ARDOT contract C65018 bid tabulation

THE PURPOSE OF THIS PROJECT IS TO OVERLAY APPROXIMATELY 2.02 MILES OF VARIOUS CITY STREETS IN THE CITY OF BARLING, APPROXIMATELY 1.37 MILES OF VARIOUS CITY STREETS IN THE CITY OF HARTFORD, AND APPROXIMATELY 2.57 MILES IN THE CITY OF MIDLAND IN SEBASTIAN COUNTY. THIS PROJECT CONSISTS OF ACHM SURFACE COURSE, COLD MILLING ASPHALT PAVEMENT, ACHM PATCHING OF EXISTING ROADWAY, MAINTENANCE OF TRAFFIC, WHEELCHAIR RAMPS, AND MISC. ITEMS. Let by Arkansas DOT on April 8, 2026, Sebastian. 4 bids received; low bid $944,621 by Emery Sapp & Sons, Inc..

Owner
Arkansas DOT
Letting
08 APR 2026
Pay items
10
Data through
04 NOV 2026

Bidders

RankBidderTotal bidAgainst the low bid
1Emery Sapp & Sons, Inc.$944,621Low
2Forsgren, Inc.$1,052,577+11%
3McKenzie Asphalt, LLC$1,075,401+14%
4Robinson Construction, LLC$1,191,518+26%
ARDOT contract C65018: bids by rank

Bid tabulation

LinePay itemUnitQuantity1. Emery Sapp & Sons, Inc.2. Forsgren, Inc.3. McKenzie Asphalt, LLC4. Robinson Construction, LLC
0001Removal and disposal of curb (202001)LF14$300.24$23.00$50.00$265.00
0002Tack coat (401011)GAL6,346$3.38$3.00$3.75$4.50
0003Mineral aggregate in achm surface course (3/8") (407161)TON6,828$109.11$119.90$125.90$126.50
0004Asphalt binder (PG 64-22) in achm surface course (3/8") (minimum bid $120.00) (407431)TON467$120.00$120.00$120.00$120.00
0005Cold milling asphalt pavement (412001)SY15,657$1.66$3.10$2.56$4.20
0006Achm patching of existing roadway (415011)TON360$145.52$180.00$175.00$245.00
0007Maintenance of traffic (603009)LS1$14,928$18,000$5,000.00$35,000
0008Signs (604003)SF648$7.84$7.35$7.00$7.70
0009Wheelchair ramps (type 3) (641014)SY4$1,680.42$350.00$400.00$1,880.00
0010Mobilization (unit bid amount may not exceed 5% of subtotal) (601001)LS1$12,817$21,000$21,000$38,000
ARDOT contract C65018: unit prices by line

The pay item list has one row per line (item, description, unit, quantity, the low bidder's unit price), the flat layout estimating software imports. Pay items with a page of their own open their price history.

Source

Read from ARDOT's tabulation for this contract. ARDOT monthly bid tab PDFs (morning and afternoon sessions), January 2022 to November 2026. Base bids are printed in whole dollars; on A+B and A+C jobs the base bid is kept, and the published rank follows the award amount.

Every contract let that day: ARDOT letting of April 8, 2026. Compiled by Mirage Metrics.

Your own bid history, read the same way

Mirage deploys AI agents for heavy civil estimating teams: quantities from the plan set, specs and addenda read, and bid tabs compared, inside your systems and your rules.

We use your email to reply to you and, now and then, to tell you about Mirage. You can opt out at any time. Privacy policy