ARDOT contract A40050 bid tabulation

THE PURPOSE OF THIS PROJECT IS TO MILL AND OVERLAY APPROXIMATELY 6.744 MILES OF HIGHWAYS 71, 71B, AND 272 IN SCOTT COUNTY. THIS PROJECT CONSISTS OF REMOVAL AND DISPOSAL ITEMS, TRENCHING AND SHOULDER PREPARATION, AGGREGATE BASE COURSE, ACHM BINDER AND SURFACE COURSES, COLD MILLING ASPHALT PAVEMENT, ACHM PATCHING OF EXISTING ROADWAY, MAINTENANCE OF TRAFFIC, EROSION CONTROL, MUMBLE STRIPS AND STRIPES, PAVEMENT MARKING, AND MISC. ITEMS. Let by Arkansas DOT on April 8, 2026, Scott. 4 bids received; low bid $3,271,994 by Blackstone Construction, LLC.

Owner
Arkansas DOT
Letting
08 APR 2026
Pay items
38
Data through
04 NOV 2026

Bidders

RankBidderTotal bidAgainst the low bid
1Blackstone Construction, LLC$3,271,994Low
2Emery Sapp & Sons, Inc.$3,434,864+5.0%
3Forsgren, Inc.$3,645,599+11%
4Robinson Construction, LLC$3,971,577+21%
ARDOT contract A40050: bids by rank

Bid tabulation

LinePay itemUnitQuantity1. Blackstone Construction, LLC2. Emery Sapp & Sons, Inc.3. Forsgren, Inc.4. Robinson Construction, LLC
0001Removal and disposal of concrete islands (202047)SY1,550$29.00$13.31$10.50$12.55
0002Removal and disposal of signs (202191)EACH9$500.00$250.00$525.00$150.00
0003Trenching and shoulder preparation (215011)STA63$250.00$219.27$290.00$1,255.00
0004Aggregate base course (class 7) (303117)TON375$43.71$48.01$49.30$38.55
0005Tack coat (401011)GAL32,753$0.01$0.01$3.00$3.70
0006Mineral aggregate in achm binder course (1") (406161)TON241$133.85$117.49$146.70$135.00
0007Asphalt binder (PG 64-22) in achm binder course (1") (minimum bid $120.00) (406402)TON15$120.00$120.00$120.00$120.00
0008Mineral aggregate in achm surface course (1/2") (407162)TON19,671$109.58$120.07$119.20$119.55
0009Asphalt binder (PG 64-22) in achm surface course (1/2") (minimum bid $120.00) (407432)TON30$120.00$120.00$120.00$120.00
0010Asphalt binder (PG 70-22) in achm surface course (1/2") (minimum bid $120.00) (407442)TON1,247$120.00$120.00$120.00$120.00
0011Cold milling asphalt pavement (412002)SY145,788$2.00$1.07$2.50$3.75
0012Asphalt concrete patching for maintenance of traffic (414011)TON200$25.00$160.17$225.00$195.00
0013Achm patching of existing roadway (415011)TON500$210.77$157.56$190.00$185.00
0014Maintenance of traffic (603009)LS1$10,000$101,825$60,500$55,000
0015Signs (604003)SF2,425$8.00$9.26$8.40$8.80
0016Construction pavement markings (604041)LF147,000$0.20$0.23$0.21$0.22
0017Construction pavement markings (words) (604045)EACH2$125.00$144.66$131.25$137.50
0018Construction pavement markings (arrows) (604046)EACH2$100.00$115.74$105.00$110.00
0019Construction pavement markings (railroad emblems) (604047)EACH3$250.00$289.34$262.50$275.00
0020Silt fence (621021)LF500$3.48$4.03$3.65$5.00
0021Sand bag ditch checks (621031)BAG220$11.69$13.53$12.25$15.00
0022Concrete island (632011)SY337$162.00$156.25$106.65$288.00
0023Roadway construction control (635011)LS1$7,500.00$11,713$22,000$15,000
0024Mumble strips in asphalt shoulders (642301)LF55,671$0.27$0.25$0.25$0.23
0025Centerline mumble stripes in asphalt roadways (642402)LF27,840$0.27$0.25$0.27$0.23
0026Reflectorized paint pavement marking white (6") (718002)LF1,000$1.00$1.16$1.05$1.10
0027Thermoplastic pavement marking white (6") (719002)LF58,000$0.60$0.69$0.63$0.66
0028Thermoplastic pavement marking white (8") (719003)LF1,000$1.50$1.74$1.58$1.65
0029Thermoplastic pavement marking white (12") (719005)LF700$5.00$5.79$5.25$5.50
0030Thermoplastic pavement marking yellow (6") (719102)LF75,600$0.60$0.69$0.63$0.66
0031Thermoplastic pavement marking (yield line) (719200)LF300$10.00$11.57$10.50$11.00
0032Thermoplastic pavement marking (words) (719201)EACH2$350.00$405.07$367.50$385.00
0033Thermoplastic pavement marking (arrows) (719202)EACH2$300.00$347.21$315.00$330.00
0034Thermoplastic pavement marking (railroad emblems) (719203)EACH3$500.00$578.68$525.00$550.00
0035Raised pavement markers (type II) (721002)EACH560$7.00$8.10$7.35$7.70
0036Standard sign (726002)SF166$37.50$43.40$39.40$41.25
0037Omni-directional breakaway sign supports (type G-1) (730499)EACH16$2,400.00$2,777.68$2,520.00$2,640.00
0038Mobilization (unit bid amount may not exceed 5% of subtotal) (601001)LS1$155,809$156,030$105,500$117,000
ARDOT contract A40050: unit prices by line

The pay item list has one row per line (item, description, unit, quantity, the low bidder's unit price), the flat layout estimating software imports. Pay items with a page of their own open their price history.

Source

Read from ARDOT's tabulation for this contract. ARDOT monthly bid tab PDFs (morning and afternoon sessions), January 2022 to November 2026. Base bids are printed in whole dollars; on A+B and A+C jobs the base bid is kept, and the published rank follows the award amount.

Every contract let that day: ARDOT letting of April 8, 2026. Compiled by Mirage Metrics.

Your own bid history, read the same way

Mirage deploys AI agents for heavy civil estimating teams: quantities from the plan set, specs and addenda read, and bid tabs compared, inside your systems and your rules.

We use your email to reply to you and, now and then, to tell you about Mirage. You can opt out at any time. Privacy policy