Robinson Construction, LLC: ARDOT bid record

Robinson Construction, LLC submitted 28 bids on Arkansas DOT contracts in the data, from 17 JAN 2024 to 12 AUG 2026, and was the low bidder on 8 of them (29%). When it was not low, its total sat a median +28% above the low bid.

Owner
Arkansas DOT
Low bid volume
$44,153,124
Latest bid
12 AUG 2026
Data through
04 NOV 2026
28Bids
8Low bids
29Win rate, percent
+28%Median gap to the low bid when not low, 20 bids

By year

YearBidsLow bidsWin rate
20245240%
202517635%
2026600%
Robinson Construction, LLC, ARDOT: bids and low bids by year of letting

By county

CountyBidsLow bidsWin rate
Sebastian8338%
Crawford7343%
Washington3133%
Benton3133%
Scott300%
Franklin200%
Sevier100%
Little River100%
Robinson Construction, LLC, ARDOT: bids and low bids by county

Pay items where it is most often lowest

Pay itemCodeUnitLines bidLowest on the lineIts median priceAll bidders' median
Asphalt binder (PG 64-22) in achm surface course (1/2") (minimum bid $120.00)407432TON1714 (82%)$120.00$120.00
Construction pavement markings604041LF209 (45%)$0.28$0.28
Mineral aggregate in achm surface course (1/2")407162TON228 (36%)$127.25$124.55
Removal and disposal of guardrail202132LF108 (80%)$6.00$10.00
Achm patching of existing roadway415011TON277 (26%)$255.00$250.00
Water620030MGAL107 (70%)$7.95$10.00
Tack coat401011GAL266 (23%)$4.12$3.75
Aggregate base course (class 7)303117TON216 (29%)$42.55$52.19
Raised pavement markers (type II)721002EACH206 (30%)$7.75$6.50
Seeding620011ACRE106 (60%)$1,517.50$1,500.00
Removal and disposal of pipe culverts202096EACH106 (60%)$540.00$1,100.00
Thermoplastic pavement marking yellow (6")719102LF185 (28%)$1.11$0.85
Robinson Construction, LLC, ARDOT: pay items where its unit price was the lowest on the line

A line counts when the firm priced it and at least one other bidder did too; the lowest unit price on the line counts whoever won the contract. Token prices and bids over three times the low bid are left out.

Who it meets most

Robinson Construction, LLC, ARDOT: the firms on the same contracts most often

Latest bids

LetContractCountyProjectRankIts bidAgainst the low bid
12 AUG 2026030531Little RiverTHE PURPOSE OF THIS PROJECT IS TO RAISE THE ROADWAY GRADE ON HIGHWAY 71 IN LITTLE RIVER COUNTY. THIS PROJECT CONSISTS OF CLEARING AND GRUBBI5 of 6$25,998,065+52%
20 MAY 2026SA6347ScottTHE PURPOSE OF THIS PROJECT IS TO OVERLAY APPROXIMATELY 1.57 MILES OF SWEET GUM LN. IN SCOTT COUNTY. THIS PROJECT CONSISTS OF STONE BACKFILL4 of 4$549,396+16%
08 APR 2026A40049CrawfordTHE PURPOSE OF THIS PROJECT IS TO MILL AND OVERLAY APPROXIMATELY 10.901 MILES OF HIGHWAY 64 IN CRAWFORD COUNTY. THIS PROJECT CONSISTS OF REM3 of 3$6,103,262+26%
08 APR 2026A40050ScottTHE PURPOSE OF THIS PROJECT IS TO MILL AND OVERLAY APPROXIMATELY 6.744 MILES OF HIGHWAYS 71, 71B, AND 272 IN SCOTT COUNTY. THIS PROJECT CONS4 of 4$3,971,577+21%
08 APR 2026C65018SebastianTHE PURPOSE OF THIS PROJECT IS TO OVERLAY APPROXIMATELY 2.02 MILES OF VARIOUS CITY STREETS IN THE CITY OF BARLING, APPROXIMATELY 1.37 MILES 4 of 4$1,191,518+26%
21 JAN 2026A40047WashingtonTHE PURPOSE OF THIS PROJECT IS TO MILL, OVERLAY, AND SCRUB SEAL APPROXIMATELY 12.878 MILES OF HIGHWAY 16 IN WASHINGTON COUNTY. THIS PROJECT 3 of 3$5,695,796+19%
05 NOV 2025A40048FranklinTHE PURPOSE OF THIS PROJECT IS TO MILL AND OVERLAY APPROXIMATELY 9.674 MILES OF HIGHWAYS 23, 64, AND 219 IN FRANKLIN COUNTY. THIS PROJECT CO5 of 5$5,077,819+39%
05 NOV 2025A40053FranklinTHE PURPOSE OF THIS PROJECT IS TO OVERLAY AND SCRUB SEAL APPROXIMATELY 6.142 MILES OF HIGHWAY 186 IN FRANKLIN COUNTY. THIS PROJECT CONSISTS 5 of 5$3,732,684+30%
05 NOV 2025090433BentonTHE PURPOSE OF THIS PROJECT IS TO CONSTRUCT A ROUNDABOUT ON HIGHWAY 264 IN BENTON COUNTY. THIS PROJECT CONSISTS OF CLEARING AND GRUBBING, RE4 of 4$6,745,687+93%
05 NOV 2025090651BentonTHE PURPOSE OF THIS PROJECT IS TO IMPROVE THE INTERSECTION AT HIGHWAYS 12 AND 59 IN BENTON COUNTY. THIS PROJECT CONSISTS OF CLEARING AND GRU4 of 4$5,285,263+61%
17 SEP 2025040889SebastianTHE PURPOSE OF THIS PROJECT IS TO CONSTRUCT IMPROVEMENTS TO I-540 INTERCHANGE RAMPS 3 AND 4, SOUTH 36TH STREET, AND HIGHWAY 255, ALONG WITH 2 of 2$6,351,530+88%
13 AUG 2025040885CrawfordTHE PURPOSE OF THIS PROJECT IS TO LEVEL WITH ACHM SURFACE COURSE AND NOTCH AND WIDEN APPROXIMATELY 0.131 MILES, WITH APPROXIMATELY 0.248 OF 1 of 5$3,574,041Low, 22% under the second
21 MAY 2025040714CrawfordTHE PURPOSE OF THIS PROJECT IS TO IMPROVE INTERCHANGE, ADD ROUNDABOUT AND RAMPS IMPROVEMENTS ON INTERSTATE 40 AND HIGHWAY 59 IN CRAWFORD COU1 of 2$14,763,529Low, -1.0% under the second
21 MAY 2025040866WashingtonTHE PURPOSE OF THIS PROJECT IS TO REPLACE THREE STRUCTURES ON HIGHWAY 45 IN WASHINGTON COUNTY. THIS PROJECT CONSISTS OF CLEARING AND GRUBBIN6 of 6$11,656,822+22%
09 APR 2025SA6346ScottTHE PURPOSE OF THIS PROJECT IS TO OVERLAY APPROXIMATELY 0.72 MILE OF COUNTY ROAD 300 IN SCOTT COUNTY. THIS PROJECT CONSISTS OF ACHM SURFACE 3 of 3$436,759+64%
09 APR 2025SA6650SevierTHE PURPOSE OF THIS PROJECT IS TO REPLACE A DRAINAGE STRUCTURE ON COUNTY ROAD 12 IN SEVIER COUNTY. THIS PROJECT CONSISTS OF STONE BACKFILL, 5 of 5$742,852+138%
26 FEB 2025A40040SebastianTHE PURPOSE OF THIS PROJECT IS TO MILL, OVERLAY, AND PLACE ULTRATHIN BONDED WEARING COURSE ON APPROXIMATELY 9.767 MILES OF HIGHWAYS 45 AND 21 of 3$3,745,972Low, 5.0% under the second
26 FEB 2025A40041WashingtonTHE PURPOSE OF THIS PROJECT IS TO MILL AND OVERLAY APPROXIMATELY 12.468 MILES OF HIGHWAY 62 IN WASHINGTON COUNTY. THIS PROJECT CONSISTS OF R1 of 4$4,987,983Low, 4.0% under the second
26 FEB 2025A40042CrawfordTHE PURPOSE OF THIS PROJECT IS TO MILL AND OVERLAY APPROXIMATELY 3.505 MILES OF HIGHWAYS 64 AND 162 IN CRAWFORD COUNTY. THIS PROJECT CONSIST1 of 3$2,381,285Low, 2.0% under the second
26 FEB 2025A90033BentonTHE PURPOSE OF THIS PROJECT IS TO MILL AND OVERLAY APPROXIMATELY 6.796 MILES OF HIGHWAYS 59 AND 59B IN BENTON COUNTY. THIS PROJECT CONSISTS 1 of 4$3,895,792Low, 3.0% under the second
15 JAN 2025A40038SebastianTHE PURPOSE OF THIS PROJECT IS TO MILL AND OVERLAY APPROXIMATELY 8.973 MILES OF HIGHWAYS 22 AND 64 IN FORT SMITH IN SEBASTIAN COUNTY. THIS P3 of 3$6,255,750+5.0%
15 JAN 2025C17013CrawfordTHE PURPOSE OF THIS PROJECT IS TO OVERLAY APPROXIMATELY 1.15 MILES OF VARIOUS CITY STREETS IN THE CITY OF ALMA IN CRAWFORD COUNTY. THIS PROJ4 of 5$377,392+12%
15 JAN 2025C65016SebastianTHE PURPOSE OF THIS PROJECT IS TO OVERLAY APPROXIMATELY 1.17 MILES OF VARIOUS CITY STREETS IN THE CITY OF GREENWOOD AND APPROXIMATELY 1.02 M2 of 5$599,497+10%
06 NOV 2024A40037CrawfordTHE PURPOSE OF THIS PROJECT IS TO MILL AND OVERLAY APPROXIMATELY 4.180 MILES OF HIGHWAY 71 IN CRAWFORD COUNTY. THIS PROJECT CONSISTS OF AGGR3 of 3$3,414,434+41%
18 SEP 2024040792SebastianTHE PURPOSE OF THIS PROJECT IS TO REPLACE THREE STRUCTURES ON HIGHWAY 45 IN SEBASTIAN COUNTY. THIS PROJECT CONSISTS OF CLEARING AND GRUBBING1 of 2$10,396,252Low, 15% under the second
Robinson Construction, LLC: latest ARDOT bids in the data

How this record was read

ARDOT monthly bid tab PDFs (morning and afternoon sessions), January 2022 to November 2026. Base bids are printed in whole dollars; on A+B and A+C jobs the base bid is kept, and the published rank follows the award amount.

  • Every bid counted here matched its published total to within one dollar; ARDOT's rank decides who was low.
  • The gap to the low bid is the firm's total over the low total, minus one, on contracts it did not win, leaving out bids over three times the low bid.
  • A record covers the lettings in the data, not every contract the firm ever bid. Coverage by year is on the state page.

A name split in two, or a figure that does not match the owner's tabulation? Write to mehdi@miragemetrics.com and we correct it.

Your own bid history, read the same way

Mirage deploys AI agents for heavy civil estimating teams: quantities from the plan set, specs and addenda read, and bid tabs compared, inside your systems and your rules.