ARDOT contract CB0401 bid tabulation
THE PURPOSE OF THIS PROJECT IS TO CONSTRUCT A QUINT. 12' X 8' R.C. BOX CULVERT AND APPROACHES ON 0.138 MILE OF BREDEHOEFT ROAD IN THE CITY OF SPRINGTOWN IN BENTON COUNTY. THIS PROJECT CONSISTS OF CLEARING AND GRUBBING, EARTHWORK, AGGREGATE BASE COURSE, ACHM SURFACE COURSE, MAINTENANCE OF TRAFFIC, MINOR DRAINAGE STRUCTURES, EROSION CONTROL ITEMS, ONE QUINTUPLE R.C. BOX CULVERT (TOTAL SPAN 63.83'), AND MISC. ITEMS. Let by Arkansas DOT on September 23, 2026, Benton. 6 bids received; low bid $1,094,785 by Mobley Contractors, Inc..
- Owner
- Arkansas DOT
- Letting
- 23 SEP 2026
- Pay items
- 41
- Data through
- 04 NOV 2026
Bidders
| Rank | Bidder | Total bid | Against the low bid |
|---|---|---|---|
| 1 | Mobley Contractors, Inc. | $1,094,785 | Low |
| 2 | Grant Garrett Excavating, Inc. | $1,289,754 | +18% |
| 3 | Apac-Central, Inc. | $1,362,260 | +24% |
| 4 | Robertson Contractors, Inc. | $1,370,831 | +25% |
| 5 | Nabholz Construction Corporation | $1,487,097 | +36% |
| 6 | Kesser International, Inc. | $1,542,193 | +41% |
Bid tabulation
| Line | Pay item | Unit | Quantity | 1. Mobley Contractors, Inc. | 2. Grant Garrett Excavating, Inc. | 3. Apac-Central, Inc. | 4. Robertson Contractors, Inc. | 5. Nabholz Construction Corporation | 6. Kesser International, Inc. |
|---|---|---|---|---|---|---|---|---|---|
| 0001 | Clearing (201012) | STA | 9 | $1,090.65 | $5,699.00 | $1,700.00 | $3,000.00 | $7,041.30 | $3,920.00 |
| 0002 | Grubbing (201111) | STA | 9 | $1,357.31 | $1,788.00 | $1,700.00 | $2,000.00 | $7,041.30 | $3,920.00 |
| 0003 | Removal and disposal of low water slab (202120) | EACH | 1 | $78,911 | $39,844 | $30,000 | $8,500.00 | $4,346.48 | $61,600 |
| 0004 | Removal and relocation of sign (202922) | EACH | 1 | $250.64 | $408.00 | $3,000.00 | $450.00 | $272.50 | $560.00 |
| 0005 | Unclassified excavation (210210) | CY | 1,631 | $40.63 | $27.50 | $55.00 | $22.00 | $166.19 | $30.24 |
| 0006 | Compacted embankment (210601) | CY | 1,811 | $29.87 | $27.00 | $44.00 | $32.00 | $27.82 | $33.60 |
| 0007 | Soil stabilization (210702) | TON | 25 | $50.00 | $554.00 | $60.00 | $250.00 | $381.50 | $392.00 |
| 0008 | Aggregate base course (class 7) (303107) | TON | 1,430 | $47.00 | $37.13 | $47.00 | $47.00 | $34.43 | $67.20 |
| 0009 | Mineral aggregate in achm surface course (1/2") (407162) | TON | 277 | $168.00 | $127.03 | $175.00 | $168.00 | $200.80 | $217.06 |
| 0010 | Asphalt binder (PG 64-22) in achm surface course (1/2") (minimum bid $120.00) (407432) | TON | 18 | $120.00 | $122.35 | $120.00 | $120.00 | $137.69 | $153.22 |
| 0011 | Furnishing field office (602011) | EACH | 1 | $28,616 | $41,992 | $13,000 | $40,000 | $15,947 | $33,600 |
| 0012 | Maintenance of traffic (603009) | LS | 1 | $29,961 | $74,150 | $5,000.00 | $125,000 | $2,180.00 | $78,400 |
| 0013 | Signs (604003) | SF | 202 | $20.00 | $24.27 | $22.00 | $20.00 | $22.02 | $25.54 |
| 0014 | Barricades (604013) | LF | 32 | $25.00 | $30.33 | $27.00 | $25.00 | $27.53 | $32.20 |
| 0015 | Traffic drums (604023) | EACH | 58 | $50.00 | $60.68 | $55.00 | $50.00 | $55.05 | $63.84 |
| 0016 | 18" side drain (606703) | LF | 84 | $179.12 | $111.32 | $131.00 | $125.00 | $82.08 | $112.00 |
| 0017 | 4" pipe underdrains (611008) | LF | 200 | $19.19 | $55.78 | $32.00 | $14.20 | $19.28 | $5.60 |
| 0018 | Underdrain outlet protectors (611013) | EACH | 4 | $1,258.79 | $2,094.40 | $1,500.00 | $450.00 | $862.13 | $616.00 |
| 0019 | Lime (620001) | TON | 4 | $135.00 | $133.49 | $136.00 | $125.00 | $130.80 | $159.60 |
| 0020 | Seeding (620011) | ACRE | 1.86 | $1,386.29 | $3,700.16 | $1,510.00 | $1,386.29 | $2,725.00 | $1,771.84 |
| 0021 | Mulch cover (620022) | ACRE | 4.22 | $1,137.24 | $1,564.72 | $1,240.00 | $1,137.24 | $1,308.00 | $1,452.64 |
| 0022 | Water (620030) | MGAL | 238.50 | $10.00 | $10.00 | $11.00 | $10.00 | $10.00 | $12.77 |
| 0023 | Temporary seeding (621001) | ACRE | 2.36 | $838.69 | $3,700.17 | $920.00 | $838.69 | $1,199.00 | $1,070.72 |
| 0024 | Silt fence (621021) | LF | 500 | $4.86 | $3.64 | $5.23 | $4.86 | $4.36 | $6.20 |
| 0025 | Sand bag ditch checks (621031) | BAG | 44 | $14.39 | $21.84 | $16.00 | $14.39 | $16.35 | $18.37 |
| 0026 | Sediment removal and disposal (621111) | CY | 279 | $1.00 | $41.31 | $93.00 | $2.00 | $13.28 | $16.80 |
| 0027 | Rock ditch checks (621151) | CY | 33 | $104.87 | $107.83 | $131.00 | $150.00 | $100.57 | $112.00 |
| 0028 | Filter sock (18") (621169) | LF | 2,224 | $11.84 | $6.25 | $13.00 | $11.84 | $15.21 | $15.19 |
| 0029 | Second seeding application (623001) | ACRE | 1.86 | $475.00 | $3,700.17 | $520.00 | $475.00 | $436.00 | $606.48 |
| 0030 | Solid sodding (624001) | SY | 59 | $12.64 | $4.91 | $14.00 | $12.64 | $6.54 | $16.14 |
| 0031 | Erosion control matting (class 3) (626003) | SY | 77 | $7.39 | $6.86 | $8.00 | $7.39 | $5.45 | $9.44 |
| 0032 | Concrete combination curb and gutter (type A) (1' 6") (634201) | LF | 308 | $56.67 | $33.50 | $72.00 | $48.00 | $40.33 | $106.16 |
| 0033 | Roadway construction control (635001) | LS | 1 | $13,559 | $30,162 | $12,000 | $55,000 | $12,656 | $72,800 |
| 0034 | Standard sign (726002) | SF | 12 | $30.00 | $37.00 | $33.00 | $30.00 | $33.03 | $38.30 |
| 0035 | Channel post sign support (type C) (729003) | EACH | 4 | $100.00 | $123.00 | $108.00 | $100.00 | $110.10 | $127.68 |
| 0036 | Unclassified excavation for structures-roadway (801101) | CY | 170 | $325.63 | $93.50 | $700.00 | $155.00 | $359.97 | $134.40 |
| 0037 | Class S concrete-roadway (802011) | CY | 395.20 | $927.67 | $1,566.38 | $1,250.00 | $1,460.00 | $1,382.64 | $1,366.40 |
| 0038 | Reinforcing steel-roadway (grade 60) (804003) | LB | 52,996 | $2.00 | $0.40 | $3.00 | $2.20 | $2.21 | $3.36 |
| 0039 | Mobilization (unit bid amount may not exceed 5% of subtotal) (601001) | LS | 1 | $51,529 | $58,083 | $60,000 | $65,000 | $55,000 | $72,800 |
| 0040 | Filter blanket (816003) | SY | 126 | $9.28 | $27.00 | $20.00 | $5.00 | $5.01 | $16.80 |
| 0041 | Dumped riprap (816111) | CY | 63 | $91.83 | $95.00 | $194.00 | $120.00 | $136.54 | $140.00 |
The pay item list has one row per line (item, description, unit, quantity, the low bidder's unit price), the flat layout estimating software imports. Pay items with a page of their own open their price history.
Source
Read from ARDOT's tabulation for this contract. ARDOT monthly bid tab PDFs (morning and afternoon sessions), January 2022 to November 2026. Base bids are printed in whole dollars; on A+B and A+C jobs the base bid is kept, and the published rank follows the award amount.
Every contract let that day: ARDOT letting of September 23, 2026. Compiled by Mirage Metrics.
Your own bid history, read the same way
Mirage deploys AI agents for heavy civil estimating teams: quantities from the plan set, specs and addenda read, and bid tabs compared, inside your systems and your rules.