ARDOT contract 090651 bid tabulation
THE PURPOSE OF THIS PROJECT IS TO IMPROVE THE INTERSECTION AT HIGHWAYS 12 AND 59 IN BENTON COUNTY. THIS PROJECT CONSISTS OF CLEARING AND GRUBBING, REMOVAL AND DISPOSAL ITEMS, FLOWABLE SELECT MATERIAL, STONE BACKFILL, EARTHWORK, AGGREGATE BASE COURSE, PORTLAND CEMENT CONCRETE BASE, ACHM BASE, BINDER AND SURFACE COURSES, COLD MILLING ASPHALT PAVEMENT, ACHM PATCHING OF EXISTING ROADWAY, APPROACH GUTTERS, PORTLAND CEMENT CONCRETE DRIVEWAY, MAINTENANCE OF TRAFFIC, CONCRETE DITCH PAVING, GUARDRAIL, EROSION CONTROL, CONCRETE ISLAND AND WALKS, HAND RAILING, CURB AND GUTTER, WHEELCHAIR RAMPS, TRAFFIC SIGNAL ITEMS, PAVEMENT MARKERS, AND MISC. ITEMS. Let by Arkansas DOT on November 5, 2025, Benton. 4 bids received; low bid $3,284,201 by Grant Garrett Excavating, Inc..
- Owner
- Arkansas DOT
- Letting
- 05 NOV 2025
- Pay items
- 145
- Data through
- 04 NOV 2026
Bidders
| Rank | Bidder | Total bid | Against the low bid |
|---|---|---|---|
| 1 | Grant Garrett Excavating, Inc. | $3,284,201 | Low |
| 2 | Apac-Central, Inc. | $3,468,243 | +6.0% |
| 3 | Harris United, LLC | $3,613,258 | +10% |
| 4 | Robinson Construction, LLC | $5,285,263 | +61% |
Bid tabulation
| Line | Pay item | Unit | Quantity | 1. Grant Garrett Excavating, Inc. | 2. Apac-Central, Inc. | 3. Harris United, LLC | 4. Robinson Construction, LLC |
|---|---|---|---|---|---|---|---|
| 0001 | Clearing (201011) | STA | 16 | $1,541.00 | $3,395.00 | $2,000.00 | $4,200.00 |
| 0002 | Grubbing (201111) | STA | 16 | $1,112.00 | $3,395.00 | $1,750.00 | $4,200.00 |
| 0003 | Removal and disposal of curb (202001) | LF | 35 | $18.00 | $12.70 | $40.00 | $150.00 |
| 0004 | Removal and disposal of curb and gutter (202003) | LF | 252 | $18.00 | $11.70 | $15.00 | $110.00 |
| 0005 | Removal and disposal of fence (202011) | LF | 81 | $28.00 | $6.40 | $15.00 | $20.00 |
| 0006 | Removal and disposal of rock walls (202034) | LF | 54 | $83.00 | $63.70 | $30.00 | $25.00 |
| 0007 | Removal and disposal of concrete islands (202047) | SY | 159 | $14.00 | $27.60 | $8.00 | $25.00 |
| 0008 | Removal and disposal of concrete driveways (202062) | SY | 611 | $11.00 | $24.40 | $8.00 | $25.00 |
| 0009 | Removal and disposal of walks (202072) | SY | 303 | $15.00 | $19.00 | $8.00 | $25.00 |
| 0010 | Removal and disposal of sign foundations (202084) | EACH | 7 | $1,281.00 | $636.00 | $1,250.00 | $200.00 |
| 0011 | Removal and disposal of pipe culverts (202096) | EACH | 17 | $897.00 | $1,750.00 | $1,100.00 | $300.00 |
| 0012 | Removal and disposal of concrete ditch paving (202125) | SY | 24 | $93.00 | $44.60 | $50.00 | $55.00 |
| 0013 | Removal and disposal of guardrail (202132) | LF | 650 | $17.00 | $9.00 | $27.00 | $8.00 |
| 0014 | Removal and disposal of signs (202191) | EACH | 22 | $611.00 | $244.00 | $250.00 | $100.00 |
| 0015 | Flowable select material (206021) | CY | 50 | $313.00 | $414.00 | $220.00 | $300.00 |
| 0016 | Stone backfill (207011) | TON | 100 | $138.00 | $61.50 | $60.00 | $65.00 |
| 0017 | Unclassified excavation (210213) | CY | 1,694 | $37.00 | $25.00 | $27.00 | $60.00 |
| 0018 | Compacted embankment (210611) | CY | 2,786 | $40.00 | $30.00 | $38.00 | $60.00 |
| 0019 | Soil stabilization (210702) | TON | 50 | $928.00 | $400.00 | $300.00 | $400.00 |
| 0020 | Aggregate base course (class 7) (303117) | TON | 946 | $58.00 | $60.00 | $63.25 | $85.00 |
| 0021 | Portland cement concrete base (5" uniform thickness) (309505) | SY | 873 | $98.00 | $94.00 | $99.00 | $350.00 |
| 0022 | Portland cement concrete base (10" uniform thickness) (309510) | SY | 1,484 | $128.00 | $119.00 | $148.00 | $388.00 |
| 0023 | Tack coat (401011) | GAL | 1,162 | $3.30 | $3.00 | $3.30 | $6.50 |
| 0024 | Mineral aggregate in achm base course (1 1/2") (405161) | TON | 95 | $122.00 | $270.00 | $280.50 | $245.00 |
| 0025 | Asphalt binder (PG 70-22) in achm base course (1 1/2") (minimum bid $120.00) (405412) | TON | 4 | $120.00 | $120.00 | $132.00 | $120.00 |
| 0026 | Mineral aggregate in achm binder course (1") (406161) | TON | 118 | $122.00 | $236.00 | $245.30 | $245.00 |
| 0027 | Asphalt binder (PG 70-22) in achm binder course (1") (minimum bid $120.00) (406412) | TON | 5 | $120.00 | $120.00 | $132.00 | $120.00 |
| 0028 | Mineral aggregate in achm surface course (1/2") (407162) | TON | 1,020 | $134.00 | $193.00 | $202.00 | $188.00 |
| 0029 | Asphalt binder (PG 64-22) in achm surface course (1/2") (minimum bid $120.00) (407432) | TON | 3 | $120.00 | $120.00 | $132.00 | $120.00 |
| 0030 | Asphalt binder (PG 76-22) in achm surface course (1/2") (minimum bid $120.00) (407452) | TON | 54 | $120.00 | $120.00 | $132.00 | $120.00 |
| 0031 | Cold milling asphalt pavement (412002) | SY | 1,917 | $5.20 | $6.00 | $5.50 | $12.55 |
| 0032 | Asphalt concrete patching for maintenance of traffic (414011) | TON | 8 | $164.00 | $360.00 | $385.00 | $400.00 |
| 0033 | Achm patching of existing roadway (415011) | TON | 8 | $211.00 | $360.00 | $385.00 | $450.00 |
| 0034 | Approach gutters (504264) | CY | 39.04 | $1,612.00 | $1,860.00 | $285.00 | $1,555.00 |
| 0035 | Portland cement concrete driveway (505011) | SY | 777.22 | $111.00 | $133.00 | $100.00 | $255.00 |
| 0036 | Furnishing field office (602011) | EACH | 1 | $69,911 | $43,000 | $37,500 | $120,000 |
| 0037 | Maintenance of traffic (603010) | LS | 1 | $190,670 | $158,700 | $135,000 | $185,000 |
| 0038 | 18" temporary culvert (603018) | LF | 58 | $115.00 | $148.70 | $75.00 | $65.00 |
| 0039 | 42" temporary culvert (603042) | LF | 28 | $260.00 | $344.60 | $140.00 | $200.00 |
| 0040 | Signs (604003) | SF | 500 | $19.00 | $16.00 | $16.50 | $20.25 |
| 0041 | Barricades (604013) | LF | 48 | $32.00 | $26.50 | $27.50 | $33.75 |
| 0042 | Traffic drums (604023) | EACH | 128 | $64.00 | $53.00 | $55.00 | $70.20 |
| 0043 | Furnishing and installing precast concrete barrier (604031) | LF | 140 | $114.00 | $60.60 | $35.00 | $60.00 |
| 0044 | Relocating precast concrete barrier (max. bid 25% of item number ) (604036) | LF | 120 | $28.00 | $15.15 | $8.75 | $15.00 |
| 0045 | Construction pavement markings (604041) | LF | 12,790 | $1.20 | $1.00 | $1.05 | $1.30 |
| 0046 | Removable construction pavement markings (604051) | LF | 840 | $5.40 | $4.50 | $4.68 | $5.00 |
| 0047 | Removal of construction pavement markings (604055) | LF | 8,520 | $1.30 | $1.00 | $1.10 | $1.30 |
| 0048 | Removal of permanent pavement markings (604061) | LF | 4,155 | $1.30 | $1.00 | $1.10 | $1.35 |
| 0049 | Concrete ditch paving (type A) (605011) | SY | 606 | $105.00 | $145.00 | $138.00 | $385.00 |
| 0050 | Concrete ditch paving (type B) (605012) | SY | 22 | $78.00 | $473.00 | $145.00 | $655.00 |
| 0051 | 18" reinforced concrete pipe culverts (class III) (605601) | LF | 126 | $150.00 | $118.90 | $120.00 | $155.00 |
| 0052 | 24" reinforced concrete pipe culverts (class III) (605606) | LF | 12 | $102.00 | $152.80 | $150.00 | $168.00 |
| 0053 | 48" reinforced concrete pipe culverts (class III) (605626) | LF | 8 | $304.00 | $398.00 | $205.00 | $210.00 |
| 0054 | 18" flared end sections for reinforced concrete pipe culverts (605856) | EACH | 3 | $1,233.00 | $2,015.00 | $2,500.00 | $3,500.00 |
| 0055 | 24" flared end sections for reinforced concrete pipe culverts (605858) | EACH | 1 | $1,950.00 | $2,387.00 | $5,000.00 | $4,000.00 |
| 0056 | 18" side drain (606703) | LF | 173 | $142.00 | $106.00 | $80.00 | $112.00 |
| 0057 | Selected pipe bedding (606994) | CY | 100 | $52.00 | $79.60 | $55.00 | $65.00 |
| 0058 | Drop inlets (type C) (609013) | EACH | 5 | $11,376 | $11,000 | $16,750 | $18,500 |
| 0059 | Drop inlets (type MO) (609134) | EACH | 7 | $4,772.00 | $9,000.00 | $12,500 | $12,600 |
| 0060 | Drop inlets (type ST) (609138) | EACH | 2 | $12,736 | $8,100.00 | $12,350 | $13,500 |
| 0061 | Junction boxes (type ST) (609236) | EACH | 1 | $9,941.00 | $23,000 | $13,135 | $16,450 |
| 0062 | Drop inlet extensions (4') (609311) | EACH | 6 | $2,415.00 | $1,539.00 | $1,865.00 | $8,500.00 |
| 0063 | Drop inlet extensions (8') (609312) | EACH | 4 | $3,831.00 | $3,077.00 | $2,800.00 | $15,000 |
| 0064 | Pavement repair over culverts (concrete) (615020) | CY | 18.30 | $713.00 | $188.00 | $550.00 | $388.00 |
| 0065 | Pavement repair over culverts (asphalt) (615022) | TON | 66 | $134.00 | $420.00 | $230.00 | $350.00 |
| 0066 | Guardrail (type A) (617005) | LF | 475 | $56.00 | $46.00 | $42.00 | $58.70 |
| 0067 | Guardrail terminal (type 2) (617312) | EACH | 4 | $6,392.00 | $4,475.00 | $2,650.00 | $5,695.00 |
| 0068 | Thrie beam guardrail terminal (617332) | EACH | 4 | $3,950.00 | $3,277.00 | $2,350.00 | $4,171.00 |
| 0069 | Lime (620001) | TON | 1 | $58.00 | $48.00 | $1,200.00 | $350.00 |
| 0070 | Seeding (620011) | ACRE | 0.50 | $3,628.00 | $3,010.00 | $5,000.00 | $1,800.00 |
| 0071 | Mulch cover (620022) | ACRE | 4.75 | $1,569.00 | $1,301.00 | $2,250.00 | $1,550.00 |
| 0072 | Water (620030) | MGAL | 250.60 | $13.00 | $10.60 | $10.00 | $10.00 |
| 0073 | Temporary seeding (621001) | ACRE | 4.25 | $1,119.00 | $928.00 | $210.00 | $980.00 |
| 0074 | Silt fence (621021) | LF | 1,858 | $4.80 | $3.90 | $4.25 | $4.65 |
| 0075 | Sand bag ditch checks (621031) | BAG | 110 | $17.00 | $14.30 | $12.00 | $150.00 |
| 0076 | Sediment removal and disposal (621111) | CY | 94 | $32.00 | $47.80 | $33.00 | $65.00 |
| 0077 | Rock ditch checks (621151) | CY | 81 | $91.00 | $122.00 | $145.00 | $88.00 |
| 0078 | Filter sock (12") (621168) | LF | 549 | $10.00 | $8.40 | $10.00 | $25.00 |
| 0079 | Second seeding application (623001) | ACRE | 0.50 | $1,004.00 | $833.00 | $500.00 | $750.00 |
| 0080 | Solid sodding (624001) | SY | 8,958 | $5.80 | $4.70 | $4.50 | $6.55 |
| 0081 | Concrete island (632011) | SY | 122 | $104.00 | $150.50 | $109.00 | $285.00 |
| 0082 | Concrete walks (633011) | SY | 321 | $76.00 | $119.00 | $105.00 | $275.00 |
| 0083 | Concrete walks (type special) (633017) | SY | 156 | $83.00 | $840.00 | $665.00 | $1,255.00 |
| 0084 | Hand railing (633201) | LF | 280 | $104.00 | $86.40 | $125.00 | $210.00 |
| 0085 | Concrete combination curb and gutter (type A) (1' 6") (634201) | LF | 2,065 | $44.00 | $29.00 | $30.80 | $65.00 |
| 0086 | Roadway construction control (635001) | LS | 1 | $48,174 | $75,000 | $105,000 | $120,000 |
| 0087 | Wheelchair ramps (type 3) (641020) | SY | 48 | $139.00 | $573.00 | $450.00 | $756.00 |
| 0088 | System local controller TS2-type 2 (8 phases) (701128) | EACH | 2 | $38,352 | $31,830 | $40,887 | $40,500 |
| 0089 | Traffic signal head, LED, (3 section, 1 way) (706039) | EACH | 16 | $1,790.00 | $1,485.00 | $1,661.00 | $1,890.00 |
| 0090 | Traffic signal head, LED, (4 section, 1 way) (706043) | EACH | 6 | $2,045.00 | $1,698.00 | $2,640.00 | $2,160.00 |
| 0091 | Relocation of traffic signal head (706103) | EACH | 6 | $447.00 | $371.00 | $275.00 | $472.50 |
| 0092 | Central control unit (707006) | EACH | 1 | $6,648.00 | $5,517.00 | $7,216.00 | $7,020.00 |
| 0093 | Pole mounted assembly (707007) | EACH | 8 | $1,278.00 | $1,061.00 | $1,980.00 | $1,350.00 |
| 0094 | Countdown pedestrian signal head, LED (707015) | EACH | 8 | $1,278.00 | $1,061.00 | $1,287.00 | $1,350.00 |
| 0095 | Traffic signal cable (5C/12 A.W.G.) (708007) | LF | 1,770 | $4.80 | $4.00 | $4.40 | $5.07 |
| 0096 | Traffic signal cable (5C/14 A.W.G.) (708008) | LF | 1,025 | $4.50 | $3.70 | $5.50 | $4.73 |
| 0097 | Traffic signal cable (7C/14 A.W.G.) (708012) | LF | 1,600 | $4.80 | $4.00 | $7.70 | $5.07 |
| 0098 | Traffic signal cable (20C/14 A.W.G.) (708038) | LF | 820 | $7.00 | $5.84 | $12.10 | $7.43 |
| 0099 | Electrical conductors-in-conduit (1C/8 A.W.G., E.G.C.) (708207) | LF | 825 | $2.60 | $2.10 | $264.00 | $2.70 |
| 0100 | Electrical conductors-in-conduit (1C/12 A.W.G., E.G.C.) (708211) | LF | 205 | $2.20 | $1.90 | $1.76 | $2.37 |
| 0101 | Electrical conductors-in-conduit (2C/6 A.W.G.) (708217) | LF | 85 | $6.40 | $5.30 | $11.00 | $6.75 |
| 0102 | Electrical conductors for luminaires (708451) | LF | 1,005 | $2.60 | $2.10 | $2.97 | $2.70 |
| 0103 | Galvanized steel conduit (2") (709004) | LF | 40 | $51.00 | $43.00 | $60.50 | $54.00 |
| 0104 | Galvanized steel conduit (3") (709005) | LF | 30 | $77.00 | $63.70 | $112.20 | $81.00 |
| 0105 | Non-metallic conduit (2") (710004) | LF | 125 | $23.00 | $19.00 | $35.75 | $24.30 |
| 0106 | Non-metallic conduit (3") (710005) | LF | 666 | $58.00 | $47.70 | $55.00 | $60.75 |
| 0107 | Concrete pull box (type 2) (711004) | EACH | 7 | $1,534.00 | $1,274.00 | $2,167.00 | $1,620.00 |
| 0108 | Concrete pull box (type 1 HD) (711104) | EACH | 1 | $2,876.00 | $2,387.00 | $1,859.00 | $3,038.00 |
| 0109 | Concrete pull box (type 2 HD) (711105) | EACH | 3 | $2,876.00 | $2,387.00 | $2,222.00 | $3,038.00 |
| 0110 | Span wire assembly (713011) | EACH | 1 | $8,310.00 | $6,897.00 | $24,750 | $8,775.00 |
| 0111 | Traffic signal mast arm and pole with foundation (36') (714036) | EACH | 1 | $48,579 | $40,317 | $36,971 | $51,300 |
| 0112 | Traffic signal mast arm and pole with foundation (42') (714042) | EACH | 1 | $53,692 | $44,561 | $41,338 | $56,700 |
| 0113 | Traffic signal mast arm and pole with foundation (44') (714044) | EACH | 1 | $56,249 | $46,683 | $41,525 | $59,400 |
| 0114 | Traffic signal mast arm and pole with foundation (48') (714048) | EACH | 1 | $61,363 | $50,927 | $44,968 | $64,800 |
| 0115 | LED luminaire assembly (714724) | EACH | 4 | $1,278.00 | $1,061.00 | $1,705.00 | $1,350.00 |
| 0116 | Traffic signal pedestal pole with foundation (715011) | EACH | 5 | $8,310.00 | $6,896.00 | $5,093.00 | $8,775.00 |
| 0117 | Service point assembly (2 circuits) (715102) | EACH | 2 | $5,753.00 | $4,774.00 | $6,501.00 | $6,075.00 |
| 0118 | Removal of traffic signal equipment (715704) | LS | 1 | $8,310.00 | $6,896.00 | $30,500 | $8,775.00 |
| 0119 | Treated wood pole (class 1, 45') (716145) | EACH | 2 | $10,227 | $8,487.00 | $13,530 | $10,800 |
| 0120 | Reflectorized paint pavement marking white (10") (718004) | LF | 200 | $2.60 | $2.10 | $2.20 | $2.70 |
| 0121 | Thermoplastic pavement marking white (6") (719002) | LF | 2,471 | $1.60 | $1.30 | $1.38 | $1.70 |
| 0122 | Thermoplastic pavement marking white (8") (719003) | LF | 462 | $3.80 | $3.10 | $3.30 | $4.05 |
| 0123 | Thermoplastic pavement marking white (12") (719005) | LF | 952 | $6.40 | $5.30 | $5.50 | $6.75 |
| 0124 | Thermoplastic pavement marking yellow (6") (719102) | LF | 3,142 | $1.60 | $1.30 | $1.38 | $1.69 |
| 0125 | Thermoplastic pavement marking (yield line) (719200) | LF | 40 | $32.00 | $26.50 | $27.50 | $33.75 |
| 0126 | Thermoplastic pavement marking (words) (719201) | EACH | 6 | $415.00 | $344.40 | $357.50 | $440.00 |
| 0127 | Thermoplastic pavement marking (arrows) (719202) | EACH | 9 | $479.00 | $398.00 | $359.70 | $506.00 |
| 0128 | Raised pavement markers (type II) (721002) | EACH | 33 | $13.00 | $10.60 | $11.00 | $13.55 |
| 0129 | 18" street name sign (726012) | EACH | 4 | $1,023.00 | $848.80 | $781.00 | $1,080.00 |
| 0130 | Temporary impact attenuation barrier (731071) | EACH | 2 | $9,588.00 | $7,957.00 | $8,250.00 | $10,125 |
| 0131 | Temporary impact attenuation barrier (repair) (731072) | EACH | 2 | $1,278.00 | $1,061.00 | $1,100.00 | $1,350.00 |
| 0132 | Video detector rotation (733005) | EACH | 2 | $447.00 | $371.00 | $715.00 | $472.50 |
| 0133 | Video detector (IP) (733008) | EACH | 6 | $5,114.00 | $4,243.00 | $5,456.00 | $5,400.00 |
| 0134 | Hybrid video/radar detector (733009) | EACH | 2 | $12,784 | $10,609 | $13,970 | $13,500 |
| 0135 | Video cable (exterior cat 5E) (733035) | LF | 1,765 | $5.10 | $4.30 | $3.30 | $5.40 |
| 0136 | Video monitor (CLR) (733042) | EACH | 2 | $1,278.00 | $1,061.00 | $1,705.00 | $1,350.00 |
| 0137 | Central control unit (8 channel) (733105) | EACH | 2 | $51,136 | $44,000 | $59,086 | $54,000 |
| 0138 | Unclassified excavation for structures-roadway (801101) | CY | 35 | $272.00 | $74.20 | $120.00 | $155.00 |
| 0139 | Class S concrete-roadway (802012) | CY | 65.37 | $2,196.00 | $1,900.00 | $1,850.00 | $885.00 |
| 0140 | Architectural finish (802229) | SF | 1,260 | $37.00 | $17.00 | $23.00 | $32.00 |
| 0141 | Textured coating finish (802951) | SY | 119 | $31.00 | $18.00 | $20.00 | $112.00 |
| 0142 | Reinforcing steel-roadway (grade 60) (804003) | LB | 11,536 | $1.50 | $3.50 | $2.80 | $6.50 |
| 0143 | 18" reinforced concrete pipe culverts (class III) (605601) | LF | 871 | $103.00 | $197.70 | $120.00 | $65.00 |
| 0145 | 18" flared end sections for reinforced concrete pipe culverts (605856) | EACH | 1 | $1,233.00 | $4,731.00 | $2,000.00 | $1,500.00 |
| 0147 | Mobilization (unit bid amount may not exceed 5% of subtotal) (601001) | LS | 1 | $111,846 | $165,000 | $115,000 | $251,000 |
The pay item list has one row per line (item, description, unit, quantity, the low bidder's unit price), the flat layout estimating software imports. Pay items with a page of their own open their price history.
Source
Read from ARDOT's tabulation for this contract. ARDOT monthly bid tab PDFs (morning and afternoon sessions), January 2022 to November 2026. Base bids are printed in whole dollars; on A+B and A+C jobs the base bid is kept, and the published rank follows the award amount.
Every contract let that day: ARDOT letting of November 5, 2025. Compiled by Mirage Metrics.
Your own bid history, read the same way
Mirage deploys AI agents for heavy civil estimating teams: quantities from the plan set, specs and addenda read, and bid tabs compared, inside your systems and your rules.