ARDOT contract SA2950 bid tabulation

THE PURPOSE OF THIS PROJECT IS TO RESEAL APPROXIMATELY 1.65 MILES ON CO. RD. 14 IN HEMPSTEAD COUNTY. THIS PROJECT CONSISTS OF AGGREGATE BASE COURSE, ASPHALT SURFACE TREATMENT, SCARIFYING AND RECOMPACTING, PAVEMENT MARKING, MAINTENANCE OF TRAFFIC, AND MISC. ITEMS. Let by Arkansas DOT on March 4, 2026, Hempstead. 2 bids received; low bid $312,384 by Smackover Paving Co..

Owner
Arkansas DOT
Letting
04 MAR 2026
Pay items
14
Data through
04 NOV 2026

Bidders

RankBidderTotal bidAgainst the low bid
1Smackover Paving Co.$312,384Low
2Salt Creek Paving & Const. Co., Inc.$348,162+11%
ARDOT contract SA2950: bids by rank

Bid tabulation

LinePay itemUnitQuantity1. Smackover Paving Co.2. Salt Creek Paving & Const. Co., Inc.
0001Scarifying and recompacting roadway (216201)STA55$525.00$525.00
0002Aggregate base course (class 7) (303117)TON1,109$79.85$79.85
0003Prime coat (401001)GAL4,883$6.23$5.16
0004Tack coat (401011)GAL143$6.00$7.00
0005Mineral aggregate in asphalt surface treatment (class 1) (402111)TON493$104.91$132.00
0006Polymer modified cationic emulsified asphalt (CRS-2P) (solid polymer) (402214)GAL14,721$4.64$5.73
0007Mineral aggregate in achm surface course (3/8") (407161)TON89$241.74$316.00
0008Asphalt binder (PG 64-22) in achm surface course (3/8") (minimum bid $120.00) (407431)TON6$241.74$316.00
0009Maintenance of traffic (603009)LS1$6,000.00$5,000.00
0010Signs (604003)SF234$6.00$9.20
0011Reflectorized paint pavement marking yellow (4") (718101)LF18,753$0.15$0.18
0012Standard sign (726002)SF36$23.00$52.00
0013Channel post sign support (type C) (729003)EACH8$80.00$86.00
0014Mobilization (unit bid amount may not exceed 5% of subtotal) (601001)LS1$9,000.00$12,000
ARDOT contract SA2950: unit prices by line

The pay item list has one row per line (item, description, unit, quantity, the low bidder's unit price), the flat layout estimating software imports. Pay items with a page of their own open their price history.

Source

Read from ARDOT's tabulation for this contract. ARDOT monthly bid tab PDFs (morning and afternoon sessions), January 2022 to November 2026. Base bids are printed in whole dollars; on A+B and A+C jobs the base bid is kept, and the published rank follows the award amount.

Every contract let that day: ARDOT letting of March 4, 2026. Compiled by Mirage Metrics.

Your own bid history, read the same way

Mirage deploys AI agents for heavy civil estimating teams: quantities from the plan set, specs and addenda read, and bid tabs compared, inside your systems and your rules.

We use your email to reply to you and, now and then, to tell you about Mirage. You can opt out at any time. Privacy policy