Apac-Tennessee, Inc.: ARDOT bid record
Apac-Tennessee, Inc. submitted 34 bids on Arkansas DOT contracts in the data, from 16 FEB 2022 to 20 MAY 2026, and was the low bidder on 12 of them (35%). When it was not low, its total sat a median +45% above the low bid.
- Owner
- Arkansas DOT
- Low bid volume
- $67,622,982
- Latest bid
- 20 MAY 2026
- Data through
- 04 NOV 2026
By year
| Year | Bids | Low bids | Win rate |
|---|---|---|---|
| 2022 | 1 | 0 | 0% |
| 2023 | 6 | 5 | 83% |
| 2024 | 9 | 3 | 33% |
| 2025 | 12 | 3 | 25% |
| 2026 | 6 | 1 | 17% |
By county
| County | Bids | Low bids | Win rate |
|---|---|---|---|
| Crittenden | 12 | 7 | 58% |
| St. Francis | 4 | 2 | 50% |
| Lee | 3 | 1 | 33% |
| Crittenden, St. Francis | 2 | 1 | 50% |
| Monroe, St. Francis | 2 | 0 | 0% |
| Cross | 2 | 0 | 0% |
| Woodruff | 2 | 0 | 0% |
| Poinsett | 1 | 0 | 0% |
| Lee, St. Francis | 1 | 1 | 100% |
| Cross, Monroe, Woodruff | 1 | 0 | 0% |
| Lee, Phillips | 1 | 0 | 0% |
| Mississippi | 1 | 0 | 0% |
Pay items where it is most often lowest
| Pay item | Code | Unit | Lines bid | Lowest on the line | Its median price | All bidders' median |
|---|---|---|---|---|---|---|
| Asphalt binder (PG 64-22) in achm surface course (1/2") (minimum bid $120.00) | 407432 | TON | 17 | 13 (76%) | $120.00 | $120.00 |
| Construction pavement markings | 604041 | LF | 19 | 10 (53%) | $0.18 | $0.28 |
| Mineral aggregate in achm surface course (1/2") | 407162 | TON | 20 | 8 (40%) | $126.75 | $124.55 |
| Rumble stripes in asphalt shoulders | 642011 | LF | 13 | 7 (54%) | $0.12 | $0.14 |
| Raised pavement markers (type II) | 721002 | EACH | 19 | 6 (32%) | $4.20 | $6.50 |
| Rumble strips in asphalt shoulders | 642001 | LF | 7 | 6 (86%) | $0.11 | $0.19 |
| Approach gutters | 504264 | CY | 7 | 6 (86%) | $1,461.60 | $1,774.29 |
| Cold milling asphalt pavement | 412002 | SY | 19 | 5 (26%) | $8.60 | $8.00 |
| Centerline rumble stripes in asphalt roadways | 642102 | LF | 8 | 5 (63%) | $0.12 | $0.15 |
| Thermoplastic pavement marking yellow (6") | 719102 | LF | 16 | 4 (25%) | $0.67 | $0.85 |
| Thermoplastic pavement marking white (6") | 719002 | LF | 16 | 4 (25%) | $0.72 | $0.90 |
| Asphalt binder (PG 64-22) in achm binder course (1") (minimum bid $120.00) | 406402 | TON | 5 | 4 (80%) | $120.00 | $126.00 |
A line counts when the firm priced it and at least one other bidder did too; the lowest unit price on the line counts whoever won the contract. Token prices and bids over three times the low bid are left out.
Who it meets most
| Firm | Contracts in common | That firm ranked ahead |
|---|---|---|
| Atlas Asphalt, Inc. | 17 | 15 of 17 |
| Rogers Group, Inc. | 11 | 11 of 11 |
| M & T Paving & Const. Co., Inc. | 9 | 8 of 9 |
| Delta Asphalt of Arkansas, Inc. | 7 | 6 of 7 |
| Redstone Construction Group, Inc. | 6 | 4 of 6 |
| Sugg Construction, Inc. | 5 | 4 of 5 |
| Crisp Contractors, Inc. | 3 | 3 of 3 |
| BTG Enterprises, LLC | 3 | 2 of 3 |
| CK Asphalt, LLC | 3 | 3 of 3 |
| SN Contractors LLC | 2 | 0 of 2 |
Latest bids
| Let | Contract | County | Project | Rank | Its bid | Against the low bid |
|---|---|---|---|---|---|---|
| 20 MAY 2026 | A10052 | Lee, Monroe | THE PURPOSE OF THIS PROJECT IS TO OVERLAY APPROXIMATELY 4.776 MILES OF HIGHWAY 79 IN LEE AND MONROE COUNTIES. THIS PROJECT CONSISTS OF AGGRE | 5 of 5 | $1,226,962 | +45% |
| 20 MAY 2026 | SA4840 | Monroe | THE PURPOSE OF THIS PROJECT IS TO OVERLAY APPROXIMATELY 3.10 MILES OF BETHLEHEM RD. IN MONROE COUNTY. THIS PROJECT CONSISTS OF AGGREGATE BAS | 5 of 5 | $888,007 | +44% |
| 08 APR 2026 | 110876 | Crittenden | THE PURPOSE OF THIS PROJECT RESURFACE APPROXIMATELY 2.174 MILES ON INTERSTATE 40 IN CRITTENDEN COUNTY. THIS PROJECT CONSISTS OF AGGREGATE BA | 1 of 3 | $12,998,657 | Low, -4.0% under the second |
| 08 APR 2026 | A00074 | Mississippi | THE PURPOSE OF THIS PROJECT IS TO OVERLAY APPROXIMATELY 4.751 MILES OF HIGHWAY 140 IN MISSISSIPPI COUNTY. THIS PROJECT CONSISTS OF REMOVAL A | 3 of 3 | $5,483,415 | +33% |
| 04 MAR 2026 | A10031 | Lee, Phillips | THE PURPOSE OF THIS PROJECT IS TO MILL, OVERLAY, AND PLACE ULTRATHIN BONDED WEARING COURSE ON APPROXIMATELY 18.574 MILES OF HIGHWAYS 1 AND 1 | 2 of 2 | $6,041,003 | 0.0% |
| 21 JAN 2026 | A10051 | Crittenden | THE PURPOSE OF THIS PROJECT IS TO OVERLAY APPROXIMATELY 11.319 MILES OF HIGHWAYS 50 AND 64B IN CRITTENDEN COUNTY. THIS PROJECT CONSISTS OF T | 2 of 3 | $4,943,918 | +22% |
| 05 NOV 2025 | 110747 | Monroe, St. Francis | THE PURPOSE OF THIS PROJECT IS TO MILL AND OVERLAY 29.769 MILES OF INTERSTATE 40 IN MONORE AND SAINT FRANCIS COUNTIES. THIS PROJECT CONSISIT | 4 of 4 | $37,192,553 | +28% |
| 05 NOV 2025 | A10041 | Woodruff | THE PURPOSE OF THIS PROJECT IS TO OVERLAY APPROXIMATELY 7.125 MILES OF HIGHWAY 49 IN WOODRUFF COUNTY. THIS PROJECT CONSISTS OF AGGREGATE BAS | 6 of 6 | $2,268,536 | +57% |
| 05 NOV 2025 | A10050 | Cross, Monroe, Woodruff | THE PURPOSE OF THIS PROJECT IS TO LEVEL UP AND PLACE ULTRATHIN BONDED WEARING COURSE ON APPROXIMATELY 18.459 MILES OF HIGHWAY 49 IN CROSS, M | 5 of 5 | $5,378,809 | +41% |
| 09 APR 2025 | A10044 | St. Francis | THE PURPOSE OF THIS PROJECT IS TO OVERLAY APPROXIMATELY 2.384 MILES OF HIGHWAY 38 IN WIDENER IN ST. FRANCIS COUNTY. THIS PROJECT CONSISTS OF | 2 of 3 | $1,111,756 | +5.0% |
| 09 APR 2025 | A10047 | Crittenden | THE PURPOSE OF THIS PROJECT IS TO OVERLAY APPROXIMATELY 8.811 MILES OF HIGHWAY 131 IN CRITTENDEN COUNTY. THIS PROJECT CONSISTS OF REMOVAL AN | 2 of 2 | $2,877,776 | +10% |
| 09 APR 2025 | SA1843 | Crittenden | THE PURPOSE OF THIS PROJECT IS TO OVERLAY APPROXIMATELY 3.12 MILES OF COUNTY ROADS 305 AND 12 IN CRITTENDEN COUNTY. THIS PROJECT CONSISTS OF | 1 of 2 | $784,105 | Low, 8.0% under the second |
| 26 FEB 2025 | A10045 | St. Francis | THE PURPOSE OF THIS PROJECT IS TO LEVEL AND OVERLAY APPROXIMATELY 14.379 MILES OF HIGHWAY 50 IN ST. FRANCIS COUNTY. THIS PROJECT CONSISTS OF | 1 of 2 | $4,800,417 | Low, 5.0% under the second |
| 26 FEB 2025 | A10046 | Lee, St. Francis | THE PURPOSE OF THIS PROJECT IS TO MILL AND OVERLAY APPROXIMATELY 13.087 MILES OF HIGHWAY 79 IN LEE AND ST. FRANCIS COUNTIES. THIS PROJECT CO | 1 of 2 | $4,469,411 | Low, 4.0% under the second |
| 15 JAN 2025 | A10040 | Woodruff | THE PURPOSE OF THIS PROJECT IS TO MILL AND OVERLAY APPROXIMATELY 7.084 MILES OF HIGHWAY 38 IN WOODRUFF COUNTY. THIS PROJECT CONSISTS OF REMO | 4 of 6 | $1,764,327 | +21% |
| 15 JAN 2025 | C18020 | Crittenden | THE PURPOSE OF THIS PROJECT IS TO SURFACE APPROXIMATELY 0.21 MILES OF VARIOUS CITY STREETS IN THE CITY OF ANTHONYVILLE AND OVERLAY APPROXIMA | 6 of 6 | $464,340 | +70% |
| 15 JAN 2025 | C76080 | Crittenden, St. Francis | THE PURPOSE OF THIS PROJECT IS TO OVERLAY APPROXIMATELY 0.78 MILE OF VARIOUS CITY STREETS IN THE CITY OF HUGHES IN ST. FRANCIS COUNTY, SURFA | 6 of 6 | $1,679,691 | +64% |
| 15 JAN 2025 | SA1940 | Cross | THE PURPOSE OF THIS PROJECT IS TO OVERLAY APPROXIMATELY 2.43 MILES OF COUNTY ROAD 96 IN CROSS COUNTY. THIS PROJECT CONSISTS OF AGGREGATE BAS | 6 of 6 | $704,833 | +74% |
| 06 NOV 2024 | A10028 | Crittenden | THE PURPOSE OF THIS PROJECT IS TO MILL AND OVERLAY APPROXIMATELY 10.041 MILES OF HIGHWAY 147 IN CRITTENDEN COUNTY. THIS PROJECT CONSISTS OF | 2 of 2 | $5,260,400 | +8.0% |
| 06 NOV 2024 | A10029 | Cross | THE PURPOSE OF THIS PROJECT IS TO LEVEL AND OVERLAY APPROXIMATELY 3.528 MILES OF HIGHWAY 42 IN CROSS COUNTY. THIS PROJECT CONSISTS OF REMOVA | 4 of 4 | $2,274,301 | +54% |
| 06 NOV 2024 | A00066 | Poinsett | THE PURPOSE OF THIS PROJECT IS TO LEVEL AND THIN OVERLAY APPROXIMATELY 3.103 MILES OF HIGHWAY 49 IN POINSETT COUNTY. THIS PROJECT CONSISTS O | 4 of 4 | $1,353,181 | +77% |
| 18 SEP 2024 | 110720 | Crittenden | THE PURPOSE OF THIS PROJECT IS TO REHABILITATE APPROXIMATELY 1.200 MILES OF HIGHWAY 191 IN WEST MEMPHIS IN CRITTENDEN COUNTY. THIS PROJECT C | 1 of 3 | $1,827,162 | Low, 14% under the second |
| 10 APR 2024 | A10020 | Lee | THE PURPOSE OF THIS PROJECT IS TO MILL AND OVERLAY APPROXIMATELY 4.713 MILES ON HIGHWAY 1 AND OVERLAY APPROXIMATELY 0.606 MILES OF HIGHWAY 4 | 1 of 1 | $4,428,661 | Low |
| 28 FEB 2024 | A10027 | Crittenden | THE PURPOSE OF THIS PROJECT IS TO LEVEL, OVERLAY, AND PLACE ULTRATHIN BONDED WEARING COURSE ON APPROXIMATELY 12.740 MILES OF HIGHWAY 77 IN C | 1 of 1 | $5,496,407 | Low |
| 28 FEB 2024 | C76082 | Monroe, St. Francis | THE PURPOSE OF THIS PROJECT IS TO OVERLAY APPROXIMATELY 2.04 MILE OF VARIOUS CITY STREETS IN THE CITY OF FORREST CITY IN ST. FRANCIS COUNTY | 3 of 3 | $1,598,186 | +47% |
How this record was read
ARDOT monthly bid tab PDFs (morning and afternoon sessions), January 2022 to November 2026. Base bids are printed in whole dollars; on A+B and A+C jobs the base bid is kept, and the published rank follows the award amount.
- Every bid counted here matched its published total to within one dollar; ARDOT's rank decides who was low.
- The gap to the low bid is the firm's total over the low total, minus one, on contracts it did not win, leaving out bids over three times the low bid.
- A record covers the lettings in the data, not every contract the firm ever bid. Coverage by year is on the state page.
A name split in two, or a figure that does not match the owner's tabulation? Write to mehdi@miragemetrics.com and we correct it.
Your own bid history, read the same way
Mirage deploys AI agents for heavy civil estimating teams: quantities from the plan set, specs and addenda read, and bid tabs compared, inside your systems and your rules.