ARDOT letting results, June 28, 2023
9 contracts let by Arkansas DOT on June 28, 2023, $71,956,259 in low bids, a median of 2 bidders per contract.
- Owner
- Arkansas DOT
- Contracts
- 9
- Low bids, total
- $71,956,259
- Data through
- 04 NOV 2026
Contracts let that day
| Contract | Project | County | Bids | Low bidder | Low bid | Second bid | Gap | Source |
|---|---|---|---|---|---|---|---|---|
| 080648 | THE PURPOSE OF THIS PROJECT IS TO MILL AND OVERLAY APPROXIMATELY 19.465 MILES OF I-40 AND POLYMER OVERLAY SIX STRUCTURES IN JOHNSON AND POPE COUNTIES. THIS PROJ | Johnson, Pope | 1 | Blackstone Construction, LLC | $42,913,340 | ARDOT | ||
| 061750 | THE PURPOSE OF THIS PROJECT IS TO PERFORM REHABILITATION ON APPROXIMATELY 10.632 MILES OF I-30 MAIN LANES PORTLAND CEMENT CONCRETE PAVEMENT AND POLYMER OVERLAY | Hot Spring, Saline | 2 | Emery Sapp & Sons, Inc. | $18,988,046 | $20,030,344 | +5.0% | ARDOT |
| 101077 | THE PURPOSE OF THIS PROJECT IS TO RESURFACE APPROXIMATELY 7.647 MILES OF MAIN LANES ON INTERSTATE 55 IN MISSISSIPPI COUNTY. THIS PROJECT CONSISTS OF ULTRATHIN B | Mississippi | 1 | Delta Asphalt of Ark., Inc. | $4,824,697 | ARDOT | ||
| A00046 | THE PURPOSE OF THIS PROJECT IS TO LEVEL AND OVERLAY THE MAIN LANES WITH ACHM SURFACE COURSE AND CONSTRUCT 2'-0" SHOULDERS ON APPROXIMATELY 5.475 MILES OF HIGHWA | Greene | 2 | Atlas Asphalt, Inc. | $2,197,385 | $2,229,797 | +1.0% | ARDOT |
| 050415 | THE PURPOSE OF THIS PROJECT IS TO REPLACE ONE STRUCTURE WITH A RC BOX CULVERT ON HIGHWAY 230 IN INDEPENDENCE COUNTY. THIS PROJECT CONSISTS OF CLEARING AND GRUBB | Independence | 3 | Kesser International, Inc. | $1,247,623 | $1,516,443 | +22% | ARDOT |
| SA0447 | THE PURPOSE OF THIS PROJECT IS TO OVERLAY APPROXIMATELY 4.16 MILES OF COUNTY ROADS 31, 428 AND 429 IN BENTON COUNTY. THIS PROJECT CONSISTS OF AGGREGATE BASE COU | Benton | 3 | Emery Sapp & Sons, Inc. | $871,939 | $899,233 | +3.0% | ARDOT |
| SA3278 | THE PURPOSE OF THIS PROJECT IS TO OVERLAY APPROXIMATELY 2.50 MILES OF COUNTY ROADS 9 AND 90 AND STRIPE APPROXIMATELY 3.96 MILES OF COUNTY ROADS 9 AND 90 IN INDE | Independence | 1 | Atlas Asphalt, Inc. | $438,105 | ARDOT | ||
| SA1773 | THE PURPOSE OF THIS PROJECT IS TO OVERLAY APPROXIMATELY 1.25 MILES OF COUNTY ROAD 19 IN CRAWFORD COUNTY. THIS PROJECT CONSISTS OF AGGREGATE BASE COURSE, ACHM SU | Crawford | 2 | Forsgren, Inc. | $304,116 | $493,463 | +62% | ARDOT |
| SA2043 | THE PURPOSE OF THIS PROJECT IS TO RESEAL APPROXIMATELY 4.20 MILES OF COUNTY ROADS 19 AND 33 IN DALLAS COUNTY. THIS PROJECT CONSISTS OF ASPHALT SURFACE TREATMENT | Dallas | 1 | Smackover Paving Co. | $171,008 | ARDOT |
Gap is the second bid over the low bid. Where a contract shows fewer bids than ARDOT received, the others did not match their published totals and are left out.