ARDOT letting results, March 1, 2023
69 contracts let by Arkansas DOT on March 1, 2023, $205,874,198 in low bids, a median of 2 bidders per contract.
- Owner
- Arkansas DOT
- Contracts
- 69
- Low bids, total
- $205,874,198
- Data through
- 04 NOV 2026
Contracts let that day
| Contract | Project | County | Bids | Low bidder | Low bid | Second bid | Gap | Source |
|---|---|---|---|---|---|---|---|---|
| A40024 | THE PURPOSE OF THIS PROJECT IS TO LEVEL AND OVERLAY WITH ACHM SURFACE COURSE ON APPROXIMATELY 18.225 MILES; APPLY AN ASPHALT SURFACE TREATMENT AND OVERLAY WITH | Polk, Scott | 2 | Blackstone Construction, LLC | $22,136,574 | $31,989,528 | +45% | ARDOT |
| 012442 | THE PURPOSE OF THIS PROJECT IS TO REHABILITATE TWENTY BRIDGES IN VARIOUS COUNTIES. THIS PROJECT CONSISTS OF HYDRODEMOLITION, LATEX MODIFIED CONCRETE OVERLAY, AC | Various | 2 | Ivs Hydro, Inc. | $13,291,784 | $15,943,896 | +20% | ARDOT |
| A20004 | THE PURPOSE OF THIS PROJECT IS TO PRESERVE THE EXISTING ROADWAY AND TO PROVIDE A NEW WEARING COURSE ON APPROXIMATELY 12.971 MILES OF HIGHWAY 65 IN DESHA AND DRE | Desha, Drew | 1 | Pine Bluff Sand & Gravel Co. | $12,152,950 | ARDOT | ||
| A30013 | THE PURPOSE OF THIS PROJECT IS TO MILL RUTTED AREAS, LEVEL, AND OVERLAY WITH ACHM SURFACE COURSE ON APPROXIMATELY 6.927 MILES OF HIGHWAY 108 AND APPROXIMAELY 4. | Miller | 1 | R. K. Hall, LLC | $10,298,696 | ARDOT | ||
| A20022 | THE PURPOSE OF THIS PROJECT IS TO MILL AND OVERLAY WITH ACHM SURFACE COURSE SELECT SECTIONS OF GRASS MEDIAN DIVIDED HIGHWAY 65 AND AT-GRADE MEDIAN CROSSOVERS FO | Chicot | 2 | Pine Bluff Sand & Gravel Co. | $9,849,332 | $10,336,901 | +5.0% | ARDOT |
| 040898 | THE PURPOSE OF THIS PROJECT IS TO PERFORM HYDRODEMOLITION AND JOINT REPAIR ON A BRIDGE STRUCTURE ON HIGHWAY 64 IN SEBASTIAN COUNTY. THIS PROJECT CONSISTS OF REM | Sebastian | 1 | American Contrg. & SVS., Inc. | $7,661,499 | ARDOT | ||
| A10010 | THE PURPOSE OF THIS PROJECT IS TO MILL AND INLAY APPROXIMATELY 7.959 MILES OF HIGHWAY 1B IN ST. FRANCIS COUNTY. THIS PROJECT CONSISTS OF EARTHWORK, AGGREGATE BA | St. Francis | 1 | Apac-Tennessee, Inc. | $7,655,332 | ARDOT | ||
| A20020 | THE PURPOSE OF THIS PROJECT IS TO MILL AND OVERLAY WITH ACHM SURFACE COURSE ON APPROXIMATELY 13.820 MILES OF HIGHWAY 165 AND LEVEL WITH ACHM SURFACE COURSE AND | Arkansas | 1 | Pine Bluff Sand & Gravel Co. | $7,521,395 | ARDOT | ||
| A10023 | THE PUROSE OF THIS PROJECT IS TO OVERLAY WITH ACHM SURFACE COURSE ON APPROXIMATELY 5.862 MILES AND FOG SEAL ON APPROXIMATELY 5.268 MILES FOR AN APPROXIMATE PROJ | Crittenden | 1 | Apac-Tennessee, Inc. | $7,154,475 | ARDOT | ||
| A70020 | THE PURPOSE OF THIS PROJECT IS TO LEVEL WITH ACHM SURFACE COURSE AND APPLY AN ULTRATHIN BONDED WEARING COURSE ON APPROXIMATELY 12.826 MILES OF HIGHWAY 63 IN BRA | Bradley | 1 | Jet Asphalt & Rock Co., Inc. | $7,035,200 | ARDOT | ||
| A10013 | THE PURPOSE OF THIS PROJECT IS TO MILL AND OVERLAY/INLAY APPROXIMATELY 7.64 MILES OF HIGHWAYS 70 & 77 AT MARION & WEST MEMPHIS IN CRITTENDEN COUNTY. THIS PROJEC | Crittenden | 1 | Apac-Tennessee, Inc. | $6,778,773 | ARDOT | ||
| A30023 | THE PURPOSE OF THIS PROJECT IS TO COLD MILL AND OVERLAY WITH ACHM SURFACE COURSE ON APPROXIMATELY 1.646 MILES: RUT MILL AND OVERLAY WITH ACHM SURFACE COURSE ON | Sevier | 1 | R. K. Hall, LLC | $6,310,835 | ARDOT | ||
| A50020 | THE PURPOSE OF THIS PROJECT IS TO LEVEL AND OVERLAY WITH ACHM SURFACE COURSE APPROXIMATELY 20.278 MILES AND CONSTRUCT 2'-0" SHOULDERS ON APPROXIMATELY 19.809 MI | Jackson | 2 | Atlas Asphalt, Inc. | $6,215,448 | $6,481,725 | +4.0% | ARDOT |
| A90018 | THE PURPOSE OF THIS PROJECT IS TO MILL AND OVERLAY WITH ACHM SURFACE COURSE ON APPROXIMATELY 0.131 MILE AND RETAIN AND OVERLAY APPROXIMATELY 14.569 MILES OF HIG | Newton | 2 | Apac-Central, Inc. | $6,101,234 | $7,449,392 | +22% | ARDOT |
| 061766 | THE PURPOSE OF THIS PROJECT IS TO PATCH AND OVERLAY APPROXIMATELY 1.50 MILES OF INTERSTATE 40 IN PULASKI COUNTY. THIS PROJECT CONSISTS OF AGGREGATE BASE COURSE, | Pulaski | 1 | Redstone Const. Group, Inc. | $5,250,586 | ARDOT | ||
| A30014 | THE PURPOSE OF THIS PROJECT IS TO OVERLAY APPROXIMATELY 7.282 MILES OF ROADWAY, AND ADD 2' SHOULDERS WITH RUMBLE STRIPES TO APPROXIMATELY 4.21 MILES OF HIGHWAY | Miller | 1 | R. K. Hall, LLC | $5,021,969 | ARDOT | ||
| A60021 | THE PURPOSE OF THIS PROJECT IS TO MILL AND OVERLAY WITH ACHM SURFACE COURSE ON APPROXIMATELY 0.360 MILE OF HIGHWAY 7; APPROXIMATELY 4.175 MILES OF HIGHWAY 70B, | Garland | 1 | Cranford Construction Co. | $4,628,449 | ARDOT | ||
| A00041 | THE PURPOSE OF THIS PROJECT IS TO LEVEL WITH ACHM SURFACE COURSE AND APPLY AN ULTRATHIN BONDED WEARING COURSE ON APPROXIMATELY 10.903 MILES OF SELECT SECTIONS O | Greene | 1 | Delta Asphalt of Ark., Inc. | $4,515,338 | ARDOT | ||
| A60029 | THE PURPOSE OF THIS PROJECT IS TO MILL AND INLAY WITH ACHM SURFACE COURSE ON APPROXIMATELY 13.371 MILES OF HIGHWAY 367 IN PULASKI AND SALINE COUNTIES. THIS PROJ | Pulaski, Saline | 2 | Redstone Const. Group, Inc. | $4,402,150 | $4,677,403 | +6.0% | ARDOT |
| 012439 | THE PURPOSE OF THIS PROJECT IS TO UPGRADE THE SIGNS ALONG INTERSTATE 30 IN MILLER, HEMPSTEAD, NEVADA, AND CLARK COUNTIES. THIS PROJECT CONSISTS OF EARTHWORK, AG | Various | 1 | Creative Design Concepts, Inc. | $3,835,888 | ARDOT | ||
| A80024 | THE PURPOSE OF THIS PROJECT IS TO WIDEN FROM 2 LANES TO THREE LANES WITH 6'-0" SHOULDERS AND OVERLAY WITH ACHM SURFACE COURSE APPROXIMATELY 0.048 MILE AND RETAI | Faulkner | 2 | Rogers Group, Inc. | $3,725,438 | $5,890,276 | +58% | ARDOT |
| 090549 | THE PURPOSE OF THIS PROJECT IS TO REPLACE A SINGLE BRIDGE STRUCTURE ON HIGHWAY 187 IN CARROLL COUNTY. THIS PROJECT CONSISTS OF CLEARING AND GRUBBING, REMOVAL AN | Carroll | 2 | West Plains BR. & Grading, LLC | $3,600,000 | $5,302,048 | +47% | ARDOT |
| 100985 | THE PURPOSE OF THIS PROJECT IS TO REPLACE THREE STRUCTURES ON HIGHWAYS 135 AND 139 IN CRAIGHEAD COUNTY. THIS PROJECT CONSISTS OF CLEARING AND GRUBBING, REMOVAL | Craighead | 3 | Robertson Contractors, Inc. | $3,268,901 | $3,996,999 | +22% | ARDOT |
| A70022 | THE PURPOSE OF THIS PROJECT IS TO MILL AND OVERLAY WITH ACHM SURFACE COURSE APPROXIMATELY 0.014 MILES OF HIGHWAY 98 AND APPROXIMATELY 0.614 MILES OF HIGHWAY 371 | Columbia | 1 | Jet Asphalt & Rock Co., Inc. | $3,223,164 | ARDOT | ||
| A30020 | THE PURPOSE OF THIS PROJECT IS TO RUT MILL AND OVERLAY WITH ACHM SURFACE COURSE ON APPROXIMATELY 4.111 MILES OF HIGHWAY 71 IN LITTLE RIVER COUNTY. THIS PROJECT | Little River | 1 | R. K. Hall, LLC | $3,005,356 | ARDOT | ||
| A10022 | THE PURPOSE OF THIS PROJECT IS TO LEVEL AND OVERLAY WITH ACHM SURFACE COURSE ON APPROXIMATELY 3.693 MILES OF HIGHWAY 49 IN MONROE COUNTY. THIS PROJECT CONSISTS | Monroe | 1 | Atlas Asphalt, Inc. | $2,391,501 | ARDOT | ||
| A50023 | THE PURPOSE OF THIS PROJECT IS TO COLD MILL APPROXIMATELY 0.030 MILES, TO CONSTRUCT 2'-0" SHOULDERS ON 5.213 MILES, AND OVERLAY WITH ACHM SURFACE COURSE APPROXI | Jackson | 3 | Atlas Asphalt, Inc. | $2,383,618 | $2,603,136 | +9.0% | ARDOT |
| 012445 | THE PURPOSE OF THIS PROJECT IS TO POLYMER OVERLAY THIRTY-SEVEN BRIDGES IN VARIOUS COUNTIES. THIS PROJECT CONSISITS OF JOINT REHABILITATION, SILICONE JOINT SEALA | Various | 3 | The Truesdell Corporation | $2,369,369 | $3,985,906 | +68% | ARDOT |
| A80025 | THE PURPOSE OF THIS PROJECT IS TO MILL AND OVERLAY WITH ACHM SURFACE COURSE APPROXIMATELY 0.599 MILE AND LEVEL AND OVERLAY WITH ACHM SURFACE COURSE APPROXIMATEL | Pope | 2 | Blackstone Construction, LLC | $2,248,138 | $2,438,578 | +8.0% | ARDOT |
| 080609 | THE PURPOSE OF THIS PROJECT IS TO REPLACE ONE STRUCTURE WITH A R.C. BOX CULVERT ON HIGHWAY 9 IN PERRY COUNTY. THIS PROJECT CONSISTS OF CLEARING AND GRUBBING, EA | Perry | 3 | Central Arkansas Contractors, Inc. | $2,082,391 | $2,102,875 | +1.0% | ARDOT |
| A00040 | THE PURPOSE OF THIS PROJECT IS TO MILL AND OVERLAY APPROXIMATELY 1.394 MILES OF HIGHWAY 18 IN MISSISSIPPI COUNTY AT BLYTHEVILLE. THIS PROJECT CONSIST OF REMOVAL | Mississippi | 1 | Delta Asphalt of Ark., Inc. | $1,460,205 | ARDOT | ||
| 040782 | THE PURPOSE OF THIS PROJECT IS TO REPLACE ONE STRUCTURE ON HIGHWAY 80 IN SCOTT COUNTY. THIS PROJECT CONSISTS OF CLEARING AND GRUBBING, REMOVAL AND DISPOSAL ITEM | Scott | 1 | Kesser International, Inc. | $1,152,008 | ARDOT | ||
| C76075 | THE PURPOSE OF THIS PROJECT IS TO OVERLAY APPROXIMATELY 1.64 MILES OF VARIOUS CITY STREETS IN THE CITY OF DEVALLS BLUFF, APPROXIMATELY 1.94 MILES OF VARIOUS CIT | Lonoke, Prairie | 2 | Rogers Group, Inc. | $1,048,150 | $1,175,912 | +12% | ARDOT |
| SA2377 | THE PURPOSE OF THIS PROJECT IS TO OVERLAY APPROXIMATELY 5.27 MILES OF VARIOUS COUNTY ROADS IN FAULKNER COUNTY. THIS PROJECT CONSISTS OF TRENCHING AND SHOULDER P | Faulkner | 2 | Rogers Group, Inc. | $1,026,549 | $1,109,481 | +8.0% | ARDOT |
| A60028 | THE PURPOSE OF THIS PROJECT IS TO CONSTRUCT A 2'-0" SHOULDER ON THE RIGHT AND LEFT, LEVEL THE EXISTING ROADWAY, AND OVERLAY WITH ACHM SURFACE COURSE APPROXIMATE | Lonoke | 2 | Rogers Group, Inc. | $979,975 | $1,062,544 | +8.0% | ARDOT |
| SA3054 | THE PURPOSE OF THIS PROJECT IS TO LEVEL AND RESEAL APPROXIMATELY 11.18 MILES OF COUNTY ROADS 1, 2 AND 3 IN HOT SPRING COUNTY. THIS PROJECT CONSISTS OF ASPHALT S | Hot Spring | 1 | Salt Creek Paving & Const. Co., Inc. | $808,031 | ARDOT | ||
| C09007 | THE PURPOSE OF THIS PROJECT IS TO OVERLAY APPROXIMATELY 2.45 MILES OF VARIOUS CITY STREETS IN THE CITY OF LAKE VILLAGE IN CHICOT COUNTY. THIS PROJECT CONSISTS O | Chicot | 1 | Pine Bluff Sand & Gravel Co. | $785,888 | ARDOT | ||
| A70019 | THE PURPOSE OF THIS PROJECT IS TO MILL AND OVERLAY WITH ACHM SURFACE COURSE ON APPROXIMATELY 0.793 MILE OF HIGHWAY 51 IN CLARK COUNTY AT ARKADELPHIA. THIS PROJE | Clark | 2 | Cranford Construction Co. | $728,823 | $733,205 | +1.0% | ARDOT |
| C76077 | THE PURPOSE OF THIS PROJECT IS TO OVERLAY APPROXIMATELY 1.57 MILES OF VARIOUS CITY STREETS IN THE CITY OF MONETTE IN CRAIGHEAD COUNTY AND APPROXIMATELY 1.29 MIL | Craighead, Mississippi | 4 | Michelle'S Excavating, Inc. | $648,584 | $655,836 | +1.0% | ARDOT |
| C58007 | THE PURPOSE OF THIS PROJECT IS TO OVERLAY APPROXIMATELY 0.75 MILE OF E. PARKWAY DRIVE IN THE CITY OF RUSSELLVILLE IN POPE COUNTY. THIS PROJECT CONSISTS OF ACHM | Pope | 1 | Blackstone Construction, LLC | $634,568 | ARDOT | ||
| C76076 | THE PURPOSE OF THIS PROJECT IS TO OVERLAY APPROXIMATELY 0.94 MILE OF VARIOUS CITY STREETS IN THE CITY OF TILLAR IN DREW COUNTY AND OVERLAY APPROXIMATELY 1.51 MI | Desha, Drew | 1 | Pine Bluff Sand & Gravel Co. | $614,218 | ARDOT | ||
| C01010 | THE PURPOSE OF THIS PROJECT IS TO OVERLAY APPROXIMATELY 1.48 MILES OF VARIOUS CITY STREETS IN THE CITY OF DEWITT IN ARKANSAS COUNTY. THIS PROJECT CONSISTS OF AG | Arkansas | 2 | Kesser International, Inc. | $567,359 | $608,639 | +7.0% | ARDOT |
| C04019 | THE PURPOSE OF THIS PROJECT IS TO OVERLAY APPROXIMATELY 2.48 MILES OF LITTLE FLOCK DR. IN THE CITY OF LITTLE FLOCK IN BENTON COUNTY. THIS PROJECT CONSISTS OF AG | Benton | 3 | Emery Sapp & Sons, Inc. | $496,438 | $564,974 | +14% | ARDOT |
| C62012 | THE PURPOSE OF THIS PROJECT IS TO OVERLAY APPROXIMATELY 1.38 MILES OF VARIOUS CITY STREETS IN THE CITY OF BENTON IN SALINE COUNTY. THIS PROJECT CONSISTS OF ACHM | Saline | 1 | Cranford Construction Co. | $479,246 | ARDOT | ||
| C72014 | THE PURPOSE OF THIS PROJECT IS TO OVERLAY APPROXIMATELY 1.39 MILES OF VARIOUS CITY STREETS IN THE CITY OF JOHNSON IN WASHINGTON COUNTY. THIS PROJECT CONSISTS OF | Washington | 3 | Apac-Central, Inc. | $426,372 | $457,508 | +7.0% | ARDOT |
| C63002 | THE PURPOSE OF THIS PROJECT IS TO OVERLAY APPROXIMATELY 0.94 MILE OF VARIOUS CITY STREETS IN THE CITY OF WALDRON IN SCOTT COUNTY. THIS PROJECT CONSISTS OF SCARI | Scott | 2 | Forsgren, Inc. | $404,845 | $512,893 | +27% | ARDOT |
| C33009 | THE PURPOSE OF THIS PROJECT IS TO SURFACE APPROXIMATELY 1.72 MILES OF VARIOUS CITY STREETS IN THE CITY OF MOUNT PLEASANT IN IZARD COUNTY. THIS PROJECT CONSISTS | Izard | 1 | Atlas Asphalt, Inc. | $403,393 | ARDOT | ||
| C02013 | THE PURPOSE OF THIS PROJECT IS TO OVERLAY APPROXIMATELY 1.82 MILES OF VARIOUS CITY STREETS IN THE CITY OF PORTLAND IN ASHLEY COUNTY. THIS PROJECT CONSISTS OF AC | Ashley | 1 | Pine Bluff Sand & Gravel Co. | $400,375 | ARDOT | ||
| C47013 | THE PURPOSE OF THIS PROJECT IS TO OVERLAY APPROXIMATELY 0.52 MILE OF HALE AVENUE IN THE CITY OF OSCEOLA IN MISSISSIPPI COUNTY. THIS PROJECT CONSISTS OF REMOVAL | Mississippi | 2 | Sugg Construction, Inc. | $395,894 | $405,216 | +2.0% | ARDOT |
| C02012 | THE PURPOSE OF THIS PROJECT IS TO OVERLAY APPROXIMATELY 0.98 MILE OF W. 3RD. AVE. AND E. 9TH AVE. IN THE CITY OF CROSSETT IN ASHLEY COUNTY. THIS PROJECT CONSIST | Ashley | 2 | Pine Bluff Sand & Gravel Co. | $382,082 | $460,138 | +20% | ARDOT |
| C76072 | THE PURPOSE OF THIS PROJECT IS TO OVERLAY APPROXIMATELY 0.20 MILE OF VARIOUS CITY STREETS IN THE CITY OF ALEXANDER IN PULASKI COUNTY AND OVERLAY APPROXIMATELY 1 | Pulaski, Saline | 2 | Cranford Construction Co. | $380,526 | $423,847 | +11% | ARDOT |
| C43010 | THE PURPOSE OF THIS PROJECT IS TO OVERLAY APPROXIMATELY 1.76 MILES OF VARIOUS CITY STREETS IN THE CITY OF ENGLAND IN LONOKE COUNTY. THIS PROJECT CONSISTS OF ACH | Lonoke | 2 | Rogers Group, Inc. | $372,501 | $451,091 | +21% | ARDOT |
| C65015 | THE PURPOSE OF THIS PROJECT IS TO OVERLAY APPROXIMATELY 1.48 MILES OF VARIOUS CITY STREETS IN THE CITY OF MANSFIELD IN SEBASTIAN COUNTY. THIS PROJECT CONSISTS O | Sebastian | 2 | Emery Sapp & Sons, Inc. | $360,893 | $407,686 | +13% | ARDOT |
| SA7539 | THE PURPOSE OF THIS PROJECT IS TO LEVEL AND SEAL APPROXIMATELY 4.36 MILES OF CO. RDS. 38 AND 40 IN YELL COUNTY. THIS PROJECT CONSISTS OF ASPHALT SURFACE TREATME | Yell | 2 | Salt Creek Paving & Const. Co., Inc. | $347,371 | $354,371 | +2.0% | ARDOT |
| C05009 | THE PURPOSE OF THIS PROJECT IS TO OVERLAY APPROXIMATELY 1.68 MILES OF VARIOUS CITY STREETS IN THE CITY OF BERGMAN IN BOONE COUNTY. THIS PROJECT CONSISTS OF BORR | Boone | 1 | Apac-Central, Inc. | $347,086 | ARDOT | ||
| C16012 | THE PURPOSE OF THIS PROJECT IS TO OVERLAY APPROXIMATELY 1.51 MILES OF VARIOUS CITY STREETS IN THE CITY OF BONO IN CRAIGHEAD COUNTY. THIS PROJECT CONSISTS OF AGG | Craighead | 4 | Michelle'S Excavating, Inc. | $343,789 | $345,899 | +1.0% | ARDOT |
| C38012 | THE PURPOSE OF THIS PROJECT IS TO OVERLAY APPROXIMATELY 2.05 MILES OF VARIOUS CITY STREETS IN THE CITY OF RAVENDEN IN LAWRENCE COUNTY. THIS PROJECT CONSISTS OF | Lawrence | 2 | Atlas Asphalt, Inc. | $337,437 | $354,533 | +5.0% | ARDOT |
| C73014 | THE PURPOSE OF THIS PROJECT IS TO OVERLAY APPROXIMATELY 2.28 MILES OF VARIOUS CITY STREETS IN THE CITY OF PANGBURN IN WHITE COUNTY. THIS PROJECT CONSISTS OF AGG | White | 3 | CK Asphalt, LLC | $322,747 | $427,972 | +33% | ARDOT |
| C08010 | THE PURPOSE OF THIS PROJECT IS TO OVERLAY APPROXIMATELY 1.44 MILES OF VARIOUS CITY STREETS IN THE CITY OF OAK GROVE IN CARROLL COUNTY. THIS PROJECT CONSISTS OF | Carroll | 1 | Apac-Central, Inc. | $316,360 | ARDOT | ||
| C52008 | THE PURPOSE OF THIS PROJECT IS TO OVERLAY APPROXIMATELY 1.12 MILES OF VARIOUS CITY STREETS IN THE CITY OF STEPHENS IN OUACHITA COUNTY. THIS PROJECT CONSISTS OF | Ouachita | 1 | Smackover Paving Co. | $312,598 | ARDOT | ||
| C48005 | THE PURPOSE OF THIS PROJECT IS TO OVERLAY APPROXIMATELY 0.70 MILE AND SURFACE 0.22 MILE OF VARIOUS CITY STREETS IN THE CITY OF HOLLY GROVE IN MONROE COUNTY. THI | Monroe | 3 | M & T Paving & Const. Co., Inc. | $307,555 | $316,808 | +3.0% | ARDOT |
| C02011 | THE PURPOSE OF THIS PROJECT IS TO OVERLAY AND SURFACE APPROXIMATELY 1.33 MILES OF VARIOUS CITY STREETS IN THE CITY OF MONTROSE IN ASHLEY COUNTY. THIS PROJECT CO | Ashley | 1 | Pine Bluff Sand & Gravel Co. | $304,077 | ARDOT | ||
| C68008 | THE PURPOSE OF THIS PROJECT IS TO SURFACE APPROXIMATELY 0.68 MILE OF VARIOUS CITY STREETS IN THE CITY OF WHEATLEY IN ST. FRANCIS COUNTY. THIS PROJECT CONSISTS O | St. Francis | 3 | Delta Asphalt of Ark., Inc. | $296,358 | $298,124 | +1.0% | ARDOT |
| C08009 | THE PURPOSE OF THIS PROJECT IS TO OVERLAY APPROXIMATELY 1.52 MILES OF VARIOUS CITY STREETS IN THE CITY OF EUREKA SPRINGS IN CARROLL COUNTY. THIS PROJECT CONSIST | Carroll | 1 | Emery Sapp & Sons, Inc. | $294,500 | ARDOT | ||
| C61007 | THE PURPOSE OF THIS PROJECT IS TO OVERLAY APPROXIMATELY 1.87 MILES OF VARIOUS CITY STREETS IN THE CITY OF REYNO IN RANDOLPH COUNTY. THIS PROJECT CONSISTS OF ACH | Randolph | 4 | Atlas Asphalt, Inc. | $294,315 | $302,138 | +3.0% | ARDOT |
| C45006 | THE PURPOSE OF THIS PROJECT IS TO SURFACE APPROXIMATELY 1.23 MILES OF VARIOUS CITY STREETS IN THE CITY OF SUMMIT IN MARION COUNTY. THIS PROJECT CONSISTS OF AGGR | Marion | 2 | Apac-Central, Inc. | $269,014 | $272,931 | +1.0% | ARDOT |
| C47019 | THE PURPOSE OF THIS PROJECT IS TO OVERLAY APPROXIMATELY 1.00 MILE OF VARIOUS CITY STREETS IN THE CITY OF KEISER IN MISSISSIPPI COUNTY. THIS PROJECT CONSISTS OF | Mississippi | 3 | Sugg Construction, Inc. | $267,967 | $334,733 | +25% | ARDOT |
| C73015 | THE PURPOSE OF THIS PROJECT IS TO OVERLAY APPROXIMATELY 1.11 MILES OF VARIOUS CITY STREETS IN THE CITY OF HIGGINSON IN WHITE COUNTY. THIS PROJECT CONSISTS OF AC | White | 2 | CK Asphalt, LLC | $259,493 | $302,590 | +17% | ARDOT |
| C44006 | THE PURPOSE OF THIS PROJECT IS TO SURFACE APPROXIMATELY 0.60 MILE OF VARIOUS CITY STREETS IN THE CITY OF HUNSTVILLE IN MADISON COUNTY. THIS PROJECT CONSISTS OF | Madison | 3 | Apac-Central, Inc. | $180,825 | $221,568 | +23% | ARDOT |
Gap is the second bid over the low bid. Where a contract shows fewer bids than ARDOT received, the others did not match their published totals and are left out.
Your own bid history, read the same way
Mirage deploys AI agents for heavy civil estimating teams: quantities from the plan set, specs and addenda read, and bid tabs compared, inside your systems and your rules.