Crouse Construction Co.: ARDOT bid record
Crouse Construction Co. submitted 10 bids on Arkansas DOT contracts in the data, from 09 NOV 2022 to 04 NOV 2026, and was the low bidder on 6 of them (60%). When it was not low, its total sat a median +18% above the low bid.
- Owner
- Arkansas DOT
- Low bid volume
- $24,902,680
- Latest bid
- 04 NOV 2026
- Data through
- 04 NOV 2026
By year
| Year | Bids | Low bids | Win rate |
|---|---|---|---|
| 2022 | 1 | 1 | 100% |
| 2023 | 2 | 0 | 0% |
| 2024 | 2 | 2 | 100% |
| 2025 | 3 | 2 | 67% |
| 2026 | 2 | 1 | 50% |
By county
| County | Bids | Low bids | Win rate |
|---|---|---|---|
| Boone | 4 | 2 | 50% |
| Carroll | 2 | 1 | 50% |
| Madison | 2 | 1 | 50% |
| Baxter | 1 | 1 | 100% |
| Searcy | 1 | 1 | 100% |
Pay items where it is most often lowest
| Pay item | Code | Unit | Lines bid | Lowest on the line | Its median price | All bidders' median |
|---|---|---|---|---|---|---|
| Asphalt binder (PG 64-22) in achm surface course (1/2") (minimum bid $120.00) | 407432 | TON | 10 | 10 (100%) | $120.00 | $120.00 |
| Water | 620030 | MGAL | 9 | 9 (100%) | $10.00 | $10.00 |
| Signs | 604003 | SF | 10 | 8 (80%) | $12.50 | $8.40 |
| Tack coat | 401011 | GAL | 10 | 7 (70%) | $3.73 | $3.75 |
| Compacted embankment | 210611 | CY | 10 | 7 (70%) | $20.00 | $30.00 |
| Raised pavement markers (type II) | 721002 | EACH | 9 | 7 (78%) | $10.00 | $6.50 |
| Thermoplastic pavement marking yellow (6") | 719102 | LF | 9 | 7 (78%) | $1.75 | $0.85 |
| Thermoplastic pavement marking white (6") | 719002 | LF | 9 | 7 (78%) | $1.75 | $0.90 |
| Traffic drums | 604023 | EACH | 9 | 7 (78%) | $36.00 | $33.00 |
| Barricades | 604013 | LF | 9 | 7 (78%) | $25.00 | $25.00 |
| Asphalt binder (PG 64-22) in achm binder course (1") (minimum bid $120.00) | 406402 | TON | 7 | 7 (100%) | $120.00 | $126.00 |
| Mineral aggregate in achm surface course (1/2") | 407162 | TON | 10 | 6 (60%) | $156.50 | $124.55 |
A line counts when the firm priced it and at least one other bidder did too; the lowest unit price on the line counts whoever won the contract. Token prices and bids over three times the low bid are left out.
Who it meets most
| Firm | Contracts in common | That firm ranked ahead |
|---|---|---|
| West Plains BR. & Grading, LLC | 5 | 2 of 5 |
| Mobley Contractors, Inc. | 4 | 1 of 4 |
| L. E. Davis Construction, Inc. | 4 | 1 of 4 |
| Robertson Contractors, Inc. | 4 | 0 of 4 |
| R.L. Persons Construction, Inc. | 2 | 0 of 2 |
| Apac-Central, Inc. | 2 | 0 of 2 |
| McGeorge Contracting Co., Inc. | 1 | 1 of 1 |
| Grant Garrett Excavating, Inc. | 1 | 1 of 1 |
| White River Materials, Inc. | 1 | 0 of 1 |
| Capital Paving & Construction, LLC | 1 | 0 of 1 |
Latest bids
| Let | Contract | County | Project | Rank | Its bid | Against the low bid |
|---|---|---|---|---|---|---|
| 04 NOV 2026 | BR4401 | Madison | THE PURPOSE OF THIS PROJECT IS TO REPLACE THE BRIDGE STRUCTURE ON 0.452 MILE OF COUNTY ROAD 7 SOUTH OF HUNTSVILLE IN MADISON COUNTY. THIS PR | 2 of 5 | $4,946,369 | +9.0% |
| 04 MAR 2026 | 090593 | Carroll | THE PURPOSE OF THIS PROJECT IS TO IMPLEMENT INTERSECTION IMPROVEMENTS ON HIGHWAY 62 IN BERRYVILLE IN CARROLL COUNTY. THIS PROJECT CONSISTS O | 1 of 2 | $1,046,232 | Low, 6.0% under the second |
| 05 NOV 2025 | 090672 | Searcy | THE PURPOSE OF THIS PROJECT IS TO REALIGN HWY. 66 IN SEARCY COUNTY. THIS PROJECT CONSISTS OF CLEARING AND GRUBBING, REMOVAL AND DISPOSAL ITE | 1 of 6 | $6,399,110 | Low, 13% under the second |
| 17 SEP 2025 | 090647 | Baxter | THE PURPOSE OF THIS PROJECT IS TO REPLACE ONE STRUCTURE ON HIGHWAY 5 IN BAXTER COUNTY. THIS PROJECT CONSISTS OF REMOVAL AND DISPOSAL ITEMS, | 1 of 6 | $2,373,216 | Low, 16% under the second |
| 21 MAY 2025 | 090581 | Boone | THE PURPOSE OF THIS PROJECT IS TO ADD PASSING LANES ON HIGHWAY 62 IN BOONE COUNTY. THIS PROJECT CONSISTS OF CLEARING AND GRUBBING, REMOVAL A | 3 of 6 | $13,085,190 | +14% |
| 06 NOV 2024 | 090490 | Boone | THE PURPOSE OF THIS PROJECT IS TO MAKE IMPROVEMENTS TO THREE INTERSECTIONS AND THEIR RESPECTIVE TRAFFIC SIGNALS ALONG HIGHWAY 65 IN THE CITY | 1 of 2 | $2,347,027 | Low, 39% under the second |
| 17 JAN 2024 | 090523 | Madison | THE PURPOSE OF THIS PROJECT IS TO REPLACE ONE STRUCTURE ON HIGHWAY 23 IN MADISON COUNTY. THIS PROJECT CONSISTS OF CLEARING AND GRUBBING, REM | 1 of 2 | $8,062,324 | Low, 20% under the second |
| 01 NOV 2023 | 090435 | Carroll | THE PURPOSE OF THIS PROJECT IS TO REPLACE ONE STRUCTURE ON HIGHWAY 21 IN CARROLL COUNTY. THIS PROJECT CONSISTS OF CLEARING AND GRUBBING, REM | 2 of 2 | $4,704,222 | +21% |
| 20 SEP 2023 | 090550 | Boone | THE PURPOSE OF THIS PROJECT IS TO REPLACE ONE BRIDGE STRUCTURE AND IMPROVE APPROXIMATELY 0.097 MILES OF ROADWAY ON HIGHWAY 65B IN BOONE COUN | 3 of 3 | $15,345,459 | +57% |
| 09 NOV 2022 | 090555 | Boone | THE PURPOSE OF THIS PROJECT IS TO REPLACE ONE STRUCTURE ON HIGHWAY 7 IN BOONE COUNTY. THIS PROJECT CONSISTS OF CLEARING AND GRUBBING, REMOVA | 1 of 2 | $4,674,771 | Low, 1.0% under the second |
How this record was read
ARDOT monthly bid tab PDFs (morning and afternoon sessions), January 2022 to November 2026. Base bids are printed in whole dollars; on A+B and A+C jobs the base bid is kept, and the published rank follows the award amount.
- Every bid counted here matched its published total to within one dollar; ARDOT's rank decides who was low.
- The gap to the low bid is the firm's total over the low total, minus one, on contracts it did not win, leaving out bids over three times the low bid.
- A record covers the lettings in the data, not every contract the firm ever bid. Coverage by year is on the state page.
A name split in two, or a figure that does not match the owner's tabulation? Write to mehdi@miragemetrics.com and we correct it.
Your own bid history, read the same way
Mirage deploys AI agents for heavy civil estimating teams: quantities from the plan set, specs and addenda read, and bid tabs compared, inside your systems and your rules.