ARDOT contract C50008 bid tabulation
THE PURPOSE OF THIS PROJECT IS TO OVERLAY APPROXIMATELY 0.30 MILE OF LAKE ROAD IN THE CITY OF CALE, APPROXIMATELY 1.34 MILES OF VARIOUS CITY STREETS IN THE CITY OF EMMET, AND APPROXIMATELY 0.74 MILE OF VARIOUS CITY STREETS IN THE CITY OF ROSSTON IN NEVADA COUNTY. THIS PROJECT CONSISTS OF AGGREGATE BASE COURSE, ACHM BINDER AND SURFACE COURSES, SCARIFYING AND RECOMPACTING, ACHM PATCHING OF EXISTING ROADWAY, MAINTENANCE OF TRAFFIC AND MISC. ITEMS. Let by Arkansas DOT on January 15, 2025, Nevada. 5 bids received; low bid $744,759 by Salt Creek Paving & Const. Co., Inc..
- Owner
- Arkansas DOT
- Letting
- 15 JAN 2025
- Pay items
- 10
- Data through
- 04 NOV 2026
Bidders
| Rank | Bidder | Total bid | Against the low bid |
|---|---|---|---|
| 1 | Salt Creek Paving & Const. Co., Inc. | $744,759 | Low |
| 2 | Redstone Construction Group, Inc. | $765,805 | +3.0% |
| 3 | Cranford Construction Co. | $793,951 | +7.0% |
| 4 | Tri State Asphalt, Inc. | $906,743 | +22% |
| 5 | Smackover Paving Co. | $1,030,948 | +38% |
Bid tabulation
| Line | Pay item | Unit | Quantity | 1. Salt Creek Paving & Const. Co., Inc. | 2. Redstone Construction Group, Inc. | 3. Cranford Construction Co. | 4. Tri State Asphalt, Inc. | 5. Smackover Paving Co. |
|---|---|---|---|---|---|---|---|---|
| 0001 | Scarifying and recompacting roadway (216201) | STA | 39 | $700.00 | $585.64 | $1,300.00 | $1,300.00 | $900.00 |
| 0002 | Aggregate base course (class 7) (303107) | TON | 3,247 | $57.00 | $63.18 | $75.00 | $75.00 | $90.00 |
| 0003 | Tack coat (401011) | GAL | 1,373 | $3.80 | $0.10 | $6.00 | $6.00 | $6.00 |
| 0004 | Mineral aggregate in achm surface course (3/8") (407161) | TON | 2,586 | $177.35 | $94.91 | $155.50 | $180.00 | $225.00 |
| 0005 | Asphalt binder (PG 64-22) in achm surface course (3/8") (minimum bid $120.00) (407431) | TON | 157 | $177.35 | $1,200.00 | $120.00 | $250.00 | $250.00 |
| 0006 | Achm patching of existing roadway (415011) | TON | 72 | $296.00 | $485.73 | $153.37 | $250.00 | $400.00 |
| 0007 | Maintenance of traffic (603009) | LS | 1 | $1,000.00 | $27,500 | $7,434.54 | $25,000 | $10,000 |
| 0008 | Signs (604003) | SF | 360 | $8.00 | $8.80 | $8.00 | $7.50 | $8.00 |
| 0009 | Wheelchair ramps (type 3) (641006) | SY | 11 | $500.00 | $1,053.73 | $1,045.50 | $1,100.00 | $1,600.00 |
| 0010 | Mobilization (unit bid amount may not exceed 5% of subtotal) (601001) | LS | 1 | $10,000 | $26,613 | $37,667 | $41,750 | $15,000 |
The pay item list has one row per line (item, description, unit, quantity, the low bidder's unit price), the flat layout estimating software imports. Pay items with a page of their own open their price history.
Source
Read from ARDOT's tabulation for this contract. ARDOT monthly bid tab PDFs (morning and afternoon sessions), January 2022 to November 2026. Base bids are printed in whole dollars; on A+B and A+C jobs the base bid is kept, and the published rank follows the award amount.
Every contract let that day: ARDOT letting of January 15, 2025. Compiled by Mirage Metrics.
Your own bid history, read the same way
Mirage deploys AI agents for heavy civil estimating teams: quantities from the plan set, specs and addenda read, and bid tabs compared, inside your systems and your rules.