Forsgren, Inc.: ARDOT bid record
Forsgren, Inc. submitted 44 bids on Arkansas DOT contracts in the data, from 12 JAN 2022 to 12 AUG 2026, and was the low bidder on 20 of them (45%). When it was not low, its total sat a median +13% above the low bid.
- Owner
- Arkansas DOT
- Low bid volume
- $51,193,160
- Latest bid
- 12 AUG 2026
- Data through
- 04 NOV 2026
By year
| Year | Bids | Low bids | Win rate |
|---|---|---|---|
| 2022 | 11 | 7 | 64% |
| 2023 | 10 | 6 | 60% |
| 2024 | 6 | 3 | 50% |
| 2025 | 11 | 3 | 27% |
| 2026 | 6 | 1 | 17% |
By county
| County | Bids | Low bids | Win rate |
|---|---|---|---|
| Sebastian | 17 | 10 | 59% |
| Crawford | 13 | 8 | 62% |
| Scott | 5 | 1 | 20% |
| Logan | 3 | 0 | 0% |
| Franklin | 3 | 1 | 33% |
| Franklin, Logan | 1 | 0 | 0% |
| Franklin, Sebastian | 1 | 0 | 0% |
| Benton | 1 | 0 | 0% |
Pay items where it is most often lowest
| Pay item | Code | Unit | Lines bid | Lowest on the line | Its median price | All bidders' median |
|---|---|---|---|---|---|---|
| Asphalt binder (PG 64-22) in achm surface course (1/2") (minimum bid $120.00) | 407432 | TON | 19 | 19 (100%) | $120.00 | $120.00 |
| Signs | 604003 | SF | 33 | 15 (45%) | $12.75 | $8.40 |
| Tack coat | 401011 | GAL | 27 | 14 (52%) | $4.00 | $3.75 |
| Thermoplastic pavement marking (arrows) | 719202 | EACH | 13 | 11 (85%) | $288.75 | $290.00 |
| Thermoplastic pavement marking white (12") | 719005 | LF | 15 | 10 (67%) | $5.25 | $7.94 |
| Asphalt binder (PG 64-22) in achm surface course (3/8") (minimum bid $120.00) | 407431 | TON | 10 | 10 (100%) | $120.00 | $120.00 |
| Construction pavement markings | 604041 | LF | 20 | 9 (45%) | $0.34 | $0.28 |
| Thermoplastic pavement marking yellow (6") | 719102 | LF | 18 | 9 (50%) | $1.05 | $0.85 |
| Asphalt binder (PG 70-22) in achm surface course (1/2") (minimum bid $120.00) | 407442 | TON | 9 | 9 (100%) | $120.00 | $120.00 |
| Mineral aggregate in achm surface course (1/2") | 407162 | TON | 22 | 8 (36%) | $122.53 | $124.55 |
| Raised pavement markers (type II) | 721002 | EACH | 20 | 8 (40%) | $7.35 | $6.50 |
| Thermoplastic pavement marking white (6") | 719002 | LF | 18 | 8 (44%) | $1.05 | $0.90 |
A line counts when the firm priced it and at least one other bidder did too; the lowest unit price on the line counts whoever won the contract. Token prices and bids over three times the low bid are left out.
Who it meets most
| Firm | Contracts in common | That firm ranked ahead |
|---|---|---|
| Emery Sapp & Sons, Inc. | 20 | 13 of 20 |
| Robinson Construction, LLC | 17 | 6 of 17 |
| Blackstone Construction, LLC | 12 | 10 of 12 |
| Apac-Central, Inc. | 6 | 1 of 6 |
| McKenzie Asphalt, LLC | 5 | 1 of 5 |
| Grant Garrett Excavating, Inc. | 3 | 2 of 3 |
| Taylor-Hendrix, LLC | 1 | 1 of 1 |
| Hardrock Construction, Inc. | 1 | 1 of 1 |
| McGeorge Contracting Co., Inc. | 1 | 1 of 1 |
| T & T Construction, LLC | 1 | 0 of 1 |
Latest bids
| Let | Contract | County | Project | Rank | Its bid | Against the low bid |
|---|---|---|---|---|---|---|
| 12 AUG 2026 | 090702 | Benton | THE PURPOSE OF THIS PROJECT IS SAFETY IMPROVEMENTS AT THE INTERSECTION OF HIGHWAY 72 AND PLENTYWOOD ROAD IN BENTON COUNTY. THIS PROJECT CONS | 2 of 3 | $1,689,469 | +19% |
| 20 MAY 2026 | SA6347 | Scott | THE PURPOSE OF THIS PROJECT IS TO OVERLAY APPROXIMATELY 1.57 MILES OF SWEET GUM LN. IN SCOTT COUNTY. THIS PROJECT CONSISTS OF STONE BACKFILL | 2 of 4 | $486,248 | +3.0% |
| 08 APR 2026 | A40049 | Crawford | THE PURPOSE OF THIS PROJECT IS TO MILL AND OVERLAY APPROXIMATELY 10.901 MILES OF HIGHWAY 64 IN CRAWFORD COUNTY. THIS PROJECT CONSISTS OF REM | 1 of 3 | $4,838,281 | Low, 3.0% under the second |
| 08 APR 2026 | A40050 | Scott | THE PURPOSE OF THIS PROJECT IS TO MILL AND OVERLAY APPROXIMATELY 6.744 MILES OF HIGHWAYS 71, 71B, AND 272 IN SCOTT COUNTY. THIS PROJECT CONS | 3 of 4 | $3,645,599 | +11% |
| 08 APR 2026 | A80045 | Logan | THE PURPOSE OF THIS PROJECT IS TO OVERLAY APPROXIMATELY 10.267 MILES OF HIGHWAYS 109 AND 393 IN LOGAN COUNTY. THIS PROJECT CONSISTS OF REMOV | 3 of 3 | $5,949,104 | +13% |
| 08 APR 2026 | C65018 | Sebastian | THE PURPOSE OF THIS PROJECT IS TO OVERLAY APPROXIMATELY 2.02 MILES OF VARIOUS CITY STREETS IN THE CITY OF BARLING, APPROXIMATELY 1.37 MILES | 2 of 4 | $1,052,577 | +11% |
| 05 NOV 2025 | A40048 | Franklin | THE PURPOSE OF THIS PROJECT IS TO MILL AND OVERLAY APPROXIMATELY 9.674 MILES OF HIGHWAYS 23, 64, AND 219 IN FRANKLIN COUNTY. THIS PROJECT CO | 3 of 5 | $4,186,393 | +15% |
| 05 NOV 2025 | A40053 | Franklin | THE PURPOSE OF THIS PROJECT IS TO OVERLAY AND SCRUB SEAL APPROXIMATELY 6.142 MILES OF HIGHWAY 186 IN FRANKLIN COUNTY. THIS PROJECT CONSISTS | 3 of 5 | $3,120,811 | +9.0% |
| 17 SEP 2025 | 040889 | Sebastian | THE PURPOSE OF THIS PROJECT IS TO CONSTRUCT IMPROVEMENTS TO I-540 INTERCHANGE RAMPS 3 AND 4, SOUTH 36TH STREET, AND HIGHWAY 255, ALONG WITH | 1 of 2 | $3,376,855 | Low, 88% under the second |
| 13 AUG 2025 | 040885 | Crawford | THE PURPOSE OF THIS PROJECT IS TO LEVEL WITH ACHM SURFACE COURSE AND NOTCH AND WIDEN APPROXIMATELY 0.131 MILES, WITH APPROXIMATELY 0.248 OF | 5 of 5 | $5,647,571 | +58% |
| 21 MAY 2025 | 040714 | Crawford | THE PURPOSE OF THIS PROJECT IS TO IMPROVE INTERCHANGE, ADD ROUNDABOUT AND RAMPS IMPROVEMENTS ON INTERSTATE 40 AND HIGHWAY 59 IN CRAWFORD COU | 2 of 2 | $14,598,802 | -1.0% |
| 26 FEB 2025 | A40040 | Sebastian | THE PURPOSE OF THIS PROJECT IS TO MILL, OVERLAY, AND PLACE ULTRATHIN BONDED WEARING COURSE ON APPROXIMATELY 9.767 MILES OF HIGHWAYS 45 AND 2 | 3 of 3 | $5,025,168 | +34% |
| 26 FEB 2025 | A40042 | Crawford | THE PURPOSE OF THIS PROJECT IS TO MILL AND OVERLAY APPROXIMATELY 3.505 MILES OF HIGHWAYS 64 AND 162 IN CRAWFORD COUNTY. THIS PROJECT CONSIST | 3 of 3 | $2,617,345 | +10% |
| 15 JAN 2025 | A40038 | Sebastian | THE PURPOSE OF THIS PROJECT IS TO MILL AND OVERLAY APPROXIMATELY 8.973 MILES OF HIGHWAYS 22 AND 64 IN FORT SMITH IN SEBASTIAN COUNTY. THIS P | 1 of 3 | $5,985,144 | Low, 1.0% under the second |
| 15 JAN 2025 | C17013 | Crawford | THE PURPOSE OF THIS PROJECT IS TO OVERLAY APPROXIMATELY 1.15 MILES OF VARIOUS CITY STREETS IN THE CITY OF ALMA IN CRAWFORD COUNTY. THIS PROJ | 3 of 5 | $346,695 | +3.0% |
| 15 JAN 2025 | C65016 | Sebastian | THE PURPOSE OF THIS PROJECT IS TO OVERLAY APPROXIMATELY 1.17 MILES OF VARIOUS CITY STREETS IN THE CITY OF GREENWOOD AND APPROXIMATELY 1.02 M | 3 of 5 | $612,971 | +13% |
| 15 JAN 2025 | SA1774 | Crawford | THE PURPOSE OF THIS PROJECT IS TO OVERLAY APPROXIMATELY 2.83 MILES OF COUNTY ROAD 23 IN CRAWFORD COUNTY. THIS PROJECT CONSISTS OF AGGREGATE | 1 of 4 | $864,346 | Low, 4.0% under the second |
| 06 NOV 2024 | A40037 | Crawford | THE PURPOSE OF THIS PROJECT IS TO MILL AND OVERLAY APPROXIMATELY 4.180 MILES OF HIGHWAY 71 IN CRAWFORD COUNTY. THIS PROJECT CONSISTS OF AGGR | 2 of 3 | $2,520,003 | +4.0% |
| 28 FEB 2024 | C17012 | Crawford | THE PURPOSE OF THIS PROJECT IS TO OVERLAY APPROXIMATELY 0.95 MILES OF VARIOUS CITY STREETS IN THE CITY OF CHESTER IN CRAWFORD COUNTY. THIS P | 1 of 1 | $315,237 | Low |
| 28 FEB 2024 | C65017 | Sebastian | THE PURPOSE OF THIS PROJECT IS TO OVERLAY AND SURFACE APPROXIMATELY 1.08 MILES OF VARIOUS CITY STREETS IN THE CITY OF BONANZA IN SEBASTIAN C | 3 of 3 | $465,918 | +14% |
| 17 JAN 2024 | A40028 | Sebastian | THE PURPOSE OF THIS PROJECT IS TO MILL AND OVERLAY APPROXIMATELY 3.800 MILES OF HIGHWAY 71B IN FORT SMITH IN SEBASTIAN COUNTY. THIS PROJECT | 1 of 1 | $2,629,505 | Low |
| 17 JAN 2024 | A40029 | Sebastian | THE PURPOSE OF THIS PROJECT IS TO LEVEL UP AND OVERLAY APPROXIMATELY 7.34 MILES OF HIGHWAY 255 IN SEBASTIAN COUNTY. THIS PROJECT CONSISTS OF | 1 of 3 | $4,185,515 | Low, 8.0% under the second |
| 17 JAN 2024 | A80034 | Logan | THE PURPOSE OF THIS PROJECT IS TO MILL AND OVERLAY APPROXIMATELY 3.30 MILES OF HIGHWAY 22 IN LOGAN COUNTY. THIS PROJECT CONSISTS OF AGGREGAT | 2 of 2 | $2,298,944 | +13% |
| 28 JUN 2023 | SA1773 | Crawford | THE PURPOSE OF THIS PROJECT IS TO OVERLAY APPROXIMATELY 1.25 MILES OF COUNTY ROAD 19 IN CRAWFORD COUNTY. THIS PROJECT CONSISTS OF AGGREGATE | 1 of 2 | $304,116 | Low, 62% under the second |
| 17 MAY 2023 | 040839 | Sebastian | THE PURPOSE OF THIS PROJECT IS TO MILL AND OVERLAY APPROXIMATELY 4.774 MILES OF HIGHWAY 96 IN SEBASTIAN COUNTY. THIS PROJECT CONSISTS OF REM | 2 of 2 | $2,928,087 | +18% |
How this record was read
ARDOT monthly bid tab PDFs (morning and afternoon sessions), January 2022 to November 2026. Base bids are printed in whole dollars; on A+B and A+C jobs the base bid is kept, and the published rank follows the award amount.
- Every bid counted here matched its published total to within one dollar; ARDOT's rank decides who was low.
- The gap to the low bid is the firm's total over the low total, minus one, on contracts it did not win, leaving out bids over three times the low bid.
- A record covers the lettings in the data, not every contract the firm ever bid. Coverage by year is on the state page.
A name split in two, or a figure that does not match the owner's tabulation? Write to mehdi@miragemetrics.com and we correct it.
Your own bid history, read the same way
Mirage deploys AI agents for heavy civil estimating teams: quantities from the plan set, specs and addenda read, and bid tabs compared, inside your systems and your rules.