ARDOT contract A10051 bid tabulation
THE PURPOSE OF THIS PROJECT IS TO OVERLAY APPROXIMATELY 11.319 MILES OF HIGHWAYS 50 AND 64B IN CRITTENDEN COUNTY. THIS PROJECT CONSISTS OF TRENCHING AND SHOULDER PREPARATION, AGGREGATE BASE COURSE, ACHM BINDER AND SURFACE COURSES, COLD MILLING ASPHALT PAVEMENT, ACHM PATCHING OF EXISTING ROADWAY, MAINTENANCE OF TRAFFIC, EROSION CONTROL, RUMBLE STRIPES, PAVEMENT MARKING, AND MISC. ITEMS. Let by Arkansas DOT on January 21, 2026, Crittenden. 3 bids received; low bid $4,066,218 by Delta Asphalt of Arkansas, Inc..
- Owner
- Arkansas DOT
- Letting
- 21 JAN 2026
- Pay items
- 25
- Data through
- 04 NOV 2026
Bidders
| Rank | Bidder | Total bid | Against the low bid |
|---|---|---|---|
| 1 | Delta Asphalt of Arkansas, Inc. | $4,066,218 | Low |
| 2 | Apac-Tennessee, Inc. | $4,943,918 | +22% |
| 3 | M & T Paving & Const. Co., Inc. | $5,050,875 | +24% |
Bid tabulation
| Line | Pay item | Unit | Quantity | 1. Delta Asphalt of Arkansas, Inc. | 2. Apac-Tennessee, Inc. | 3. M & T Paving & Const. Co., Inc. |
|---|---|---|---|---|---|---|
| 0001 | Trenching and shoulder preparation (215011) | STA | 566 | $42.03 | $83.00 | $82.10 |
| 0002 | Aggregate base course (class 7) (303117) | TON | 4,260 | $30.71 | $57.75 | $61.13 |
| 0003 | Tack coat (401011) | GAL | 46,499 | $0.01 | $0.01 | $0.01 |
| 0004 | Mineral aggregate in achm binder course (1") (406161) | TON | 5,504 | $88.60 | $113.50 | $120.26 |
| 0005 | Asphalt binder (PG 64-22) in achm binder course (1") (minimum bid $120.00) (406402) | TON | 278 | $120.00 | $120.00 | $120.26 |
| 0006 | Mineral aggregate in achm surface course (3/8") (407161) | TON | 859 | $99.85 | $135.00 | $145.07 |
| 0007 | Mineral aggregate in achm surface course (1/2") (407162) | TON | 26,539 | $91.73 | $107.00 | $115.63 |
| 0008 | Asphalt binder (PG 64-22) in achm surface course (3/8") (minimum bid $120.00) (407431) | TON | 59 | $120.00 | $120.00 | $145.07 |
| 0009 | Asphalt binder (PG 64-22) in achm surface course (1/2") (minimum bid $120.00) (407432) | TON | 1,664 | $120.00 | $120.00 | $120.00 |
| 0010 | Cold milling asphalt pavement (412002) | SY | 8,705 | $4.51 | $7.50 | $7.65 |
| 0011 | Achm patching of existing roadway (415011) | TON | 1,150 | $144.92 | $235.00 | $234.51 |
| 0012 | Maintenance of traffic (603009) | LS | 1 | $80,000 | $100,000 | $107,200 |
| 0013 | Signs (604003) | SF | 637 | $6.50 | $10.00 | $6.50 |
| 0014 | Construction pavement markings (604041) | LF | 188,061 | $0.17 | $0.17 | $0.17 |
| 0015 | Lime (620001) | TON | 1 | $225.00 | $100.00 | $10.00 |
| 0016 | Seeding (620011) | ACRE | 0.50 | $3,875.80 | $1,350.00 | $10.00 |
| 0017 | Mulch cover (620022) | ACRE | 0.50 | $3,875.80 | $1,050.00 | $10.00 |
| 0018 | Water (620030) | MGAL | 51 | $10.00 | $10.00 | $10.00 |
| 0019 | Silt fence (621021) | LF | 1,000 | $4.39 | $3.25 | $0.10 |
| 0020 | Roadway construction control (635011) | LS | 1 | $40,000 | $25,000 | $3,000.00 |
| 0021 | Rumble stripes in asphalt shoulders (642011) | LF | 104,144 | $0.14 | $0.12 | $0.12 |
| 0022 | Thermoplastic pavement marking white (6") (719002) | LF | 111,586 | $0.60 | $0.60 | $0.60 |
| 0023 | Thermoplastic pavement marking yellow (6") (719102) | LF | 38,238 | $0.60 | $0.60 | $0.60 |
| 0024 | Raised pavement markers (type II) (721002) | EACH | 917 | $4.00 | $4.00 | $4.00 |
| 0025 | Mobilization (unit bid amount may not exceed 5% of subtotal) (601001) | LS | 1 | $184,000 | $220,000 | $57,345 |
The pay item list has one row per line (item, description, unit, quantity, the low bidder's unit price), the flat layout estimating software imports. Pay items with a page of their own open their price history.
Source
Read from ARDOT's tabulation for this contract. ARDOT monthly bid tab PDFs (morning and afternoon sessions), January 2022 to November 2026. Base bids are printed in whole dollars; on A+B and A+C jobs the base bid is kept, and the published rank follows the award amount.
Every contract let that day: ARDOT letting of January 21, 2026. Compiled by Mirage Metrics.
Your own bid history, read the same way
Mirage deploys AI agents for heavy civil estimating teams: quantities from the plan set, specs and addenda read, and bid tabs compared, inside your systems and your rules.