ARDOT contract SA2044 bid tabulation

THE PURPOSE OF THIS PROJECT IS TO OVERLAY APPROXIMATELY 1.04 MILES OF COUNTY ROADS 6 AND 19 IN DALLAS COUNTY. THIS PROJECT CONSISTS OF ACHM SURFACE COURSE, SCARIFYING AND RECOMPACTING ROADWAY, PATCHING OF EXISTING ROADWAY, MAINTENANCE OF TRAFFIC, AND MISC. ITEMS. Let by Arkansas DOT on April 9, 2025, Dallas. 4 bids received; low bid $285,789 by Cranford Construction Co..

Owner
Arkansas DOT
Letting
09 APR 2025
Pay items
8
Data through
04 NOV 2026

Bidders

RankBidderTotal bidAgainst the low bid
1Cranford Construction Co.$285,789Low
2Jet Asphalt & Rock Co., Inc.$309,642+8.0%
3Redstone Construction Group, Inc.$317,387+11%
4Smackover Paving Co.$359,994+26%
ARDOT contract SA2044: bids by rank

Bid tabulation

LinePay itemUnitQuantity1. Cranford Construction Co.2. Jet Asphalt & Rock Co., Inc.3. Redstone Construction Group, Inc.4. Smackover Paving Co.
0001Scarifying and recompacting roadway (216201)STA7$723.61$650.00$798.00$1,550.00
0002Tack coat (401011)GAL1,712$3.73$0.01$4.23$5.00
0003Mineral aggregate in achm surface course (3/8") (407161)TON1,592$126.38$142.00$149.00$172.00
0004Asphalt binder (PG 64-22) in achm surface course (3/8") (minimum bid $120.00) (407431)TON105$120.00$120.00$120.00$172.00
0005Achm patching of existing roadway (415011)TON100$199.25$245.00$279.54$350.00
0006Maintenance of traffic (603009)LS1$28,296$30,000$11,357$5,300.00
0007Signs (604003)SF240$6.00$6.00$6.00$10.00
0008Mobilization (unit bid amount may not exceed 5% of subtotal) (601001)LS1$10,879$10,471$14,000$6,000.00
ARDOT contract SA2044: unit prices by line

The pay item list has one row per line (item, description, unit, quantity, the low bidder's unit price), the flat layout estimating software imports. Pay items with a page of their own open their price history.

Source

Read from ARDOT's tabulation for this contract. ARDOT monthly bid tab PDFs (morning and afternoon sessions), January 2022 to November 2026. Base bids are printed in whole dollars; on A+B and A+C jobs the base bid is kept, and the published rank follows the award amount.

Every contract let that day: ARDOT letting of April 9, 2025. Compiled by Mirage Metrics.

Your own bid history, read the same way

Mirage deploys AI agents for heavy civil estimating teams: quantities from the plan set, specs and addenda read, and bid tabs compared, inside your systems and your rules.

We use your email to reply to you and, now and then, to tell you about Mirage. You can opt out at any time. Privacy policy