Redstone Const. Group, Inc.: ARDOT bid record

Redstone Const. Group, Inc. submitted 41 bids on Arkansas DOT contracts in the data, from 12 JAN 2022 to 18 SEP 2024, and was the low bidder on 29 of them (71%). When it was not low, its total sat a median +17% above the low bid.

Owner
Arkansas DOT
Low bid volume
$233,384,229
Latest bid
18 SEP 2024
Data through
04 NOV 2026
41Bids
29Low bids
71Win rate, percent
+17%Median gap to the low bid when not low, 12 bids

By year

YearBidsLow bidsWin rate
2022121083%
2023151067%
202414964%
Redstone Const. Group, Inc., ARDOT: bids and low bids by year of letting

By county

CountyBidsLow bidsWin rate
Pulaski8675%
Clark6583%
Hempstead6350%
Pulaski, Saline4250%
Hot Spring22100%
Hempstead, Pike2150%
Jefferson22100%
Saline11100%
Hempstead, Nevada11100%
Pike11100%
Lonoke, Prairie11100%
Faulkner, Pulaski100%
Redstone Const. Group, Inc., ARDOT: bids and low bids by county

Pay items where it is most often lowest

Pay itemCodeUnitLines bidLowest on the lineIts median priceAll bidders' median
Cold milling asphalt pavement412002SY2216 (73%)$5.78$8.00
Mineral aggregate in achm surface course (1/2")407162TON2415 (63%)$126.88$124.55
Signs604003SF2814 (50%)$6.00$8.40
Construction pavement markings604041LF2113 (62%)$0.29$0.28
Asphalt binder (PG 64-22) in achm surface course (1/2") (minimum bid $120.00)407432TON1613 (81%)$120.00$120.00
Thermoplastic pavement marking yellow (6")719102LF158 (53%)$0.78$0.85
Thermoplastic pavement marking white (6")719002LF158 (53%)$0.81$0.90
Aggregate base course (class 7)303117TON148 (57%)$82.88$52.19
Raised pavement markers (type II)721002EACH227 (32%)$5.27$6.50
Water620030MGAL97 (78%)$10.00$10.00
Seeding620011ACRE97 (78%)$1,500.00$1,500.00
Achm patching of existing roadway415011TON246 (25%)$381.69$250.00
Redstone Const. Group, Inc., ARDOT: pay items where its unit price was the lowest on the line

A line counts when the firm priced it and at least one other bidder did too; the lowest unit price on the line counts whoever won the contract. Token prices and bids over three times the low bid are left out.

Who it meets most

Redstone Const. Group, Inc., ARDOT: the firms on the same contracts most often

Latest bids

LetContractCountyProjectRankIts bidAgainst the low bid
18 SEP 2024030595HempsteadTHE PURPOSE OF THIS PROJECT IS TO REMOVE TWO DAMAGED BRIDGES AND CONSTRUCT TWO RC BOX CULVERTS ON HIGHWAY 195 IN HEMPSTEAD COUNTY. THIS PROJ2 of 2$4,290,681+1.0%
18 SEP 2024030596HempsteadTHE PURPOSE OF THIS PROJECT IS TO REMOVE TEMPORARY CULVERTS AND CONSTRUCT TWO DOUBLE BOX CULVERTS ON HIGHWAY 371 IN HEMPSTEAD COUNTY. THIS P2 of 2$4,183,179+22%
31 JUL 2024061855GarlandTHE PURPOSE OF THIS PROJECT IS TO REPAIR EROSION ALONG HIGHWAY 5 IN GARLAND COUNTY. THIS PROJECT CONSISTS OF CLEARING AND GRUBBING, REMOVAL 2 of 2$2,488,642+99%
26 JUN 2024SA6056PulaskiTHE PURPOSE OF THIS PROJECT IS TO OVERLAY APPROXIMATELY 1.52 MILES OF COUNTY ROAD 27 IN PULASKI COUNTY. THIS PROJECT CONSISTS OF AGGREGATE B2 of 3$392,191+7.0%
22 MAY 2024A30033NevadaTHE PURPOSE OF THIS PROJECT IS TO MILL AND OVERLAY APPROXIMATELY 8.445 MILES OF HIGHWAY 19 IN NEVADA COUNTY. THIS PROJECT CONSISTS OF REMOVA1 of 2$4,649,519Low, 32% under the second
22 MAY 2024A60047PulaskiTHE PURPOSE OF THIS PROJECT IS TO MILL AND OVERLAY APPROXIMATELY 4.070 MILES OF HIGHWAY 10 IN PULASKI COUNTY. THIS PROJECT CONSISTS OF ACHM 1 of 2$2,280,638Low, 50% under the second
22 MAY 2024SA1066ClarkTHE PURPOSE OF THIS PROJECT IS TO OVERLAY APPROXIMATELY 1.97 MILES OF COUNTY ROAD 36 IN CLARK COUNTY. THIS PROJECT CONSISTS OF AGGREGATE BAS1 of 1$535,530Low
22 MAY 2024SA3549JeffersonTHE PURPOSE OF THIS PROJECT IS TO OVERLAY APPROXIMATELY 1.90 MILES OF COUNTY ROAD 117 IN JEFFERSON COUNTY. THIS PROJECT CONSISTS OF AGGREGAT1 of 2$527,386Low, 12% under the second
10 APR 2024A30032MillerTHE PURPOSE OF THIS PROJECT IS TO PLACE ULTRATHIN BONDED WEARING COURSE ON APPROXIMATELY 3.947 MILES OF HIGHWAY 196 IN MILLER COUNTY. THIS P1 of 1$1,159,037Low
10 APR 2024A70017ClarkTHE PURPOSE OF THIS PROJECT IS TO APPLY AN ULTRATHIN BONDED WEARING COURSE TO APPROXIMATELY 3.367 MILES OF HIGHWAY 7 IN CLARK COUNTY. THIS P1 of 2$921,256Low, 13% under the second
28 FEB 2024A60037LonokeTHE PURPOSE OF THIS PROJECT IS TO LEVEL AND OVERLAY APPROXIMATELY 12.215 MILES OF HIGHWAY 381 IN LONOKE COUNTY. THIS PROJECT CONSISTS OF ACH2 of 4$3,968,198+6.0%
17 JAN 2024A30025Hempstead, HowardTHE PURPOSE OF THIS PROJECT IS TO OVERLAY APPROXIMATELY 17.454 MILES OF HIGHWAY 355 IN HEMPSTEAD AND HOWARD COUNTIES. THIS PROJECT CONSISTS 1 of 1$15,890,515Low
17 JAN 2024061820PulaskiTHE PURPOSE OF THIS PROJECT IS TO MILL AND OVERLAY APPROXIMATELY 2.787 MILES OF I-30 AND I-630 IN PULASKI COUNTY. THIS PROJECT CONSISTS OF A1 of 1$14,696,211Low
17 JAN 2024A60041PulaskiTHE PURPOSE OF THIS PROJECT IS TO MILL AND OVERLAY WITH ACHM SURFACE COURSE (SELECT SECTIONS) ON APPROXIMATELY 0.861 MILE OF HIGHWAY 107 IN 1 of 2$752,331Low, 26% under the second
01 NOV 2023A30030Hempstead, MillerTHE PURPOSE OF THIS PROJECT IS TO MILL AND OVERLAY APPROXIMATELY 2.01 MILES OF HIGHWAY 67 IN MILLER COUNTY AND 0.04 MILES OF HIGHWAY 67 IN H1 of 2$1,468,311Low, 30% under the second
16 AUG 2023020626JeffersonTHE PURPOSE OF THIS PROJECT IS TO WIDEN APPROXIMATELY 4.759 MILES OF HIGHWAYS 270 AND 365S IN JEFFERSON COUNTY. THIS PROJECT CONSISTS OF CLE1 of 3$45,217,968Low, 0.0% under the second
16 AUG 2023061646Pulaski, SalineTHE PURPOSE OF THIS PROJECT IS TO MILL AND OVERLAY APPROXIMATELY 42.297 MILES OF INTERSTATE 30 FRONTAGE ROADS AND RAMPS, HYDRODEMOLITION ON 2 of 2$33,647,096+41%
16 AUG 2023061760Hot SpringTHE PURPOSE OF THIS PROJECT IS TO MILL AND OVERLAY APPROXIMATELY 4.107 MILES OF INTERSTATE 30 IN HOT SPRING COUNTY. THIS PROJECT CONSISTS OF1 of 2$5,710,467Low, 2.0% under the second
17 MAY 2023A30018Hempstead, PikeTHE PURPOSE OF THIS PROJECT IS TO RUT MILL AND OVERLAY WITH ACHM SURFACE COURSE APPROXIMATELY 4.154 MILES IN HEMPSTEAD COUNTY AND 6.299 MILE2 of 2$6,948,070+25%
12 APR 2023A30024HempsteadTHE PURPOSE OF THIS PROJECT IS TO OVERLAY WITH SURFACE COURSE APPROXIMATELY 4.690 MILES AND MILL AND OVERLAY WITH ACHM SURFACE COURSE APPROX1 of 2$4,528,583Low, 17% under the second
12 APR 2023A60022PulaskiTHE PURPOSE OF THIS PROJECT IS TO LEVEL WITH ACHM SURFACE COURSE AND APPLY AN ULTRATHIN BONDED WEARING COURSE ON APPROXIMATELY 3.588 MILES O1 of 2$2,356,677Low, 6.0% under the second
01 MAR 2023061766PulaskiTHE PURPOSE OF THIS PROJECT IS TO PATCH AND OVERLAY APPROXIMATELY 1.50 MILES OF INTERSTATE 40 IN PULASKI COUNTY. THIS PROJECT CONSISTS OF AG1 of 1$5,250,586Low
01 MAR 2023A60029Pulaski, SalineTHE PURPOSE OF THIS PROJECT IS TO MILL AND INLAY WITH ACHM SURFACE COURSE ON APPROXIMATELY 13.371 MILES OF HIGHWAY 367 IN PULASKI AND SALINE1 of 2$4,402,150Low, 6.0% under the second
01 MAR 2023A70019ClarkTHE PURPOSE OF THIS PROJECT IS TO MILL AND OVERLAY WITH ACHM SURFACE COURSE ON APPROXIMATELY 0.793 MILE OF HIGHWAY 51 IN CLARK COUNTY AT ARK2 of 2$733,205+1.0%
01 MAR 2023C76072Pulaski, SalineTHE PURPOSE OF THIS PROJECT IS TO OVERLAY APPROXIMATELY 0.20 MILE OF VARIOUS CITY STREETS IN THE CITY OF ALEXANDER IN PULASKI COUNTY AND OVE2 of 2$423,847+11%
Redstone Const. Group, Inc.: latest ARDOT bids in the data

How this record was read

ARDOT monthly bid tab PDFs (morning and afternoon sessions), January 2022 to November 2026. Base bids are printed in whole dollars; on A+B and A+C jobs the base bid is kept, and the published rank follows the award amount.

  • Every bid counted here matched its published total to within one dollar; ARDOT's rank decides who was low.
  • The gap to the low bid is the firm's total over the low total, minus one, on contracts it did not win, leaving out bids over three times the low bid.
  • A record covers the lettings in the data, not every contract the firm ever bid. Coverage by year is on the state page.

A name split in two, or a figure that does not match the owner's tabulation? Write to mehdi@miragemetrics.com and we correct it.

Your own bid history, read the same way

Mirage deploys AI agents for heavy civil estimating teams: quantities from the plan set, specs and addenda read, and bid tabs compared, inside your systems and your rules.

We use your email to reply to you and, now and then, to tell you about Mirage. You can opt out at any time. Privacy policy