OF BEAR STATE ROAD IN | 1 of 1 | $390,348 | Low |
How this record was read
ARDOT monthly bid tab PDFs (morning and afternoon sessions), January 2022 to November 2026. Base bids are printed in whole dollars; on A+B and A+C jobs the base bid is kept, and the published rank follows the award amount.
- Every bid counted here matched its published total to within one dollar; ARDOT's rank decides who was low.
- The gap to the low bid is the firm's total over the low total, minus one, on contracts it did not win, leaving out bids over three times the low bid.
- A record covers the lettings in the data, not every contract the firm ever bid. Coverage by year is on the state page.
A name split in two, or a figure that does not match the owner's tabulation? Write to mehdi@miragemetrics.com and we correct it.
Your own bid history, read the same way
Mirage deploys AI agents for heavy civil estimating teams: quantities from the plan set, specs and addenda read, and bid tabs compared, inside your systems and your rules.