ARDOT contract A40056 bid tabulation

THE PURPOSE OF THIS PROJECT IS TO OVERLAY WITH SILANE PROTECTIVE SURFACE TREATMENT ON APPROXIMATELY 0.30 MILE OF INTERSTATE 49 IN WASHINGTON COUNTY. THIS PROJECT CONSISTS OF JOINT REHABILITATION, MAINTENANCE OF TRAFFIC, PAVEMENT MARKING, SILANE PROTECTIVE SURFACE TREATMENT, AND MISC. ITEMS. Let by Arkansas DOT on June 24, 2026, Washington. 2 bids received; low bid $623,598 by Emery Sapp & Sons, Inc..

Owner
Arkansas DOT
Letting
24 JUN 2026
Pay items
16
Data through
04 NOV 2026

Bidders

RankBidderTotal bidAgainst the low bid
1Emery Sapp & Sons, Inc.$623,598Low
2Ti-Zack Concrete, LLC$821,277+32%
ARDOT contract A40056: bids by rank

Bid tabulation

LinePay itemUnitQuantity1. Emery Sapp & Sons, Inc.2. Ti-Zack Concrete, LLC
0001Joint rehabilitation (type A) (509001)LF6,360$7.00$16.50
0002Joint rehabilitation (type B) (509002)LF9,540$6.50$16.50
0003Maintenance of traffic (603010)LS1$98,000$42,124
0004Signs (604003)SF1,017$17.00$18.75
0005Traffic drums (604023)EACH95$85.00$93.75
0006Construction pavement markings (604041)LF7,128$4.75$5.00
0007Advance warning arrow panel (604071)DAY16$24.00$25.00
0008Portable changeable message sign (604078)WEEK5$450.00$437.50
0009Mobile speed notification system (special) (604160)EACH1$14,000$15,000
0010Roadway construction control (635011)LS1$28,000$45,000
0011Enhanced thermoplastic pavement marking white (6") (719502)LF3,960$6.50$6.25
0012Enhanced thermoplastic pavement marking yellow (6") (719602)LF3,168$6.50$6.25
0013Raised pavement markers (type II) (721002)EACH40$57.00$62.50
0014Grooving (802202)SY10,560$10.00$17.25
0015Silane protective surface treatment (803201)SY10,560$12.50$11.59
0016Mobilization (unit bid amount may not exceed 5% of subtotal) (601001)LS1$29,000$39,000
ARDOT contract A40056: unit prices by line

The pay item list has one row per line (item, description, unit, quantity, the low bidder's unit price), the flat layout estimating software imports. Pay items with a page of their own open their price history.

Source

Read from ARDOT's tabulation for this contract. ARDOT monthly bid tab PDFs (morning and afternoon sessions), January 2022 to November 2026. Base bids are printed in whole dollars; on A+B and A+C jobs the base bid is kept, and the published rank follows the award amount.

Every contract let that day: ARDOT letting of June 24, 2026. Compiled by Mirage Metrics.

Your own bid history, read the same way

Mirage deploys AI agents for heavy civil estimating teams: quantities from the plan set, specs and addenda read, and bid tabs compared, inside your systems and your rules.

We use your email to reply to you and, now and then, to tell you about Mirage. You can opt out at any time. Privacy policy