Crouse Construction Co.: ARDOT bid record

Crouse Construction Co. submitted 10 bids on Arkansas DOT contracts in the data, from 09 NOV 2022 to 04 NOV 2026, and was the low bidder on 6 of them (60%). When it was not low, its total sat a median +18% above the low bid.

Owner
Arkansas DOT
Low bid volume
$24,902,680
Latest bid
04 NOV 2026
Data through
04 NOV 2026
10Bids
6Low bids
60Win rate, percent
+18%Median gap to the low bid when not low, 4 bids

By year

YearBidsLow bidsWin rate
202211100%
2023200%
202422100%
20253267%
20262150%
Crouse Construction Co., ARDOT: bids and low bids by year of letting

By county

CountyBidsLow bidsWin rate
Boone4250%
Carroll2150%
Madison2150%
Baxter11100%
Searcy11100%
Crouse Construction Co., ARDOT: bids and low bids by county

Pay items where it is most often lowest

Pay itemCodeUnitLines bidLowest on the lineIts median priceAll bidders' median
Asphalt binder (PG 64-22) in achm surface course (1/2") (minimum bid $120.00)407432TON1010 (100%)$120.00$120.00
Water620030MGAL99 (100%)$10.00$10.00
Signs604003SF108 (80%)$12.50$8.40
Tack coat401011GAL107 (70%)$3.73$3.75
Compacted embankment210611CY107 (70%)$20.00$30.00
Raised pavement markers (type II)721002EACH97 (78%)$10.00$6.50
Thermoplastic pavement marking yellow (6")719102LF97 (78%)$1.75$0.85
Thermoplastic pavement marking white (6")719002LF97 (78%)$1.75$0.90
Traffic drums604023EACH97 (78%)$36.00$33.00
Barricades604013LF97 (78%)$25.00$25.00
Asphalt binder (PG 64-22) in achm binder course (1") (minimum bid $120.00)406402TON77 (100%)$120.00$126.00
Mineral aggregate in achm surface course (1/2")407162TON106 (60%)$156.50$124.55
Crouse Construction Co., ARDOT: pay items where its unit price was the lowest on the line

A line counts when the firm priced it and at least one other bidder did too; the lowest unit price on the line counts whoever won the contract. Token prices and bids over three times the low bid are left out.

Who it meets most

FirmContracts in commonThat firm ranked ahead
West Plains BR. & Grading, LLC52 of 5
Mobley Contractors, Inc.41 of 4
L. E. Davis Construction, Inc.41 of 4
Robertson Contractors, Inc.40 of 4
R.L. Persons Construction, Inc.20 of 2
Apac-Central, Inc.20 of 2
McGeorge Contracting Co., Inc.11 of 1
Grant Garrett Excavating, Inc.11 of 1
White River Materials, Inc.10 of 1
Capital Paving & Construction, LLC10 of 1
Crouse Construction Co., ARDOT: the firms on the same contracts most often

Latest bids

LetContractCountyProjectRankIts bidAgainst the low bid
04 NOV 2026BR4401MadisonTHE PURPOSE OF THIS PROJECT IS TO REPLACE THE BRIDGE STRUCTURE ON 0.452 MILE OF COUNTY ROAD 7 SOUTH OF HUNTSVILLE IN MADISON COUNTY. THIS PR2 of 5$4,946,369+9.0%
04 MAR 2026090593CarrollTHE PURPOSE OF THIS PROJECT IS TO IMPLEMENT INTERSECTION IMPROVEMENTS ON HIGHWAY 62 IN BERRYVILLE IN CARROLL COUNTY. THIS PROJECT CONSISTS O1 of 2$1,046,232Low, 6.0% under the second
05 NOV 2025090672SearcyTHE PURPOSE OF THIS PROJECT IS TO REALIGN HWY. 66 IN SEARCY COUNTY. THIS PROJECT CONSISTS OF CLEARING AND GRUBBING, REMOVAL AND DISPOSAL ITE1 of 6$6,399,110Low, 13% under the second
17 SEP 2025090647BaxterTHE PURPOSE OF THIS PROJECT IS TO REPLACE ONE STRUCTURE ON HIGHWAY 5 IN BAXTER COUNTY. THIS PROJECT CONSISTS OF REMOVAL AND DISPOSAL ITEMS, 1 of 6$2,373,216Low, 16% under the second
21 MAY 2025090581BooneTHE PURPOSE OF THIS PROJECT IS TO ADD PASSING LANES ON HIGHWAY 62 IN BOONE COUNTY. THIS PROJECT CONSISTS OF CLEARING AND GRUBBING, REMOVAL A3 of 6$13,085,190+14%
06 NOV 2024090490BooneTHE PURPOSE OF THIS PROJECT IS TO MAKE IMPROVEMENTS TO THREE INTERSECTIONS AND THEIR RESPECTIVE TRAFFIC SIGNALS ALONG HIGHWAY 65 IN THE CITY1 of 2$2,347,027Low, 39% under the second
17 JAN 2024090523MadisonTHE PURPOSE OF THIS PROJECT IS TO REPLACE ONE STRUCTURE ON HIGHWAY 23 IN MADISON COUNTY. THIS PROJECT CONSISTS OF CLEARING AND GRUBBING, REM1 of 2$8,062,324Low, 20% under the second
01 NOV 2023090435CarrollTHE PURPOSE OF THIS PROJECT IS TO REPLACE ONE STRUCTURE ON HIGHWAY 21 IN CARROLL COUNTY. THIS PROJECT CONSISTS OF CLEARING AND GRUBBING, REM2 of 2$4,704,222+21%
20 SEP 2023090550BooneTHE PURPOSE OF THIS PROJECT IS TO REPLACE ONE BRIDGE STRUCTURE AND IMPROVE APPROXIMATELY 0.097 MILES OF ROADWAY ON HIGHWAY 65B IN BOONE COUN3 of 3$15,345,459+57%
09 NOV 2022090555BooneTHE PURPOSE OF THIS PROJECT IS TO REPLACE ONE STRUCTURE ON HIGHWAY 7 IN BOONE COUNTY. THIS PROJECT CONSISTS OF CLEARING AND GRUBBING, REMOVA1 of 2$4,674,771Low, 1.0% under the second
Crouse Construction Co.: latest ARDOT bids in the data

How this record was read

ARDOT monthly bid tab PDFs (morning and afternoon sessions), January 2022 to November 2026. Base bids are printed in whole dollars; on A+B and A+C jobs the base bid is kept, and the published rank follows the award amount.

  • Every bid counted here matched its published total to within one dollar; ARDOT's rank decides who was low.
  • The gap to the low bid is the firm's total over the low total, minus one, on contracts it did not win, leaving out bids over three times the low bid.
  • A record covers the lettings in the data, not every contract the firm ever bid. Coverage by year is on the state page.

A name split in two, or a figure that does not match the owner's tabulation? Write to mehdi@miragemetrics.com and we correct it.

Your own bid history, read the same way

Mirage deploys AI agents for heavy civil estimating teams: quantities from the plan set, specs and addenda read, and bid tabs compared, inside your systems and your rules.

We use your email to reply to you and, now and then, to tell you about Mirage. You can opt out at any time. Privacy policy