ARDOT contract 100995 bid tabulation

THE PURPOSE OF THIS PROJECT IS TO REPLACE TWO STRUCTURES ON HIGHWAY 91 IN CRAIGHEAD COUNTY. THIS PROJECT CONSISTS OF CLEARING AND GRUBBING, REMOVAL AND DISPOSAL ITEMS, EARTHWORK, AGGREGATE BASE COURSE, ACHM BINDER AND SURFACE COURSES, COLD MILLING ASPHALT PAVEMENT, ACHM PATCHING OF EXISTING ROADWAY, APPROACH SLABS AND GUTTERS, MAINTENANCE OF TRAFFIC, MINOR DRAINAGE, GUARDRAIL, EROSION CONTROL, PAVEMENT MARKING, CONSTRUCT ONE CONTINUOUS PLATE GIRDER UNIT BRIDGE (282.17'), CONSTRUCT ONE TRIPLE RC BOX CULVERT (20.33'), AND MISC. ITEMS. Let by Arkansas DOT on January 15, 2025, Craighead. 3 bids received; low bid $5,368,898 by Robertson Contractors, Inc..

Owner
Arkansas DOT
Letting
15 JAN 2025
Pay items
74
Data through
04 NOV 2026

Bidders

RankBidderTotal bidAgainst the low bid
1Robertson Contractors, Inc.$5,368,898Low
2Mobley Contractors, Inc.$6,782,208+26%
3West Plains BR. & Grading, LLC$6,946,000+29%
ARDOT contract 100995: bids by rank

Bid tabulation

LinePay itemUnitQuantity1. Robertson Contractors, Inc.2. Mobley Contractors, Inc.3. West Plains BR. & Grading, LLC
0001Clearing (201011)STA38$1,050.00$472.50$340.00
0002Grubbing (201111)STA38$850.00$472.50$285.00
0003Removal and disposal of pipe culverts (202096)EACH5$850.00$498.75$1,890.00
0004Removal and disposal of box culverts (202097)EACH1$8,500.00$16,800$6,000.00
0005Removal and disposal of guardrail (202132)LF116$8.85$15.75$13.00
0006Removal of existing bridge structure (site no. 1) (205011)LS1$105,000$217,463$125,000
0007Unclassified excavation (210213)CY10,143$17.70$16.80$18.00
0008Compacted embankment (210611)CY40,841$22.15$29.40$34.00
0009Soil stabilization (210702)TON250$165.00$289.00$230.00
0010Aggregate base course (class 7) (303117)TON6,213$36.50$41.42$42.00
0011Tack coat (401011)GAL1,129$0.01$1.89$0.01
0012Mineral aggregate in achm binder course (1") (406161)TON1,719$75.00$149.99$70.00
0013Asphalt binder (PG 64-22) in achm binder course (1") (minimum bid $120.00) (406402)TON75$600.00$126.00$590.00
0014Mineral aggregate in achm surface course (1/2") (407162)TON2,023$80.00$145.12$75.00
0015Asphalt binder (PG 64-22) in achm surface course (1/2") (minimum bid $120.00) (407432)TON120$600.00$126.00$590.00
0016Cold milling asphalt pavement (412002)SY526$8.00$20.96$12.50
0017Asphalt concrete patching for maintenance of traffic (414011)TON16$200.00$157.50$150.00
0018Achm patching of existing roadway (415011)TON10$150.00$157.50$150.00
0019Approach slabs (504031)CY102.60$805.00$1,065.69$660.00
0020Approach gutters (504264)CY16.80$1,205.00$1,618.05$900.00
0021Furnishing field office (602011)EACH1$20,000$70,141$40,000
0022Maintenance of traffic (603009)LS1$150,000$537,221$366,888
0023Signs (604003)SF217$10.00$10.50$10.00
0024Barricades (604013)LF96$18.00$18.90$18.00
0025Traffic drums (604023)EACH12$30.00$31.50$30.00
0026Construction pavement markings (604041)LF15,276$0.30$0.47$0.45
0027Removable construction pavement markings (604051)LF2,632$2.90$3.05$2.90
0028Vertical panels (604083)EACH30$30.00$31.50$30.00
002918" side drain (606703)LF92$92.00$100.80$110.00
003024" side drain (606704)LF85$105.00$117.60$135.00
0031Selected pipe bedding (606994)CY20$65.00$29.40$37.00
00324" pipe underdrains (611008)LF1,150$1.00$14.70$2.40
0033Underdrain outlet protectors (611013)EACH5$375.00$777.00$347.00
0034Pavement repair over culverts (asphalt) (615032)TON59$100.00$147.00$310.00
0035Guardrail (type A) (617005)LF450$32.00$33.60$32.00
0036Guardrail (type C) (617007)LF25$55.00$57.75$55.00
0037Guardrail terminal (type 2) (617312)EACH4$3,000.00$3,150.00$3,000.00
0038Thrie beam guardrail terminal (617332)EACH4$2,000.00$2,100.00$2,000.00
0039Lime (620001)TON21$85.00$89.25$85.00
0040Seeding (620011)ACRE10.30$1,350.00$1,417.50$1,350.00
0041Mulch cover (620022)ACRE42.61$950.00$997.50$950.00
0042Water (620030)MGAL1,710.10$5.00$5.25$5.00
0043Temporary seeding (621001)ACRE32.31$750.00$787.50$750.00
0044Silt fence (621021)LF11,768$3.00$3.15$3.00
0045Sediment removal and disposal (621111)CY454$1.00$26.25$0.05
0046Rock ditch checks (621151)CY53$85.00$105.00$135.00
0047Second seeding application (623001)ACRE10.30$350.00$367.50$350.00
0048Solid sodding (624001)SY21$23.80$24.99$23.80
0049Roadway construction control (635001)LS1$65,000$26,913$50,000
0050Bridge construction control (636001)LS1$40,000$28,230$50,000
0051Mailboxes (637001)EACH1$50.00$52.50$50.00
0052Mailbox supports (single) (637017)EACH1$120.00$126.00$120.00
0053Reflectorized paint pavement marking white (6") (718002)LF7,638$0.45$0.58$0.55
0054Reflectorized paint pavement marking yellow (6") (718102)LF7,638$0.45$0.58$0.55
0055Raised pavement markers (type II) (721002)EACH162$7.00$7.35$7.00
0056Unclassified excavation for structures-roadway (801101)CY66$145.00$1,271.92$120.00
0057Class S concrete-roadway (802012)CY126.63$1,255.00$2,064.79$1,950.00
0058Class S concrete-bridge (802112)CY137.80$1,610.00$1,826.42$2,250.00
0059Class S(AE) concrete-bridge (802122)CY329$1,520.00$1,754.90$1,600.00
0060Class 2 protective surface treatment (803004)SY1,174.40$8.00$7.50$10.00
0061Reinforcing steel-roadway (grade 60) (804003)LB28,620$2.25$2.86$2.50
0062Reinforcing steel-bridge (grade 60) (804013)LB32,820$2.15$1.84$2.85
0063Epoxy coated reinforcing steel (grade 60) (804023)LB92,640$2.25$2.07$2.50
0064Steel shell piling (18" diameter) (805124)LF1,003$225.00$192.16$215.00
0065Steel shell piling (24" diameter) (805127)LF760$305.00$234.94$325.00
0066Pile encasement (805513)LF128$315.00$312.30$285.00
0067Structural steel in plate girder spans (A709, GR. 50W) (807234)LB238,470$3.00$3.34$5.00
0068Painting structural steel (807301)TON36.50$685.00$1,064.10$1,250.00
0069Elastomeric bearings (808002)CUIN3,360$6.35$6.76$5.50
0070Silicone joint sealant (809015)LF66$105.00$106.74$325.00
0071Bridge name plate (type D) (812004)EACH1$250.00$1,610.30$1,500.00
0072Filter blanket (816003)SY838$5.25$4.73$6.00
0073Dumped riprap (816111)CY466$85.00$115.50$95.00
0074Mobilization (unit bid amount may not exceed 5% of subtotal) (601001)LS1$255,000$291,715$330,000
ARDOT contract 100995: unit prices by line

The pay item list has one row per line (item, description, unit, quantity, the low bidder's unit price), the flat layout estimating software imports. Pay items with a page of their own open their price history.

Source

Read from ARDOT's tabulation for this contract. ARDOT monthly bid tab PDFs (morning and afternoon sessions), January 2022 to November 2026. Base bids are printed in whole dollars; on A+B and A+C jobs the base bid is kept, and the published rank follows the award amount.

Every contract let that day: ARDOT letting of January 15, 2025. Compiled by Mirage Metrics.

Your own bid history, read the same way

Mirage deploys AI agents for heavy civil estimating teams: quantities from the plan set, specs and addenda read, and bid tabs compared, inside your systems and your rules.

We use your email to reply to you and, now and then, to tell you about Mirage. You can opt out at any time. Privacy policy