Emery Sapp & Sons, Inc.: ARDOT bid record
Emery Sapp & Sons, Inc. submitted 103 bids on Arkansas DOT contracts in the data, from 12 JAN 2022 to 04 NOV 2026, and was the low bidder on 43 of them (42%). When it was not low, its total sat a median +11% above the low bid.
- Owner
- Arkansas DOT
- Low bid volume
- $340,769,256
- Latest bid
- 04 NOV 2026
- Data through
- 04 NOV 2026
By year
| Year | Bids | Low bids | Win rate |
|---|---|---|---|
| 2022 | 13 | 6 | 46% |
| 2023 | 20 | 11 | 55% |
| 2024 | 23 | 11 | 48% |
| 2025 | 26 | 7 | 27% |
| 2026 | 21 | 8 | 38% |
By county
| County | Bids | Low bids | Win rate |
|---|---|---|---|
| Benton | 26 | 9 | 35% |
| Washington | 17 | 6 | 35% |
| Carroll | 9 | 7 | 78% |
| Crawford | 9 | 3 | 33% |
| Sebastian | 9 | 5 | 56% |
| Madison | 4 | 3 | 75% |
| Franklin | 4 | 3 | 75% |
| Logan | 3 | 0 | 0% |
| Johnson | 2 | 1 | 50% |
| Boone | 2 | 0 | 0% |
| Scott | 2 | 0 | 0% |
| Carroll, Madison | 2 | 0 | 0% |
Pay items where it is most often lowest
| Pay item | Code | Unit | Lines bid | Lowest on the line | Its median price | All bidders' median |
|---|---|---|---|---|---|---|
| Asphalt binder (PG 64-22) in achm surface course (3/8") (minimum bid $120.00) | 407431 | TON | 32 | 32 (100%) | $120.00 | $120.00 |
| Cold milling asphalt pavement | 412002 | SY | 44 | 26 (59%) | $4.70 | $8.00 |
| Asphalt binder (PG 64-22) in achm surface course (1/2") (minimum bid $120.00) | 407432 | TON | 29 | 26 (90%) | $120.00 | $120.00 |
| Achm patching of existing roadway | 415011 | TON | 72 | 24 (33%) | $261.53 | $250.00 |
| Signs | 604003 | SF | 91 | 20 (22%) | $18.04 | $8.40 |
| Tack coat | 401011 | GAL | 65 | 16 (25%) | $4.00 | $3.75 |
| Mineral aggregate in achm surface course (3/8") | 407161 | TON | 36 | 16 (44%) | $127.69 | $124.22 |
| Cold milling asphalt pavement | 412001 | SY | 21 | 16 (76%) | $6.40 | $10.89 |
| Asphalt binder (PG 70-22) in achm surface course (1/2") (minimum bid $120.00) | 407442 | TON | 17 | 16 (94%) | $120.00 | $120.00 |
| Aggregate base course (class 7) | 303117 | TON | 36 | 13 (36%) | $44.73 | $52.19 |
| Asphalt binder (PG 76-22) in achm surface course (1/2") (minimum bid $120.00) | 407452 | TON | 13 | 11 (85%) | $120.00 | $120.00 |
| Mineral aggregate in achm surface course (1/2") | 407162 | TON | 45 | 10 (22%) | $129.14 | $124.55 |
A line counts when the firm priced it and at least one other bidder did too; the lowest unit price on the line counts whoever won the contract. Token prices and bids over three times the low bid are left out.
Who it meets most
| Firm | Contracts in common | That firm ranked ahead |
|---|---|---|
| Apac-Central, Inc. | 53 | 26 of 53 |
| Grant Garrett Excavating, Inc. | 27 | 11 of 27 |
| Forsgren, Inc. | 20 | 7 of 20 |
| Robinson Construction, LLC | 19 | 6 of 19 |
| McKenzie Asphalt, LLC | 8 | 0 of 8 |
| Blackstone Construction, LLC | 7 | 5 of 7 |
| Atlas Asphalt, Inc. | 7 | 4 of 7 |
| Diamond Surface, Inc. | 6 | 3 of 6 |
| Salt Creek Paving & Const. Co., Inc. | 6 | 4 of 6 |
| Interstate Improvement, Inc. | 4 | 2 of 4 |
Latest bids
| Let | Contract | County | Project | Rank | Its bid | Against the low bid |
|---|---|---|---|---|---|---|
| 04 NOV 2026 | 040904 | Crawford | THE PURPOSE OF THIS PROJECT IS TO CONSTRUCT GRADING AND STRUCTURES OF A FOUR - LANE INTERSTATE FACILITY, INCLUDING IMPROVEMENTS TO THE INTER | 2 of 4 | $148,974,282 | +20% |
| 04 NOV 2026 | A90051 | Carroll, Madison | THE PURPOSE OF THIS PROJECT IS TO MILL AND OVERLAY APPROXIMATELY 11.203 MILES OF HIGHWAY 412 IN CARROLL AND MADISON COUNTIES. THIS PROJECT C | 3 of 3 | $6,611,445 | +55% |
| 12 AUG 2026 | A30046 | Miller | THE PURPOSE OF THIS PROJECT IS TO DO A CONCRETE PAVEMENT REPAIR ON INTERSTATE 30 IN MILLER COUNTY. THIS PROJECT CONSISTS OF REMOVAL AND DISP | 1 of 4 | $1,295,377 | Low, 14% under the second |
| 24 JUN 2026 | A40056 | Washington | THE PURPOSE OF THIS PROJECT IS TO OVERLAY WITH SILANE PROTECTIVE SURFACE TREATMENT ON APPROXIMATELY 0.30 MILE OF INTERSTATE 49 IN WASHINGTON | 1 of 2 | $623,598 | Low, 32% under the second |
| 24 JUN 2026 | A90046 | Benton | THE PURPOSE OF THIS PROJECT IS TO MILL AND INLAY APPROXIMATELY 2.909 MILES OF HIGHWAY 71B IN BENTON COUNTY. THIS PROJECT CONSISTS OF ACHM SU | 2 of 3 | $1,910,654 | +11% |
| 20 MAY 2026 | SA0449 | Benton | THE PURPOSE OF THIS PROJECT IS TO OVERLAY APPROXIMATELY 3.02 MILES OF W. MOUNTAIN RD. AND CARLTON DR. IN BENTON COUNTY. THIS PROJECT CONSIST | 2 of 4 | $593,113 | +7.0% |
| 20 MAY 2026 | SA5352 | Perry | THE PURPOSE OF THIS PROJECT IS TO SURFACE APPROXIMATELY 1.70 MILES OF BLUE JAY HOLLOW RD. IN PERRY COUNTY. THIS PROJECT CONSISTS OF DOUBLE A | 2 of 2 | $195,047 | +2.0% |
| 08 APR 2026 | A40049 | Crawford | THE PURPOSE OF THIS PROJECT IS TO MILL AND OVERLAY APPROXIMATELY 10.901 MILES OF HIGHWAY 64 IN CRAWFORD COUNTY. THIS PROJECT CONSISTS OF REM | 2 of 3 | $4,972,162 | +3.0% |
| 08 APR 2026 | A40050 | Scott | THE PURPOSE OF THIS PROJECT IS TO MILL AND OVERLAY APPROXIMATELY 6.744 MILES OF HIGHWAYS 71, 71B, AND 272 IN SCOTT COUNTY. THIS PROJECT CONS | 2 of 4 | $3,434,864 | +5.0% |
| 08 APR 2026 | A80045 | Logan | THE PURPOSE OF THIS PROJECT IS TO OVERLAY APPROXIMATELY 10.267 MILES OF HIGHWAYS 109 AND 393 IN LOGAN COUNTY. THIS PROJECT CONSISTS OF REMOV | 2 of 3 | $5,903,961 | +12% |
| 08 APR 2026 | 090742 | Various | THE PURPOSE OF THIS PROJECT IS TO PLACE ULTRATHIN BONDED WEARING COURSE ON APPROXIMATELY 12.909 MILES ON VARIOUS ROUTES IN VARIOUS COUNTIES | 1 of 1 | $2,155,659 | Low |
| 08 APR 2026 | A90040 | Carroll | THE PURPOSE OF THIS PROJECT IS TO MILL AND OVERLAY APPROXIMATELY 12.132 MILES OF HIGHWAY 62 IN CARROLL COUNTY. THIS PROJECT CONSISTS OF REMO | 1 of 1 | $6,964,662 | Low |
| 08 APR 2026 | A00093 | Clay | THE PURPOSE OF THIS PROJECT IS TO OVERLAY AND PLACE ULTRATHIN BONDED WEARING COURSE ON APPROXIMATELY 13.921 MILES OF HIGHWAY 62 IN CLAY COUN | 3 of 4 | $6,623,904 | +36% |
| 08 APR 2026 | C65018 | Sebastian | THE PURPOSE OF THIS PROJECT IS TO OVERLAY APPROXIMATELY 2.02 MILES OF VARIOUS CITY STREETS IN THE CITY OF BARLING, APPROXIMATELY 1.37 MILES | 1 of 4 | $944,621 | Low, 11% under the second |
| 04 MAR 2026 | C05011 | Boone | THE PURPOSE OF THIS PROJECT IS TO OVERLAY APPROXIMATELY 1.86 MILES OF VARIOUS CITY STREETS IN THE CITY OF ALPENA IN BOONE COUNTY. THIS PROJE | 2 of 3 | $205,617 | +10% |
| 04 MAR 2026 | C08012 | Carroll | THE PURPOSE OF THIS PROJECT IS TO OVERLAY APPROXIMATELY 1.46 MILES OF CITY STREETS IN GREEN FOREST IN CARROLL COUNTY. THIS PROJECT CONSISTS | 1 of 3 | $289,537 | Low, 3.0% under the second |
| 04 MAR 2026 | SA3657 | Johnson | THE PURPOSE OF THIS PROJECT IS TO SURFACE AND RESEAL APPROXIMATELY 10.49 MILES ON VARIOUS COUNTY ROADS IN JOHNSON COUNTY. THIS PROJECT CONSI | 1 of 4 | $509,344 | Low, 11% under the second |
| 04 MAR 2026 | SA7542 | Yell | THE PURPOSE OF THIS PROJECT IS TO SURFACE APPROXIMATELY 2.00 MILES OF ALPHA RD. IN YELL COUNTY. THIS PROJECT CONSISTS OF CEMENT IN CEMENT TR | 2 of 2 | $610,649 | +25% |
| 21 JAN 2026 | A90043 | Carroll, Madison | THE PURPOSE OF THIS PROJECT IS TO OVERLAY APPROXIMATELY 20.315 MILES OF HIGHWAY 412 IN CARROLL AND MADISON COUNTIES. THIS PROJECT CONSISTS O | 2 of 2 | $8,213,795 | +12% |
| 21 JAN 2026 | C04029 | Benton | THE PURPOSE OF THIS PROJECT IS TO OVERLAY APPROXIMATELY 1.12 MILES OF VARIOUS CITY STREETS IN THE CITY OF BELLA VISTA & 2.25 MILES IN THE CI | 1 of 4 | $532,629 | Low, 2.0% under the second |
| 21 JAN 2026 | C42007 | Logan | THE PURPOSE OF THIS PROJECT IS TO OVERLAY AND SURFACE APPROXIMATELY 1.23 MILES OF VARIOUS CITY STREETS IN THE CITY OF BLUE MOUNTAIN, OVERLAY | 2 of 4 | $731,914 | +2.0% |
| 05 NOV 2025 | A40048 | Franklin | THE PURPOSE OF THIS PROJECT IS TO MILL AND OVERLAY APPROXIMATELY 9.674 MILES OF HIGHWAYS 23, 64, AND 219 IN FRANKLIN COUNTY. THIS PROJECT CO | 2 of 5 | $3,976,119 | +9.0% |
| 05 NOV 2025 | A40053 | Franklin | THE PURPOSE OF THIS PROJECT IS TO OVERLAY AND SCRUB SEAL APPROXIMATELY 6.142 MILES OF HIGHWAY 186 IN FRANKLIN COUNTY. THIS PROJECT CONSISTS | 1 of 5 | $2,865,278 | Low, 5.0% under the second |
| 05 NOV 2025 | 090433 | Benton | THE PURPOSE OF THIS PROJECT IS TO CONSTRUCT A ROUNDABOUT ON HIGHWAY 264 IN BENTON COUNTY. THIS PROJECT CONSISTS OF CLEARING AND GRUBBING, RE | 3 of 4 | $4,802,599 | +38% |
| 15 OCT 2025 | 040746 | Washington | THE PURPOSE OF THIS PROJECT IS TO WIDEN APPROXIMATELY 1.431 MILES OF HIGHWAY 112, CONSTRUCT A PEDESTRIAN TUNNEL, CONSTRUCT THREE ROUNDABOUTS | 3 of 3 | $52,476,461 | +19% |
How this record was read
ARDOT monthly bid tab PDFs (morning and afternoon sessions), January 2022 to November 2026. Base bids are printed in whole dollars; on A+B and A+C jobs the base bid is kept, and the published rank follows the award amount.
- Every bid counted here matched its published total to within one dollar; ARDOT's rank decides who was low.
- The gap to the low bid is the firm's total over the low total, minus one, on contracts it did not win, leaving out bids over three times the low bid.
- A record covers the lettings in the data, not every contract the firm ever bid. Coverage by year is on the state page.
A name split in two, or a figure that does not match the owner's tabulation? Write to mehdi@miragemetrics.com and we correct it.
Your own bid history, read the same way
Mirage deploys AI agents for heavy civil estimating teams: quantities from the plan set, specs and addenda read, and bid tabs compared, inside your systems and your rules.