Grant Garrett Excavating, Inc.: ARDOT bid record

Grant Garrett Excavating, Inc. submitted 39 bids on Arkansas DOT contracts in the data, from 06 APR 2022 to 23 SEP 2026, and was the low bidder on 11 of them (28%). When it was not low, its total sat a median +14% above the low bid.

Owner
Arkansas DOT
Low bid volume
$19,976,533
Latest bid
23 SEP 2026
Data through
04 NOV 2026
39Bids
11Low bids
28Win rate, percent
+14%Median gap to the low bid when not low, 28 bids

By year

YearBidsLow bidsWin rate
2022200%
20237229%
202411545%
202512325%
20267114%
Grant Garrett Excavating, Inc., ARDOT: bids and low bids by year of letting

By county

CountyBidsLow bidsWin rate
Benton20735%
Washington12217%
Crawford200%
Franklin, Sebastian11100%
Madison100%
Garland11100%
Boone100%
Little River100%
Grant Garrett Excavating, Inc., ARDOT: bids and low bids by county

Pay items where it is most often lowest

Pay itemCodeUnitLines bidLowest on the lineIts median priceAll bidders' median
Achm patching of existing roadway415011TON3418 (53%)$210.51$250.00
Asphalt binder (PG 64-22) in achm surface course (3/8") (minimum bid $120.00)407431TON1616 (100%)$120.00$120.00
Asphalt binder (PG 64-22) in achm surface course (1/2") (minimum bid $120.00)407432TON1210 (83%)$120.00$120.00
Signs604003SF399 (23%)$23.05$8.40
Tack coat401011GAL359 (26%)$3.84$3.75
Mineral aggregate in achm surface course (3/8")407161TON219 (43%)$124.27$124.22
Reflectorized paint pavement marking yellow (4")718101LF159 (60%)$0.42$0.21
Cold milling asphalt pavement412002SY206 (30%)$5.38$8.00
Mineral aggregate in achm surface course (1/2")407162TON176 (35%)$119.07$124.55
Unclassified excavation210213CY86 (75%)$17.09$25.00
Asphalt binder (PG 64-22) in achm binder course (1") (minimum bid $120.00)406402TON76 (86%)$120.00$126.00
Asphalt binder (PG 70-22) in achm surface course (1/2") (minimum bid $120.00)407442TON76 (86%)$120.00$120.00
Grant Garrett Excavating, Inc., ARDOT: pay items where its unit price was the lowest on the line

A line counts when the firm priced it and at least one other bidder did too; the lowest unit price on the line counts whoever won the contract. Token prices and bids over three times the low bid are left out.

Who it meets most

Grant Garrett Excavating, Inc., ARDOT: the firms on the same contracts most often

Latest bids

LetContractCountyProjectRankIts bidAgainst the low bid
23 SEP 2026CB0401BentonTHE PURPOSE OF THIS PROJECT IS TO CONSTRUCT A QUINT. 12' X 8' R.C. BOX CULVERT AND APPROACHES ON 0.138 MILE OF BREDEHOEFT ROAD IN THE CITY O2 of 6$1,289,754+18%
12 AUG 2026030531Little RiverTHE PURPOSE OF THIS PROJECT IS TO RAISE THE ROADWAY GRADE ON HIGHWAY 71 IN LITTLE RIVER COUNTY. THIS PROJECT CONSISTS OF CLEARING AND GRUBBI2 of 6$21,448,418+26%
24 JUN 2026A90046BentonTHE PURPOSE OF THIS PROJECT IS TO MILL AND INLAY APPROXIMATELY 2.909 MILES OF HIGHWAY 71B IN BENTON COUNTY. THIS PROJECT CONSISTS OF ACHM SU3 of 3$2,400,087+39%
20 MAY 2026A40052WashingtonTHE PURPOSE OF THIS PROJECT IS TO MILL AND OVERLAY APPROXIMATELY 1.513 MILES OF HIGHWAY 180 IN WASHINGTON COUNTY. THIS PROJECT CONSISTS OF A2 of 2$1,553,641+38%
20 MAY 2026SA0449BentonTHE PURPOSE OF THIS PROJECT IS TO OVERLAY APPROXIMATELY 3.02 MILES OF W. MOUNTAIN RD. AND CARLTON DR. IN BENTON COUNTY. THIS PROJECT CONSIST3 of 4$639,996+15%
21 JAN 2026A40047WashingtonTHE PURPOSE OF THIS PROJECT IS TO MILL, OVERLAY, AND SCRUB SEAL APPROXIMATELY 12.878 MILES OF HIGHWAY 16 IN WASHINGTON COUNTY. THIS PROJECT 1 of 3$4,798,314Low, 13% under the second
21 JAN 2026C04029BentonTHE PURPOSE OF THIS PROJECT IS TO OVERLAY APPROXIMATELY 1.12 MILES OF VARIOUS CITY STREETS IN THE CITY OF BELLA VISTA & 2.25 MILES IN THE CI2 of 4$544,883+2.0%
05 NOV 2025090433BentonTHE PURPOSE OF THIS PROJECT IS TO CONSTRUCT A ROUNDABOUT ON HIGHWAY 264 IN BENTON COUNTY. THIS PROJECT CONSISTS OF CLEARING AND GRUBBING, RE1 of 4$3,487,049Low, 26% under the second
05 NOV 2025090651BentonTHE PURPOSE OF THIS PROJECT IS TO IMPROVE THE INTERSECTION AT HIGHWAYS 12 AND 59 IN BENTON COUNTY. THIS PROJECT CONSISTS OF CLEARING AND GRU1 of 4$3,284,201Low, 6.0% under the second
13 AUG 2025040885CrawfordTHE PURPOSE OF THIS PROJECT IS TO LEVEL WITH ACHM SURFACE COURSE AND NOTCH AND WIDEN APPROXIMATELY 0.131 MILES, WITH APPROXIMATELY 0.248 OF 3 of 5$4,896,934+37%
21 MAY 2025040866WashingtonTHE PURPOSE OF THIS PROJECT IS TO REPLACE THREE STRUCTURES ON HIGHWAY 45 IN WASHINGTON COUNTY. THIS PROJECT CONSISTS OF CLEARING AND GRUBBIN5 of 6$10,945,596+15%
21 MAY 2025090581BooneTHE PURPOSE OF THIS PROJECT IS TO ADD PASSING LANES ON HIGHWAY 62 IN BOONE COUNTY. THIS PROJECT CONSISTS OF CLEARING AND GRUBBING, REMOVAL A2 of 6$12,697,143+11%
09 APR 2025C04028BentonTHE PURPOSE OF THIS PROJECT IS TO SURFACE APPROXIMATELY 0.96 MILE OF VARIOUS CITY STREETS IN THE CITY OF GATEWAY IN BENTON COUNTY. THIS PROJ2 of 3$290,567+1.0%
09 APR 2025SA0448BentonTHE PURPOSE OF THIS PROJECT IS TO OVERLAY 2.16 MILES OF COUNTY ROAD 40 IN BENTON COUNTY. THIS PROJECT CONSISTS OF AGGREGATE BASE COURSE, ACH3 of 3$524,500+7.0%
26 FEB 2025A40041WashingtonTHE PURPOSE OF THIS PROJECT IS TO MILL AND OVERLAY APPROXIMATELY 12.468 MILES OF HIGHWAY 62 IN WASHINGTON COUNTY. THIS PROJECT CONSISTS OF R3 of 4$5,465,913+10%
26 FEB 2025A90033BentonTHE PURPOSE OF THIS PROJECT IS TO MILL AND OVERLAY APPROXIMATELY 6.796 MILES OF HIGHWAYS 59 AND 59B IN BENTON COUNTY. THIS PROJECT CONSISTS 3 of 4$4,278,847+10%
15 JAN 2025A90032BentonTHE PURPOSE OF THIS PROJECT IS TO OVERLAY APPROXIMATELY 4.989 MILES OF HIGHWAY 112 IN BENTON COUNTY. THIS PROJECT CONSISTS OF REMOVAL AND DI2 of 3$2,277,089+14%
15 JAN 2025C72015WashingtonTHE PURPOSE OF THIS PROJECT IS TO OVERLAY APPROXIMATELY 1.29 MILES OF VARIOUS CITY STREETS IN THE CITY OF GREENLAND, APPROXIMATELY 1.57 MILE1 of 3$862,331Low, 3.0% under the second
15 JAN 2025SA72A2WashingtonTHE PURPOSE OF THIS PROJECT IS TO SURFACE APPROXIMATELY 3.05 MILES OF COUNTY ROAD 89 IN WASHINGTON COUNTY. THIS PROJECT CONSISTS OF AGGREGAT2 of 2$636,972+16%
18 SEP 2024090558BentonTHE PURPOSE OF THIS PROJECT IS TO CONSTRUCT ONE PASSING LANE ON HIGHWAY 59 IN BENTON COUNTY. THIS PROJECT CONSISTS OF CLEARING AND GRUBBING,1 of 3$3,499,466Low, 14% under the second
31 JUL 2024061855GarlandTHE PURPOSE OF THIS PROJECT IS TO REPAIR EROSION ALONG HIGHWAY 5 IN GARLAND COUNTY. THIS PROJECT CONSISTS OF CLEARING AND GRUBBING, REMOVAL 1 of 2$1,252,084Low, 99% under the second
22 MAY 2024A40031WashingtonTHE PURPOSE OF THIS PROJECT IS TO LEVEL AND OVERLAY APPROXIMATELY 7.133 MILES OF HIGHWAY 112 IN WASHINGTON COUNTY. THIS PROJECT CONSISTS OF 2 of 2$2,318,447+3.0%
10 APR 2024C04022BentonTHE PURPOSE OF THIS PROJECT IS TO OVERLAY APPROXIMATELY 1.00 MILE OF VARIOUS CITY STREETS IN THE CITY OF SULPHUR SPRINGS IN BENTON COUNTY. T3 of 3$342,977+32%
10 APR 2024C04024BentonTHE PURPOSE OF THIS PROJECT IS TO OVERLAY APPROXIMATELY 2.30 MILES OF NEW HOPE ROAD IN THE CITY OF ROGERS IN BENTON COUNTY. THIS PROJECT CON2 of 3$1,197,973+14%
28 FEB 2024A40035WashingtonTHE PURPOSE OF THIS PROJECT IS TO MILL AND OVERLAY APPROXIMATELY 8.113 MILES OF HIGHWAY 71 IN WASHINGTON COUNTY. THIS PROJECT CONSISTS OF AC2 of 2$5,994,150+13%
Grant Garrett Excavating, Inc.: latest ARDOT bids in the data

How this record was read

ARDOT monthly bid tab PDFs (morning and afternoon sessions), January 2022 to November 2026. Base bids are printed in whole dollars; on A+B and A+C jobs the base bid is kept, and the published rank follows the award amount.

  • Every bid counted here matched its published total to within one dollar; ARDOT's rank decides who was low.
  • The gap to the low bid is the firm's total over the low total, minus one, on contracts it did not win, leaving out bids over three times the low bid.
  • A record covers the lettings in the data, not every contract the firm ever bid. Coverage by year is on the state page.

A name split in two, or a figure that does not match the owner's tabulation? Write to mehdi@miragemetrics.com and we correct it.

Your own bid history, read the same way

Mirage deploys AI agents for heavy civil estimating teams: quantities from the plan set, specs and addenda read, and bid tabs compared, inside your systems and your rules.

We use your email to reply to you and, now and then, to tell you about Mirage. You can opt out at any time. Privacy policy