Grant Garrett Excavating, Inc.: ARDOT bid record
Grant Garrett Excavating, Inc. submitted 39 bids on Arkansas DOT contracts in the data, from 06 APR 2022 to 23 SEP 2026, and was the low bidder on 11 of them (28%). When it was not low, its total sat a median +14% above the low bid.
- Owner
- Arkansas DOT
- Low bid volume
- $19,976,533
- Latest bid
- 23 SEP 2026
- Data through
- 04 NOV 2026
By year
| Year | Bids | Low bids | Win rate |
|---|---|---|---|
| 2022 | 2 | 0 | 0% |
| 2023 | 7 | 2 | 29% |
| 2024 | 11 | 5 | 45% |
| 2025 | 12 | 3 | 25% |
| 2026 | 7 | 1 | 14% |
By county
| County | Bids | Low bids | Win rate |
|---|---|---|---|
| Benton | 20 | 7 | 35% |
| Washington | 12 | 2 | 17% |
| Crawford | 2 | 0 | 0% |
| Franklin, Sebastian | 1 | 1 | 100% |
| Madison | 1 | 0 | 0% |
| Garland | 1 | 1 | 100% |
| Boone | 1 | 0 | 0% |
| Little River | 1 | 0 | 0% |
Pay items where it is most often lowest
| Pay item | Code | Unit | Lines bid | Lowest on the line | Its median price | All bidders' median |
|---|---|---|---|---|---|---|
| Achm patching of existing roadway | 415011 | TON | 34 | 18 (53%) | $210.51 | $250.00 |
| Asphalt binder (PG 64-22) in achm surface course (3/8") (minimum bid $120.00) | 407431 | TON | 16 | 16 (100%) | $120.00 | $120.00 |
| Asphalt binder (PG 64-22) in achm surface course (1/2") (minimum bid $120.00) | 407432 | TON | 12 | 10 (83%) | $120.00 | $120.00 |
| Signs | 604003 | SF | 39 | 9 (23%) | $23.05 | $8.40 |
| Tack coat | 401011 | GAL | 35 | 9 (26%) | $3.84 | $3.75 |
| Mineral aggregate in achm surface course (3/8") | 407161 | TON | 21 | 9 (43%) | $124.27 | $124.22 |
| Reflectorized paint pavement marking yellow (4") | 718101 | LF | 15 | 9 (60%) | $0.42 | $0.21 |
| Cold milling asphalt pavement | 412002 | SY | 20 | 6 (30%) | $5.38 | $8.00 |
| Mineral aggregate in achm surface course (1/2") | 407162 | TON | 17 | 6 (35%) | $119.07 | $124.55 |
| Unclassified excavation | 210213 | CY | 8 | 6 (75%) | $17.09 | $25.00 |
| Asphalt binder (PG 64-22) in achm binder course (1") (minimum bid $120.00) | 406402 | TON | 7 | 6 (86%) | $120.00 | $126.00 |
| Asphalt binder (PG 70-22) in achm surface course (1/2") (minimum bid $120.00) | 407442 | TON | 7 | 6 (86%) | $120.00 | $120.00 |
A line counts when the firm priced it and at least one other bidder did too; the lowest unit price on the line counts whoever won the contract. Token prices and bids over three times the low bid are left out.
Who it meets most
| Firm | Contracts in common | That firm ranked ahead |
|---|---|---|
| Apac-Central, Inc. | 32 | 14 of 32 |
| Emery Sapp & Sons, Inc. | 27 | 16 of 27 |
| Robinson Construction, LLC | 8 | 3 of 8 |
| Forsgren, Inc. | 3 | 1 of 3 |
| McGeorge Contracting Co., Inc. | 3 | 2 of 3 |
| Robertson Contractors, Inc. | 2 | 1 of 2 |
| Mobley Contractors, Inc. | 2 | 2 of 2 |
| Capital Paving & Construction, LLC | 2 | 0 of 2 |
| McKenzie Asphalt, LLC | 2 | 0 of 2 |
| Redstone Const. Group, Inc. | 1 | 0 of 1 |
Latest bids
| Let | Contract | County | Project | Rank | Its bid | Against the low bid |
|---|---|---|---|---|---|---|
| 23 SEP 2026 | CB0401 | Benton | THE PURPOSE OF THIS PROJECT IS TO CONSTRUCT A QUINT. 12' X 8' R.C. BOX CULVERT AND APPROACHES ON 0.138 MILE OF BREDEHOEFT ROAD IN THE CITY O | 2 of 6 | $1,289,754 | +18% |
| 12 AUG 2026 | 030531 | Little River | THE PURPOSE OF THIS PROJECT IS TO RAISE THE ROADWAY GRADE ON HIGHWAY 71 IN LITTLE RIVER COUNTY. THIS PROJECT CONSISTS OF CLEARING AND GRUBBI | 2 of 6 | $21,448,418 | +26% |
| 24 JUN 2026 | A90046 | Benton | THE PURPOSE OF THIS PROJECT IS TO MILL AND INLAY APPROXIMATELY 2.909 MILES OF HIGHWAY 71B IN BENTON COUNTY. THIS PROJECT CONSISTS OF ACHM SU | 3 of 3 | $2,400,087 | +39% |
| 20 MAY 2026 | A40052 | Washington | THE PURPOSE OF THIS PROJECT IS TO MILL AND OVERLAY APPROXIMATELY 1.513 MILES OF HIGHWAY 180 IN WASHINGTON COUNTY. THIS PROJECT CONSISTS OF A | 2 of 2 | $1,553,641 | +38% |
| 20 MAY 2026 | SA0449 | Benton | THE PURPOSE OF THIS PROJECT IS TO OVERLAY APPROXIMATELY 3.02 MILES OF W. MOUNTAIN RD. AND CARLTON DR. IN BENTON COUNTY. THIS PROJECT CONSIST | 3 of 4 | $639,996 | +15% |
| 21 JAN 2026 | A40047 | Washington | THE PURPOSE OF THIS PROJECT IS TO MILL, OVERLAY, AND SCRUB SEAL APPROXIMATELY 12.878 MILES OF HIGHWAY 16 IN WASHINGTON COUNTY. THIS PROJECT | 1 of 3 | $4,798,314 | Low, 13% under the second |
| 21 JAN 2026 | C04029 | Benton | THE PURPOSE OF THIS PROJECT IS TO OVERLAY APPROXIMATELY 1.12 MILES OF VARIOUS CITY STREETS IN THE CITY OF BELLA VISTA & 2.25 MILES IN THE CI | 2 of 4 | $544,883 | +2.0% |
| 05 NOV 2025 | 090433 | Benton | THE PURPOSE OF THIS PROJECT IS TO CONSTRUCT A ROUNDABOUT ON HIGHWAY 264 IN BENTON COUNTY. THIS PROJECT CONSISTS OF CLEARING AND GRUBBING, RE | 1 of 4 | $3,487,049 | Low, 26% under the second |
| 05 NOV 2025 | 090651 | Benton | THE PURPOSE OF THIS PROJECT IS TO IMPROVE THE INTERSECTION AT HIGHWAYS 12 AND 59 IN BENTON COUNTY. THIS PROJECT CONSISTS OF CLEARING AND GRU | 1 of 4 | $3,284,201 | Low, 6.0% under the second |
| 13 AUG 2025 | 040885 | Crawford | THE PURPOSE OF THIS PROJECT IS TO LEVEL WITH ACHM SURFACE COURSE AND NOTCH AND WIDEN APPROXIMATELY 0.131 MILES, WITH APPROXIMATELY 0.248 OF | 3 of 5 | $4,896,934 | +37% |
| 21 MAY 2025 | 040866 | Washington | THE PURPOSE OF THIS PROJECT IS TO REPLACE THREE STRUCTURES ON HIGHWAY 45 IN WASHINGTON COUNTY. THIS PROJECT CONSISTS OF CLEARING AND GRUBBIN | 5 of 6 | $10,945,596 | +15% |
| 21 MAY 2025 | 090581 | Boone | THE PURPOSE OF THIS PROJECT IS TO ADD PASSING LANES ON HIGHWAY 62 IN BOONE COUNTY. THIS PROJECT CONSISTS OF CLEARING AND GRUBBING, REMOVAL A | 2 of 6 | $12,697,143 | +11% |
| 09 APR 2025 | C04028 | Benton | THE PURPOSE OF THIS PROJECT IS TO SURFACE APPROXIMATELY 0.96 MILE OF VARIOUS CITY STREETS IN THE CITY OF GATEWAY IN BENTON COUNTY. THIS PROJ | 2 of 3 | $290,567 | +1.0% |
| 09 APR 2025 | SA0448 | Benton | THE PURPOSE OF THIS PROJECT IS TO OVERLAY 2.16 MILES OF COUNTY ROAD 40 IN BENTON COUNTY. THIS PROJECT CONSISTS OF AGGREGATE BASE COURSE, ACH | 3 of 3 | $524,500 | +7.0% |
| 26 FEB 2025 | A40041 | Washington | THE PURPOSE OF THIS PROJECT IS TO MILL AND OVERLAY APPROXIMATELY 12.468 MILES OF HIGHWAY 62 IN WASHINGTON COUNTY. THIS PROJECT CONSISTS OF R | 3 of 4 | $5,465,913 | +10% |
| 26 FEB 2025 | A90033 | Benton | THE PURPOSE OF THIS PROJECT IS TO MILL AND OVERLAY APPROXIMATELY 6.796 MILES OF HIGHWAYS 59 AND 59B IN BENTON COUNTY. THIS PROJECT CONSISTS | 3 of 4 | $4,278,847 | +10% |
| 15 JAN 2025 | A90032 | Benton | THE PURPOSE OF THIS PROJECT IS TO OVERLAY APPROXIMATELY 4.989 MILES OF HIGHWAY 112 IN BENTON COUNTY. THIS PROJECT CONSISTS OF REMOVAL AND DI | 2 of 3 | $2,277,089 | +14% |
| 15 JAN 2025 | C72015 | Washington | THE PURPOSE OF THIS PROJECT IS TO OVERLAY APPROXIMATELY 1.29 MILES OF VARIOUS CITY STREETS IN THE CITY OF GREENLAND, APPROXIMATELY 1.57 MILE | 1 of 3 | $862,331 | Low, 3.0% under the second |
| 15 JAN 2025 | SA72A2 | Washington | THE PURPOSE OF THIS PROJECT IS TO SURFACE APPROXIMATELY 3.05 MILES OF COUNTY ROAD 89 IN WASHINGTON COUNTY. THIS PROJECT CONSISTS OF AGGREGAT | 2 of 2 | $636,972 | +16% |
| 18 SEP 2024 | 090558 | Benton | THE PURPOSE OF THIS PROJECT IS TO CONSTRUCT ONE PASSING LANE ON HIGHWAY 59 IN BENTON COUNTY. THIS PROJECT CONSISTS OF CLEARING AND GRUBBING, | 1 of 3 | $3,499,466 | Low, 14% under the second |
| 31 JUL 2024 | 061855 | Garland | THE PURPOSE OF THIS PROJECT IS TO REPAIR EROSION ALONG HIGHWAY 5 IN GARLAND COUNTY. THIS PROJECT CONSISTS OF CLEARING AND GRUBBING, REMOVAL | 1 of 2 | $1,252,084 | Low, 99% under the second |
| 22 MAY 2024 | A40031 | Washington | THE PURPOSE OF THIS PROJECT IS TO LEVEL AND OVERLAY APPROXIMATELY 7.133 MILES OF HIGHWAY 112 IN WASHINGTON COUNTY. THIS PROJECT CONSISTS OF | 2 of 2 | $2,318,447 | +3.0% |
| 10 APR 2024 | C04022 | Benton | THE PURPOSE OF THIS PROJECT IS TO OVERLAY APPROXIMATELY 1.00 MILE OF VARIOUS CITY STREETS IN THE CITY OF SULPHUR SPRINGS IN BENTON COUNTY. T | 3 of 3 | $342,977 | +32% |
| 10 APR 2024 | C04024 | Benton | THE PURPOSE OF THIS PROJECT IS TO OVERLAY APPROXIMATELY 2.30 MILES OF NEW HOPE ROAD IN THE CITY OF ROGERS IN BENTON COUNTY. THIS PROJECT CON | 2 of 3 | $1,197,973 | +14% |
| 28 FEB 2024 | A40035 | Washington | THE PURPOSE OF THIS PROJECT IS TO MILL AND OVERLAY APPROXIMATELY 8.113 MILES OF HIGHWAY 71 IN WASHINGTON COUNTY. THIS PROJECT CONSISTS OF AC | 2 of 2 | $5,994,150 | +13% |
How this record was read
ARDOT monthly bid tab PDFs (morning and afternoon sessions), January 2022 to November 2026. Base bids are printed in whole dollars; on A+B and A+C jobs the base bid is kept, and the published rank follows the award amount.
- Every bid counted here matched its published total to within one dollar; ARDOT's rank decides who was low.
- The gap to the low bid is the firm's total over the low total, minus one, on contracts it did not win, leaving out bids over three times the low bid.
- A record covers the lettings in the data, not every contract the firm ever bid. Coverage by year is on the state page.
A name split in two, or a figure that does not match the owner's tabulation? Write to mehdi@miragemetrics.com and we correct it.
Your own bid history, read the same way
Mirage deploys AI agents for heavy civil estimating teams: quantities from the plan set, specs and addenda read, and bid tabs compared, inside your systems and your rules.