Robinson Construction, LLC submitted 28 bids on Arkansas DOT contracts in the data, from 17 JAN 2024 to 12 AUG 2026, and was the low bidder on 8 of them (29%). When it was not low, its total sat a median +28% above the low bid.
- Owner
- Arkansas DOT
- Low bid volume
- $44,153,124
- Latest bid
- 12 AUG 2026
- Data through
- 04 NOV 2026
By year
| Year | Bids | Low bids | Win rate |
|---|---|---|---|
| 2024 | 5 | 2 | 40% |
| 2025 | 17 | 6 | 35% |
| 2026 | 6 | 0 | 0% |
By county
| County | Bids | Low bids | Win rate |
|---|---|---|---|
| Sebastian | 8 | 3 | 38% |
| Crawford | 7 | 3 | 43% |
| Washington | 3 | 1 | 33% |
| Benton | 3 | 1 | 33% |
| Scott | 3 | 0 | 0% |
| Franklin | 2 | 0 | 0% |
| Sevier | 1 | 0 | 0% |
| Little River | 1 | 0 | 0% |
Pay items where it is most often lowest
| Pay item | Code | Unit | Lines bid | Lowest on the line | Its median price | All bidders' median |
|---|---|---|---|---|---|---|
| Asphalt binder (PG 64-22) in achm surface course (1/2") (minimum bid $120.00) | 407432 | TON | 17 | 14 (82%) | $120.00 | $120.00 |
| Construction pavement markings | 604041 | LF | 20 | 9 (45%) | $0.28 | $0.28 |
| Mineral aggregate in achm surface course (1/2") | 407162 | TON | 22 | 8 (36%) | $127.25 | $124.55 |
| Removal and disposal of guardrail | 202132 | LF | 10 | 8 (80%) | $6.00 | $10.00 |
| Achm patching of existing roadway | 415011 | TON | 27 | 7 (26%) | $255.00 | $250.00 |
| Water | 620030 | MGAL | 10 | 7 (70%) | $7.95 | $10.00 |
| Tack coat | 401011 | GAL | 26 | 6 (23%) | $4.12 | $3.75 |
| Aggregate base course (class 7) | 303117 | TON | 21 | 6 (29%) | $42.55 | $52.19 |
| Raised pavement markers (type II) | 721002 | EACH | 20 | 6 (30%) | $7.75 | $6.50 |
| Seeding | 620011 | ACRE | 10 | 6 (60%) | $1,517.50 | $1,500.00 |
| Removal and disposal of pipe culverts | 202096 | EACH | 10 | 6 (60%) | $540.00 | $1,100.00 |
| Thermoplastic pavement marking yellow (6") | 719102 | LF | 18 | 5 (28%) | $1.11 | $0.85 |
A line counts when the firm priced it and at least one other bidder did too; the lowest unit price on the line counts whoever won the contract. Token prices and bids over three times the low bid are left out.
Who it meets most
| Firm | Contracts in common | That firm ranked ahead |
|---|---|---|
| Emery Sapp & Sons, Inc. | 19 | 13 of 19 |
| Forsgren, Inc. | 17 | 11 of 17 |
| Apac-Central, Inc. | 9 | 5 of 9 |
| Grant Garrett Excavating, Inc. | 8 | 5 of 8 |
| McKenzie Asphalt, LLC | 5 | 4 of 5 |
| Blackstone Construction, LLC | 5 | 5 of 5 |
| Mobley Contractors, Inc. | 3 | 2 of 3 |
| Redstone Construction Group, Inc. | 2 | 2 of 2 |
| McGeorge Contracting Co., Inc. | 2 | 1 of 2 |
| Tri State Asphalt, Inc. | 1 | 1 of 1 |
Latest bids
| Let | Contract | County | Project | Rank | Its bid | Against the low bid |
|---|---|---|---|---|---|---|
| 12 AUG 2026 | 030531 | Little River | THE PURPOSE OF THIS PROJECT IS TO RAISE THE ROADWAY GRADE ON HIGHWAY 71 IN LITTLE RIVER COUNTY. THIS PROJECT CONSISTS OF CLEARING AND GRUBBI | 5 of 6 | $25,998,065 | +52% |
| 20 MAY 2026 | SA6347 | Scott | THE PURPOSE OF THIS PROJECT IS TO OVERLAY APPROXIMATELY 1.57 MILES OF SWEET GUM LN. IN SCOTT COUNTY. THIS PROJECT CONSISTS OF STONE BACKFILL | 4 of 4 | $549,396 | +16% |
| 08 APR 2026 | A40049 | Crawford | THE PURPOSE OF THIS PROJECT IS TO MILL AND OVERLAY APPROXIMATELY 10.901 MILES OF HIGHWAY 64 IN CRAWFORD COUNTY. THIS PROJECT CONSISTS OF REM | 3 of 3 | $6,103,262 | +26% |
| 08 APR 2026 | A40050 | Scott | THE PURPOSE OF THIS PROJECT IS TO MILL AND OVERLAY APPROXIMATELY 6.744 MILES OF HIGHWAYS 71, 71B, AND 272 IN SCOTT COUNTY. THIS PROJECT CONS | 4 of 4 | $3,971,577 | +21% |
| 08 APR 2026 | C65018 | Sebastian | THE PURPOSE OF THIS PROJECT IS TO OVERLAY APPROXIMATELY 2.02 MILES OF VARIOUS CITY STREETS IN THE CITY OF BARLING, APPROXIMATELY 1.37 MILES | 4 of 4 | $1,191,518 | +26% |
| 21 JAN 2026 | A40047 | Washington | THE PURPOSE OF THIS PROJECT IS TO MILL, OVERLAY, AND SCRUB SEAL APPROXIMATELY 12.878 MILES OF HIGHWAY 16 IN WASHINGTON COUNTY. THIS PROJECT | 3 of 3 | $5,695,796 | +19% |
| 05 NOV 2025 | A40048 | Franklin | THE PURPOSE OF THIS PROJECT IS TO MILL AND OVERLAY APPROXIMATELY 9.674 MILES OF HIGHWAYS 23, 64, AND 219 IN FRANKLIN COUNTY. THIS PROJECT CO | 5 of 5 | $5,077,819 | +39% |
| 05 NOV 2025 | A40053 | Franklin | THE PURPOSE OF THIS PROJECT IS TO OVERLAY AND SCRUB SEAL APPROXIMATELY 6.142 MILES OF HIGHWAY 186 IN FRANKLIN COUNTY. THIS PROJECT CONSISTS | 5 of 5 | $3,732,684 | +30% |
| 05 NOV 2025 | 090433 | Benton | THE PURPOSE OF THIS PROJECT IS TO CONSTRUCT A ROUNDABOUT ON HIGHWAY 264 IN BENTON COUNTY. THIS PROJECT CONSISTS OF CLEARING AND GRUBBING, RE | 4 of 4 | $6,745,687 | +93% |
| 05 NOV 2025 | 090651 | Benton | THE PURPOSE OF THIS PROJECT IS TO IMPROVE THE INTERSECTION AT HIGHWAYS 12 AND 59 IN BENTON COUNTY. THIS PROJECT CONSISTS OF CLEARING AND GRU | 4 of 4 | $5,285,263 | +61% |
| 17 SEP 2025 | 040889 | Sebastian | THE PURPOSE OF THIS PROJECT IS TO CONSTRUCT IMPROVEMENTS TO I-540 INTERCHANGE RAMPS 3 AND 4, SOUTH 36TH STREET, AND HIGHWAY 255, ALONG WITH | 2 of 2 | $6,351,530 | +88% |
| 13 AUG 2025 | 040885 | Crawford | THE PURPOSE OF THIS PROJECT IS TO LEVEL WITH ACHM SURFACE COURSE AND NOTCH AND WIDEN APPROXIMATELY 0.131 MILES, WITH APPROXIMATELY 0.248 OF | 1 of 5 | $3,574,041 | Low, 22% under the second |
| 21 MAY 2025 | 040714 | Crawford | THE PURPOSE OF THIS PROJECT IS TO IMPROVE INTERCHANGE, ADD ROUNDABOUT AND RAMPS IMPROVEMENTS ON INTERSTATE 40 AND HIGHWAY 59 IN CRAWFORD COU | 1 of 2 | $14,763,529 | Low, -1.0% under the second |
| 21 MAY 2025 | 040866 | Washington | THE PURPOSE OF THIS PROJECT IS TO REPLACE THREE STRUCTURES ON HIGHWAY 45 IN WASHINGTON COUNTY. THIS PROJECT CONSISTS OF CLEARING AND GRUBBIN | 6 of 6 | $11,656,822 | +22% |
| 09 APR 2025 | SA6346 | Scott | THE PURPOSE OF THIS PROJECT IS TO OVERLAY APPROXIMATELY 0.72 MILE OF COUNTY ROAD 300 IN SCOTT COUNTY. THIS PROJECT CONSISTS OF ACHM SURFACE | 3 of 3 | $436,759 | +64% |
| 09 APR 2025 | SA6650 | Sevier | THE PURPOSE OF THIS PROJECT IS TO REPLACE A DRAINAGE STRUCTURE ON COUNTY ROAD 12 IN SEVIER COUNTY. THIS PROJECT CONSISTS OF STONE BACKFILL, | 5 of 5 | $742,852 | +138% |
| 26 FEB 2025 | A40040 | Sebastian | THE PURPOSE OF THIS PROJECT IS TO MILL, OVERLAY, AND PLACE ULTRATHIN BONDED WEARING COURSE ON APPROXIMATELY 9.767 MILES OF HIGHWAYS 45 AND 2 | 1 of 3 | $3,745,972 | Low, 5.0% under the second |
| 26 FEB 2025 | A40041 | Washington | THE PURPOSE OF THIS PROJECT IS TO MILL AND OVERLAY APPROXIMATELY 12.468 MILES OF HIGHWAY 62 IN WASHINGTON COUNTY. THIS PROJECT CONSISTS OF R | 1 of 4 | $4,987,983 | Low, 4.0% under the second |
| 26 FEB 2025 | A40042 | Crawford | THE PURPOSE OF THIS PROJECT IS TO MILL AND OVERLAY APPROXIMATELY 3.505 MILES OF HIGHWAYS 64 AND 162 IN CRAWFORD COUNTY. THIS PROJECT CONSIST | 1 of 3 | $2,381,285 | Low, 2.0% under the second |
| 26 FEB 2025 | A90033 | Benton | THE PURPOSE OF THIS PROJECT IS TO MILL AND OVERLAY APPROXIMATELY 6.796 MILES OF HIGHWAYS 59 AND 59B IN BENTON COUNTY. THIS PROJECT CONSISTS | 1 of 4 | $3,895,792 | Low, 3.0% under the second |
| 15 JAN 2025 | A40038 | Sebastian | THE PURPOSE OF THIS PROJECT IS TO MILL AND OVERLAY APPROXIMATELY 8.973 MILES OF HIGHWAYS 22 AND 64 IN FORT SMITH IN SEBASTIAN COUNTY. THIS P | 3 of 3 | $6,255,750 | +5.0% |
| 15 JAN 2025 | C17013 | Crawford | THE PURPOSE OF THIS PROJECT IS TO OVERLAY APPROXIMATELY 1.15 MILES OF VARIOUS CITY STREETS IN THE CITY OF ALMA IN CRAWFORD COUNTY. THIS PROJ | 4 of 5 | $377,392 | +12% |
| 15 JAN 2025 | C65016 | Sebastian | THE PURPOSE OF THIS PROJECT IS TO OVERLAY APPROXIMATELY 1.17 MILES OF VARIOUS CITY STREETS IN THE CITY OF GREENWOOD AND APPROXIMATELY 1.02 M | 2 of 5 | $599,497 | +10% |
| 06 NOV 2024 | A40037 | Crawford | THE PURPOSE OF THIS PROJECT IS TO MILL AND OVERLAY APPROXIMATELY 4.180 MILES OF HIGHWAY 71 IN CRAWFORD COUNTY. THIS PROJECT CONSISTS OF AGGR | 3 of 3 | $3,414,434 | +41% |
| 18 SEP 2024 | 040792 | Sebastian | THE PURPOSE OF THIS PROJECT IS TO REPLACE THREE STRUCTURES ON HIGHWAY 45 IN SEBASTIAN COUNTY. THIS PROJECT CONSISTS OF CLEARING AND GRUBBING | 1 of 2 | $10,396,252 | Low, 15% under the second |
How this record was read
ARDOT monthly bid tab PDFs (morning and afternoon sessions), January 2022 to November 2026. Base bids are printed in whole dollars; on A+B and A+C jobs the base bid is kept, and the published rank follows the award amount.
- Every bid counted here matched its published total to within one dollar; ARDOT's rank decides who was low.
- The gap to the low bid is the firm's total over the low total, minus one, on contracts it did not win, leaving out bids over three times the low bid.
- A record covers the lettings in the data, not every contract the firm ever bid. Coverage by year is on the state page.
A name split in two, or a figure that does not match the owner's tabulation? Write to mehdi@miragemetrics.com and we correct it.