ARDOT contract A10051 bid tabulation

THE PURPOSE OF THIS PROJECT IS TO OVERLAY APPROXIMATELY 11.319 MILES OF HIGHWAYS 50 AND 64B IN CRITTENDEN COUNTY. THIS PROJECT CONSISTS OF TRENCHING AND SHOULDER PREPARATION, AGGREGATE BASE COURSE, ACHM BINDER AND SURFACE COURSES, COLD MILLING ASPHALT PAVEMENT, ACHM PATCHING OF EXISTING ROADWAY, MAINTENANCE OF TRAFFIC, EROSION CONTROL, RUMBLE STRIPES, PAVEMENT MARKING, AND MISC. ITEMS. Let by Arkansas DOT on January 21, 2026, Crittenden. 3 bids received; low bid $4,066,218 by Delta Asphalt of Arkansas, Inc..

Owner
Arkansas DOT
Letting
21 JAN 2026
Pay items
25
Data through
04 NOV 2026

Bidders

RankBidderTotal bidAgainst the low bid
1Delta Asphalt of Arkansas, Inc.$4,066,218Low
2Apac-Tennessee, Inc.$4,943,918+22%
3M & T Paving & Const. Co., Inc.$5,050,875+24%
ARDOT contract A10051: bids by rank

Bid tabulation

LinePay itemUnitQuantity1. Delta Asphalt of Arkansas, Inc.2. Apac-Tennessee, Inc.3. M & T Paving & Const. Co., Inc.
0001Trenching and shoulder preparation (215011)STA566$42.03$83.00$82.10
0002Aggregate base course (class 7) (303117)TON4,260$30.71$57.75$61.13
0003Tack coat (401011)GAL46,499$0.01$0.01$0.01
0004Mineral aggregate in achm binder course (1") (406161)TON5,504$88.60$113.50$120.26
0005Asphalt binder (PG 64-22) in achm binder course (1") (minimum bid $120.00) (406402)TON278$120.00$120.00$120.26
0006Mineral aggregate in achm surface course (3/8") (407161)TON859$99.85$135.00$145.07
0007Mineral aggregate in achm surface course (1/2") (407162)TON26,539$91.73$107.00$115.63
0008Asphalt binder (PG 64-22) in achm surface course (3/8") (minimum bid $120.00) (407431)TON59$120.00$120.00$145.07
0009Asphalt binder (PG 64-22) in achm surface course (1/2") (minimum bid $120.00) (407432)TON1,664$120.00$120.00$120.00
0010Cold milling asphalt pavement (412002)SY8,705$4.51$7.50$7.65
0011Achm patching of existing roadway (415011)TON1,150$144.92$235.00$234.51
0012Maintenance of traffic (603009)LS1$80,000$100,000$107,200
0013Signs (604003)SF637$6.50$10.00$6.50
0014Construction pavement markings (604041)LF188,061$0.17$0.17$0.17
0015Lime (620001)TON1$225.00$100.00$10.00
0016Seeding (620011)ACRE0.50$3,875.80$1,350.00$10.00
0017Mulch cover (620022)ACRE0.50$3,875.80$1,050.00$10.00
0018Water (620030)MGAL51$10.00$10.00$10.00
0019Silt fence (621021)LF1,000$4.39$3.25$0.10
0020Roadway construction control (635011)LS1$40,000$25,000$3,000.00
0021Rumble stripes in asphalt shoulders (642011)LF104,144$0.14$0.12$0.12
0022Thermoplastic pavement marking white (6") (719002)LF111,586$0.60$0.60$0.60
0023Thermoplastic pavement marking yellow (6") (719102)LF38,238$0.60$0.60$0.60
0024Raised pavement markers (type II) (721002)EACH917$4.00$4.00$4.00
0025Mobilization (unit bid amount may not exceed 5% of subtotal) (601001)LS1$184,000$220,000$57,345
ARDOT contract A10051: unit prices by line

The pay item list has one row per line (item, description, unit, quantity, the low bidder's unit price), the flat layout estimating software imports. Pay items with a page of their own open their price history.

Source

Read from ARDOT's tabulation for this contract. ARDOT monthly bid tab PDFs (morning and afternoon sessions), January 2022 to November 2026. Base bids are printed in whole dollars; on A+B and A+C jobs the base bid is kept, and the published rank follows the award amount.

Every contract let that day: ARDOT letting of January 21, 2026. Compiled by Mirage Metrics.

Your own bid history, read the same way

Mirage deploys AI agents for heavy civil estimating teams: quantities from the plan set, specs and addenda read, and bid tabs compared, inside your systems and your rules.

We use your email to reply to you and, now and then, to tell you about Mirage. You can opt out at any time. Privacy policy