West Plains BR. & Grading, LLC: ARDOT bid record

West Plains BR. & Grading, LLC submitted 25 bids on Arkansas DOT contracts in the data, from 16 FEB 2022 to 04 NOV 2026, and was the low bidder on 10 of them (40%). When it was not low, its total sat a median +8.0% above the low bid.

Owner
Arkansas DOT
Low bid volume
$61,575,000
Latest bid
04 NOV 2026
Data through
04 NOV 2026
25Bids
10Low bids
40Win rate, percent
+8.0%Median gap to the low bid when not low, 15 bids

By year

YearBidsLow bidsWin rate
20228225%
20236350%
20246467%
2025300%
20262150%
West Plains BR. & Grading, LLC, ARDOT: bids and low bids by year of letting

By county

CountyBidsLow bidsWin rate
Randolph400%
White2150%
Greene200%
Fulton22100%
Boone2150%
Izard2150%
Clark100%
Craighead, Lawrence100%
Carroll11100%
Sharp11100%
Van Buren100%
Johnson11100%
West Plains BR. & Grading, LLC, ARDOT: bids and low bids by county

Pay items where it is most often lowest

Pay itemCodeUnitLines bidLowest on the lineIts median priceAll bidders' median
Water620030MGAL2323 (100%)$5.00$10.00
Temporary seeding621001ACRE2323 (100%)$750.00$805.89
Second seeding application623001ACRE2323 (100%)$325.00$395.00
Mulch cover620022ACRE2321 (91%)$1,000.00$1,150.00
Silt fence621021LF2221 (95%)$3.45$3.68
Asphalt binder (PG 64-22) in achm surface course (1/2") (minimum bid $120.00)407432TON2319 (83%)$120.00$120.00
Raised pavement markers (type II)721002EACH2219 (86%)$10.00$6.50
Achm patching of existing roadway415011TON2119 (90%)$150.00$250.00
Signs604003SF2318 (78%)$9.00$8.40
Lime620001TON2318 (78%)$95.00$105.00
Seeding620011ACRE2318 (78%)$1,345.00$1,500.00
Asphalt concrete patching for maintenance of traffic414011TON2118 (86%)$150.00$262.50
West Plains BR. & Grading, LLC, ARDOT: pay items where its unit price was the lowest on the line

A line counts when the firm priced it and at least one other bidder did too; the lowest unit price on the line counts whoever won the contract. Token prices and bids over three times the low bid are left out.

Who it meets most

FirmContracts in commonThat firm ranked ahead
Robertson Contractors, Inc.167 of 16
Mobley Contractors, Inc.112 of 11
Crouse Construction Co.53 of 5
Seagraves Construction, Inc.43 of 4
R. L. Persons Const., Inc.31 of 3
Thomco, Inc.20 of 2
Kesser International, Inc.22 of 2
Bobby Kennedy Construction Co.22 of 2
Capital Paving & Construction, LLC21 of 2
L. E. Davis Construction, Inc.21 of 2
West Plains BR. & Grading, LLC, ARDOT: the firms on the same contracts most often

Latest bids

LetContractCountyProjectRankIts bidAgainst the low bid
04 NOV 2026BR4401MadisonTHE PURPOSE OF THIS PROJECT IS TO REPLACE THE BRIDGE STRUCTURE ON 0.452 MILE OF COUNTY ROAD 7 SOUTH OF HUNTSVILLE IN MADISON COUNTY. THIS PR1 of 5$4,553,000Low, 9.0% under the second
04 MAR 2026101003RandolphTHE PURPOSE OF THIS PROJECT IS TO REPLACE ONE STRUCTURE ON HIGHWAY 90 IN RANDOLPH COUNTY. THIS PROJECT CONSISTS OF CLEARING AND GRUBBING, RE2 of 5$3,472,000+1.0%
05 NOV 2025090672SearcyTHE PURPOSE OF THIS PROJECT IS TO REALIGN HWY. 66 IN SEARCY COUNTY. THIS PROJECT CONSISTS OF CLEARING AND GRUBBING, REMOVAL AND DISPOSAL ITE3 of 6$7,995,000+25%
17 SEP 2025090647BaxterTHE PURPOSE OF THIS PROJECT IS TO REPLACE ONE STRUCTURE ON HIGHWAY 5 IN BAXTER COUNTY. THIS PROJECT CONSISTS OF REMOVAL AND DISPOSAL ITEMS, 3 of 6$2,785,000+17%
15 JAN 2025100995CraigheadTHE PURPOSE OF THIS PROJECT IS TO REPLACE TWO STRUCTURES ON HIGHWAY 91 IN CRAIGHEAD COUNTY. THIS PROJECT CONSISTS OF CLEARING AND GRUBBING, 3 of 3$6,946,000+29%
31 JUL 2024050475IzardTHE PURPOSE OF THIS PROJECT IS TO REPLACE ONE STRUCTURE ON HIGHWAY 56 IN IZARD COUNTY. THIS PROJECT CONSISTS OF CLEARING AND GRUBBING, REMOV3 of 4$2,446,000+22%
26 JUN 2024080617JohnsonTHE PURPOSE OF THIS PROJECT IS TO REPLACE ONE STRUCTURE ON HIGHWAY 215 IN JOHNSON COUNTY. THIS PROJECT CONSISTS OF CLEARING AND GRUBBING, RE1 of 1$3,732,000Low
26 JUN 2024009916MarionTHE PURPOSE OF THIS PROJECT IS TO REPLACE ONE RAILROAD OVERPASS ON HIGHWAY 14 IN THE TOWN OF SUMMIT IN MARION COUNTY. THIS PROJECT CONSISTS 1 of 1$7,888,000Low
22 MAY 2024050422FultonTHE PURPOSE OF THIS PROJECT IS TO REPLACE TWO STRUCTURES ON HIGHWAYS 62 AND 223 IN FULTON COUNTY. THIS PROJECT CONSISTS OF CLEARING AND GRUB1 of 2$8,495,000Low, 28% under the second
28 FEB 2024080614Van BurenTHE PURPOSE OF THIS PROJECT IS TO REPLACE ONE STRUCTURE WITH A BRIDGE ON HIGHWAY 16 IN CLINTON IN VAN BUREN COUNTY. THIS PROJECT CONSISTS OF3 of 4$5,975,000+36%
17 JAN 2024050423IzardTHE PURPOSE OF THIS PROJECT IS TO REPLACE ONE STRUCTURE ON HIGHWAY 56 IN IZARD COUNTY. THIS PROJECT CONSISTS OF CLEARING AND GRUBBING, REMOV1 of 2$6,520,000Low, 59% under the second
01 NOV 2023050171SharpTHE PURPOSE OF THIS PROJECT IS TO REPLACE TWO STRUCTURES ON HIGHWAYS 175 AND 175S IN CHEROKEE VILLAGE IN SHARP COUNTY. THIS PROJECT CONSISTS1 of 2$5,149,000Low, 11% under the second
01 NOV 2023100993RandolphTHE PURPOSE OF THIS PROJECT IS TO REPLACE THREE STRUCTURES ON HIGHWAY 166 IN RANDOLPH COUNTY. THIS PROJECT CONSISTS OF CLEARING AND GRUBBING2 of 2$9,995,000+6.0%
01 NOV 2023101013GreeneTHE PURPOSE OF THIS PROJECT IS TO REPLACE ONE BRIDGE ON HIGHWAY 135 IN GREENE COUNTY. THIS PROJECT CONSISTS OF CLEARING AND GRUBBING, REMOVA2 of 2$5,028,000+5.0%
01 NOV 2023101053RandolphTHE PURPOSE OF THIS PROJECT IS TO REPLACE ONE BRIDGE WITH A R.C. BOX CULVERT ON HIGHWAY 90 IN RANDOLPH COUNTY. THIS PROJECT CONSISTS OF CLEA3 of 3$1,546,000+5.0%
20 SEP 2023090550BooneTHE PURPOSE OF THIS PROJECT IS TO REPLACE ONE BRIDGE STRUCTURE AND IMPROVE APPROXIMATELY 0.097 MILES OF ROADWAY ON HIGHWAY 65B IN BOONE COUN1 of 3$9,775,000Low, 26% under the second
01 MAR 2023090549CarrollTHE PURPOSE OF THIS PROJECT IS TO REPLACE A SINGLE BRIDGE STRUCTURE ON HIGHWAY 187 IN CARROLL COUNTY. THIS PROJECT CONSISTS OF CLEARING AND 1 of 2$3,600,000Low, 47% under the second
09 NOV 2022090555BooneTHE PURPOSE OF THIS PROJECT IS TO REPLACE ONE STRUCTURE ON HIGHWAY 7 IN BOONE COUNTY. THIS PROJECT CONSISTS OF CLEARING AND GRUBBING, REMOVA2 of 2$4,720,000+1.0%
09 NOV 2022101054Craighead, LawrenceTHE PURPORSE OF THIS PROJECT IS TO REPLACE TEN STRUCTURES ON HIGHWAY 230 IN LAWRENCE AND CRAIGHEAD COUNTIES. THIS PROJECT CONSISTS OF CLEARI2 of 2$23,115,000+12%
21 SEP 2022050342WhiteTHE PURPOSE OF THIS PROJECT IS TO REPLACE THREE STRUCTURES ON HIGHWAY 31 IN WHITE COUNTY. THIS PROJECT CONSISTS OF CLEARING AND GRUBBING, RE3 of 6$11,325,000+3.0%
29 JUN 2022050347FultonTHE PURPOSE OF THIS PROJECT IS TO REPLACE FOUR STRUCTURES ON HIGHWAY 9 IN FULTON COUNTY. THIS PROJECT CONSISTS OF CLEARING AND GRUBBING, REM1 of 2$7,888,000Low, 6.0% under the second
29 JUN 2022101010RandolphTHE PURPOSE OF THIS PROJECT IS REPLACE ONE STRUCTURE ON HIGHWAY 115 IN RANDOLPH COUNTY. THIS PROJECT CONSISTS OF CLEARING AND GRUBBING, REMO2 of 3$1,368,000+8.0%
06 APR 2022070563ClarkTHE PURPOSE OF THIS PROJECT IS TO REMOVE AND CONSTRUCT ONE REINFORCED CONCRETE BOX CULVERT AND REMOVE AND CONSTRUCT ONE PIPE CULVERT ON HIGH2 of 3$1,869,000+1.0%
06 APR 2022100997GreeneTHE PURPOSE OF THIS PROJECT IS TO REPLACE ONE BRIDGE ON HIGHWAY 228 IN GREENE COUNTY. THIS PROJECT CONSISTS OF CLEARING AND GRUBBING, REMOVA2 of 3$2,975,000+12%
16 FEB 2022050417WhiteTHE PURPOSE OF THIS PROJECT IS TO REPLACE ONE STRUCTURE ON HIGHWAY 36 IN WHITE COUNTY. THIS PROJECT CONSISTS OF CLEARING AND GRUBBING, REMOV1 of 4$3,975,000Low, 4.0% under the second
West Plains BR. & Grading, LLC: latest ARDOT bids in the data

How this record was read

ARDOT monthly bid tab PDFs (morning and afternoon sessions), January 2022 to November 2026. Base bids are printed in whole dollars; on A+B and A+C jobs the base bid is kept, and the published rank follows the award amount.

  • Every bid counted here matched its published total to within one dollar; ARDOT's rank decides who was low.
  • The gap to the low bid is the firm's total over the low total, minus one, on contracts it did not win, leaving out bids over three times the low bid.
  • A record covers the lettings in the data, not every contract the firm ever bid. Coverage by year is on the state page.

A name split in two, or a figure that does not match the owner's tabulation? Write to mehdi@miragemetrics.com and we correct it.

Your own bid history, read the same way

Mirage deploys AI agents for heavy civil estimating teams: quantities from the plan set, specs and addenda read, and bid tabs compared, inside your systems and your rules.

We use your email to reply to you and, now and then, to tell you about Mirage. You can opt out at any time. Privacy policy