ARDOT contract SA3354 bid tabulation
THE PURPOSE OF THIS PROJECT IS TO LEVEL AND RESEAL 3.38 MILES OF DOLPH RD. IN IZARD COUNTY. THIS PROJECT CONSISTS OF ACHM SURFACE COURSE, ASPHALT SURFACE TREATMENT, ACHM PATCHING OF EXISTING ROADWAY, MAINTENANCE OF TRAFFIC, AND MISC. ITEMS. Let by Arkansas DOT on May 20, 2026, Izard. 2 bids received; low bid $153,545 by Apac-Central, Inc..
- Owner
- Arkansas DOT
- Letting
- 20 MAY 2026
- Pay items
- 9
- Data through
- 04 NOV 2026
Bidders
| Rank | Bidder | Total bid | Against the low bid |
|---|---|---|---|
| 1 | Apac-Central, Inc. | $153,545 | Low |
| 2 | Atlas Asphalt, Inc. | $159,751 | +4.0% |
Bid tabulation
| Line | Pay item | Unit | Quantity | 1. Apac-Central, Inc. | 2. Atlas Asphalt, Inc. |
|---|---|---|---|---|---|
| 0001 | Tack coat (401011) | GAL | 300 | $3.15 | $5.00 |
| 0002 | Mineral aggregate in asphalt surface treatment (class 2) (402112) | TON | 694 | $35.00 | $64.97 |
| 0003 | Polymer modified cationic emulsified asphalt (CRS-2P) (solid polymer) (402214) | GAL | 15,863 | $4.80 | $4.24 |
| 0004 | Mineral aggregate in achm surface course (3/8") (407161) | TON | 187 | $160.00 | $131.06 |
| 0005 | Asphalt binder (PG 64-22) in achm surface course (3/8") (minimum bid $120.00) (407431) | TON | 13 | $120.00 | $120.00 |
| 0006 | Achm patching of existing roadway (415011) | TON | 40 | $200.00 | $175.00 |
| 0007 | Maintenance of traffic (603009) | LS | 1 | $2,500.00 | $5,000.00 |
| 0008 | Signs (604003) | SF | 164 | $37.73 | $7.00 |
| 0009 | Mobilization (unit bid amount may not exceed 5% of subtotal) (601001) | LS | 1 | $4,000.00 | $6,686.91 |
The pay item list has one row per line (item, description, unit, quantity, the low bidder's unit price), the flat layout estimating software imports. Pay items with a page of their own open their price history.
Source
Read from ARDOT's tabulation for this contract. ARDOT monthly bid tab PDFs (morning and afternoon sessions), January 2022 to November 2026. Base bids are printed in whole dollars; on A+B and A+C jobs the base bid is kept, and the published rank follows the award amount.
Every contract let that day: ARDOT letting of May 20, 2026. Compiled by Mirage Metrics.
Your own bid history, read the same way
Mirage deploys AI agents for heavy civil estimating teams: quantities from the plan set, specs and addenda read, and bid tabs compared, inside your systems and your rules.