Atlas Asphalt, Inc.: ARDOT bid record
Atlas Asphalt, Inc. submitted 234 bids on Arkansas DOT contracts in the data, from 12 JAN 2022 to 04 NOV 2026, and was the low bidder on 166 of them (71%). When it was not low, its total sat a median +7.0% above the low bid.
- Owner
- Arkansas DOT
- Low bid volume
- $262,842,389
- Latest bid
- 04 NOV 2026
- Data through
- 04 NOV 2026
By year
| Year | Bids | Low bids | Win rate |
|---|---|---|---|
| 2022 | 39 | 30 | 77% |
| 2023 | 48 | 38 | 79% |
| 2024 | 41 | 33 | 80% |
| 2025 | 55 | 38 | 69% |
| 2026 | 51 | 27 | 53% |
By county
| County | Bids | Low bids | Win rate |
|---|---|---|---|
| Craighead | 20 | 17 | 85% |
| Independence | 16 | 14 | 88% |
| Lawrence | 13 | 9 | 69% |
| Phillips | 12 | 10 | 83% |
| Izard | 12 | 11 | 92% |
| Poinsett | 12 | 10 | 83% |
| Jackson | 11 | 10 | 91% |
| Marion | 10 | 3 | 30% |
| Baxter | 10 | 8 | 80% |
| Randolph | 10 | 8 | 80% |
| Searcy | 9 | 4 | 44% |
| Stone | 8 | 8 | 100% |
Pay items where it is most often lowest
| Pay item | Code | Unit | Lines bid | Lowest on the line | Its median price | All bidders' median |
|---|---|---|---|---|---|---|
| Signs | 604003 | SF | 186 | 163 (88%) | $6.30 | $8.40 |
| Achm patching of existing roadway | 415011 | TON | 161 | 111 (69%) | $175.00 | $250.00 |
| Asphalt binder (PG 64-22) in achm surface course (1/2") (minimum bid $120.00) | 407432 | TON | 79 | 79 (100%) | $120.00 | $120.00 |
| Asphalt binder (PG 64-22) in achm surface course (3/8") (minimum bid $120.00) | 407431 | TON | 76 | 76 (100%) | $120.00 | $120.00 |
| Construction pavement markings | 604041 | LF | 78 | 65 (83%) | $0.20 | $0.28 |
| Raised pavement markers (type II) | 721002 | EACH | 81 | 63 (78%) | $4.80 | $6.50 |
| Cold milling asphalt pavement | 412002 | SY | 82 | 51 (62%) | $3.67 | $8.00 |
| Thermoplastic pavement marking white (6") | 719002 | LF | 62 | 50 (81%) | $0.71 | $0.90 |
| Thermoplastic pavement marking yellow (6") | 719102 | LF | 62 | 48 (77%) | $0.69 | $0.85 |
| Reflectorized paint pavement marking yellow (4") | 718101 | LF | 56 | 48 (86%) | $0.15 | $0.21 |
| Rumble stripes in asphalt shoulders | 642011 | LF | 44 | 35 (80%) | $0.11 | $0.14 |
| Mineral aggregate in achm surface course (1/2") | 407162 | TON | 94 | 34 (36%) | $99.57 | $124.55 |
A line counts when the firm priced it and at least one other bidder did too; the lowest unit price on the line counts whoever won the contract. Token prices and bids over three times the low bid are left out.
Who it meets most
| Firm | Contracts in common | That firm ranked ahead |
|---|---|---|
| Rogers Group, Inc. | 49 | 7 of 49 |
| Sugg Construction, Inc. | 47 | 9 of 47 |
| Delta Asphalt of Ark., Inc. | 45 | 6 of 45 |
| Delta Asphalt of Arkansas, Inc. | 44 | 5 of 44 |
| Apac-Central, Inc. | 38 | 23 of 38 |
| Michelle'S Excavating, Inc. | 26 | 5 of 26 |
| Richard Baughn Construction, Inc. | 19 | 3 of 19 |
| CK Asphalt, LLC | 18 | 7 of 18 |
| M & T Paving & Const. Co., Inc. | 17 | 9 of 17 |
| Apac-Tennessee, Inc. | 17 | 2 of 17 |
Latest bids
| Let | Contract | County | Project | Rank | Its bid | Against the low bid |
|---|---|---|---|---|---|---|
| 04 NOV 2026 | A10059 | Phillips | THE PURPOSE OF THIS PROJECT IS TO PLACE CHIP SEAL AND FOG SEAL APPROXIMATELY 9.670 MILES OF HIGHWAY 85 IN PHILLIPS COUNTY. THIS PROJECT CONS | 1 of 1 | $3,918,524 | Low |
| 04 NOV 2026 | A20044 | Arkansas | THE PURPOSE OF THIS PROJECT IS TO OVERLAY APPROXIMATELY 23.707 MILES OF HIGHWAY 130 IN ARKANSAS COUNTY. THIS PROJECT CONSISTS OF REMOVAL AND | 2 of 4 | $9,297,763 | +7.0% |
| 04 NOV 2026 | A50052 | Independence | THE PURPOSE OF THIS PROJECT IS TO OVERLAY APPROXIMATELY 5.996 MILES OF HIGHWAY 14 IN INDEPENDENCE COUNTY. THIS PROJECT CONSISTS OF REMOVAL A | 1 of 2 | $1,628,560 | Low, 9.0% under the second |
| 04 NOV 2026 | A80050 | Van Buren | THE PURPOSE OF THIS PROJECT IS TO MILL AND OVERLAY AND PLACE ULTRATHIN BONDED WEARING COURSE ON APPROXIMATELY 13.159 MILES OF HIGHWAY 65 IN | 3 of 3 | $5,778,564 | +17% |
| 04 NOV 2026 | A90050 | Baxter | THE PURPOSE OF THIS PROJECT IS TO OVERLAY APPROXIMATELY 10.552 MILES OF HIGHWAY 101 IN BAXTER COUNTY. THIS PROJECT CONSISTS OF REMOVAL AND D | 1 of 2 | $3,389,578 | Low, 4.0% under the second |
| 04 NOV 2026 | A90051 | Carroll, Madison | THE PURPOSE OF THIS PROJECT IS TO MILL AND OVERLAY APPROXIMATELY 11.203 MILES OF HIGHWAY 412 IN CARROLL AND MADISON COUNTIES. THIS PROJECT C | 2 of 3 | $5,337,692 | +25% |
| 04 NOV 2026 | A00103 | Craighead | THE PURPOSE OF THIS PROJECT IS TO PLACE ULTRATHIN BONDED WEARING COURSE ON APPROXIMATELY 4.858 MILES OF HIGHWAY 18 IN CRAIGHEAD COUNTY. THIS | 1 of 3 | $1,150,126 | Low, 16% under the second |
| 23 SEP 2026 | SA6949 | Stone | THE PURPOSE OF THIS PROJECT IS TO SURFACE 0.18 MILE OF HERPEL ROAD IN STONE COUNTY. THIS PROJECT CONSISTS OF AGGREGATE BASE COURSE, RECONSTR | 1 of 1 | $138,633 | Low |
| 12 AUG 2026 | SA5143 | Newton | THE PURPOSE OF THIS PROJECT IS TO OVERLAY APPROXIMATELY 1.37 MILES OF GLADDEN ST. IN NEWTON COUNTY. THIS PROJECT CONSISTS OF AGGREGATE BASE | 2 of 2 | $356,236 | +48% |
| 24 JUN 2026 | SA0148 | Arkansas | THE PURPOSE OF THIS PROJECT IS TO OVERLAY APPROXIMATELY 0.63 MILE OF DRIER RD. & LEDER RD. IN ARKANSAS COUNTY. THIS PROJECT CONSISTS OF ACHM | 1 of 3 | $137,781 | Low, 17% under the second |
| 24 JUN 2026 | SA3466 | Jackson | THE PURPOSE OF THIS PROJECT IS TO OVERLAY APPROXIMATELY 3.00 MILES OF CO. RD. 37 IN JACKSON COUNTY. THIS PROJECT CONSISTS OF AGGREGATE BASE | 1 of 4 | $392,237 | Low, 7.0% under the second |
| 24 JUN 2026 | SA4555 | Marion | THE PURPOSE OF THIS PROJECT IS TO OVERLAY APPROXIMATELY 2.14 MILES OF COUNTY ROAD 8060 IN MARION COUNTY. THIS PROJECT CONSISTS OF AGGREGATE | 2 of 2 | $416,046 | +4.0% |
| 24 JUN 2026 | SA6740 | Sharp | THE PURPOSE OF THIS PROJECT IS TO OVERLAY APPROXIMATELY 1.40 MILES OF PEACE VALLEY RD. IN SHARP COUNTY. THIS PROJECT CONSISTS OF AGGREGATE B | 1 of 1 | $377,951 | Low |
| 20 MAY 2026 | A10052 | Lee, Monroe | THE PURPOSE OF THIS PROJECT IS TO OVERLAY APPROXIMATELY 4.776 MILES OF HIGHWAY 79 IN LEE AND MONROE COUNTIES. THIS PROJECT CONSISTS OF AGGRE | 2 of 5 | $850,194 | +1.0% |
| 20 MAY 2026 | A00095 | Craighead | THE PURPOSE OF THIS PROJECT IS TO PLACE ULTRATHIN BONDED WEARING COURSE ON APPROXIMATELY 4.003 MILES OF HIGHWAY 135 IN CRAIGHEAD COUNTY. THI | 1 of 3 | $917,967 | Low, 22% under the second |
| 20 MAY 2026 | SA0367 | Baxter | THE PURPOSE OF THIS PROJECT IS TO OVERLAY APPROXIMATELY 3.00 MILES OF COUNTY ROAD 57 AND APPROXIMATELY 0.30 MILE OF COUNTY ROAD 618 IN BAXTE | 2 of 2 | $499,163 | 0.0% |
| 20 MAY 2026 | SA1669 | Craighead | THE PURPOSE OF THIS PROJECT IS TO RESEAL APPROXIMATELY 2.99 MILES OF CO. RD. 324 AND 3.12 MILES OF CO. RD. 534 IN CRAIGHEAD COUNTY. THIS PRO | 1 of 2 | $277,633 | Low, 25% under the second |
| 20 MAY 2026 | SA1670 | Craighead | THE PURPOSE OF THIS PROJECT IS TO OVERLAY APPROXIMATELY 4.54 MILES OF COUNTY ROAD 928 IN CRAIGHEAD COUNTY. THIS PROJECT CONSISTS OF ULTRATHI | 1 of 3 | $336,030 | Low, 13% under the second |
| 20 MAY 2026 | SA3280 | Independence | THE PURPOSE OF THIS PROJECT IS TO OVERLAY APPROXIMATELY 2.94 MILES OF WISH ST. IN INDEPENDENCE COUNTY. THIS PROJECT CONSISTS OF AGGREGATE BA | 2 of 3 | $483,200 | +8.0% |
| 20 MAY 2026 | SA3354 | Izard | THE PURPOSE OF THIS PROJECT IS TO LEVEL AND RESEAL 3.38 MILES OF DOLPH RD. IN IZARD COUNTY. THIS PROJECT CONSISTS OF ACHM SURFACE COURSE, AS | 2 of 2 | $159,751 | +4.0% |
| 20 MAY 2026 | SA3859 | Lawrence | THE PURPOSE OF THIS PROJECT IS TO SURFACE APPROXIMATELY 1.00 MILE OF COUNTY ROAD 504 IN LAWRENCE COUNTY. THIS PROJECT CONSISTS OF AGGREGATE | 2 of 5 | $164,047 | +17% |
| 20 MAY 2026 | SA3860 | Lawrence | THE PURPOSE OF THIS PROJECT IS TO SEAL APPROXIMATELY 0.70 MILE AND SURFACE 0.80 MILE OF COUNTY ROAD 529 IN LAWRENCE COUNTY. THIS PROJECT CON | 1 of 3 | $181,963 | Low, 10% under the second |
| 20 MAY 2026 | SA4749 | Mississippi | THE PURPOSE OF THIS PROJECT IS TO LEVEL AND RESEAL APPROXIMATELY 2.00 MILES OF CO. RD. 474 IN MISSISSIPPI COUNTY. THIS PROJECT CONSISTS OF A | 2 of 2 | $203,664 | +12% |
| 20 MAY 2026 | SA4840 | Monroe | THE PURPOSE OF THIS PROJECT IS TO OVERLAY APPROXIMATELY 3.10 MILES OF BETHLEHEM RD. IN MONROE COUNTY. THIS PROJECT CONSISTS OF AGGREGATE BAS | 1 of 5 | $617,052 | Low, 2.0% under the second |
| 20 MAY 2026 | SA5453 | Phillips | THE PURPOSE OF THIS PROJECT IS TO LEVEL AND SEAL APPROXIMATELY 5.00 MILES OF COUNTY ROAD 600 IN PHILLIPS COUNTY. THIS PROJECT CONSISTS OF AS | 2 of 2 | $360,455 | +6.0% |
How this record was read
ARDOT monthly bid tab PDFs (morning and afternoon sessions), January 2022 to November 2026. Base bids are printed in whole dollars; on A+B and A+C jobs the base bid is kept, and the published rank follows the award amount.
- Every bid counted here matched its published total to within one dollar; ARDOT's rank decides who was low.
- The gap to the low bid is the firm's total over the low total, minus one, on contracts it did not win, leaving out bids over three times the low bid.
- A record covers the lettings in the data, not every contract the firm ever bid. Coverage by year is on the state page.
A name split in two, or a figure that does not match the owner's tabulation? Write to mehdi@miragemetrics.com and we correct it.
Your own bid history, read the same way
Mirage deploys AI agents for heavy civil estimating teams: quantities from the plan set, specs and addenda read, and bid tabs compared, inside your systems and your rules.