ARDOT letting results, January 21, 2026

53 contracts let by Arkansas DOT on January 21, 2026, $150,200,330 in low bids, a median of 3 bidders per contract.

Owner
Arkansas DOT
Contracts
53
Low bids, total
$150,200,330
Data through
04 NOV 2026

Contracts let that day

ContractProjectCountyBidsLow bidderLow bidSecond bidGapSource
061371THE PURPOSE OF THIS PROJECT IS TO RECONFIGURE THE HIGHWAY 5 INTERCHANGE AND REPLACE ONE STRUCTURE OVER I-57 IN LONOKE COUNTY. THIS PROJECT CONSISTS OF CLEARING Lonoke4Weaver-Bailey Contractors, Inc.$53,972,317$55,391,633+3.0%ARDOT
AX0008THE PURPOSE OF THIS PROJECT IS TO MILL, OVERLAY, AND DIAMOND GRIND ENTRANCE AND EXIT RAMPS ALONG I-57 IN JACKSON, LONOKE, AND WHITE COUNTIES. THIS PROJECT CONSIJackson, Lonoke, White3Rogers Group, Inc.$13,857,556$14,516,781+5.0%ARDOT
A90043THE PURPOSE OF THIS PROJECT IS TO OVERLAY APPROXIMATELY 20.315 MILES OF HIGHWAY 412 IN CARROLL AND MADISON COUNTIES. THIS PROJECT CONSISTS OF AGGREGATE BASE COUCarroll, Madison2Atlas Asphalt, Inc.$7,322,883$8,213,795+12%ARDOT
A70035THE PURPOSE OF THIS PROJECT IS TO OVERLAY APPROXIMATELY 18.322 MILES OF HIGHWAY 8 IN DALLAS COUNTY. THIS PROJECT CONSISTS OF REMOVAL AND DISPOSAL OF GUARDRAIL, Dallas2Jet Asphalt & Rock Co., Inc.$6,396,427$6,542,424+2.0%ARDOT
100881THE PURPOSE OF THIS PROJECT IS TO WIDEN HIGHWAY 1B TO FIVE LANES IN CRAIGHEAD COUNTY. THIS PROJECT CONSISTS OF CLEARING AND GRUBBING, REMOVAL AND DISPOSAL ITEMSCraighead3Rogers Group, Inc.$5,870,408$6,095,468+4.0%ARDOT
A20038THE PURPOSE OF THIS PROJECT IS TO MILL AND OVERLAY APPROXIMATELY 8.277 MILES OF HIGHWAY 167 IN GRANT COUNTY. THIS PROJECT CONSISTS OF AGGREGATE BASE COURSE, ACHGrant2Cranford Construction Co.$5,267,592$6,456,216+23%ARDOT
A60057THE PURPOSE OF THIS PROJECT IS TO OVERLAY APPROXIMATELY 13.441 MILES OF HIGHWAY 63 IN PRAIRIE COUNTY. THIS PROJECT CONSISTS OF AGGREGATE BASE COURSE, ACHM SURFAPrairie5Rogers Group, Inc.$4,808,215$5,333,864+11%ARDOT
A40047THE PURPOSE OF THIS PROJECT IS TO MILL, OVERLAY, AND SCRUB SEAL APPROXIMATELY 12.878 MILES OF HIGHWAY 16 IN WASHINGTON COUNTY. THIS PROJECT CONSISTS OF TRENCHINWashington3Grant Garrett Excavating, Inc.$4,798,314$5,445,157+13%ARDOT
A30039THE PURPOSE OF THIS PROJECT IS TO OVERLAY APPROXIMATELY 11.417 MILES OF HIGHWAY 371 IN NEVADA COUNTY. THIS PROJECT CONSISTS OF AGGREGATE BASE COURSE, ACHM SURFANevada2Cranford Construction Co.$4,752,638$5,040,830+6.0%ARDOT
A80042THE PURPOSE OF THIS PROJECT IS TO MILL AND OVERLAY APPROXIMATELY 9.025 MILES OF HIGHWAYS 7 AND 27 IN YELL COUNTY. THIS PROJECT CONSISTS OF REMOVAL AND DISPOSAL Yell1Blackstone Construction, LLC$4,617,183ARDOT
A80046THE PURPOSE OF THIS PROJECT IS TO OVERLAY APPROXIMATELY 12.513 MILES OF HIGHWAY 225 IN FAULKNER COUNTY. THIS PROJECT CONSISTS OF CLEARING AND GRUBBING, REMOVAL Faulkner2Rogers Group, Inc.$4,070,029$4,758,439+17%ARDOT
A10051THE PURPOSE OF THIS PROJECT IS TO OVERLAY APPROXIMATELY 11.319 MILES OF HIGHWAYS 50 AND 64B IN CRITTENDEN COUNTY. THIS PROJECT CONSISTS OF TRENCHING AND SHOULDECrittenden3Delta Asphalt of Arkansas, Inc.$4,066,218$4,943,918+22%ARDOT
A30040THE PURPOSE OF THIS PROJECT IS TO OVERLAY APPROXIMATELY 7.639 MILES OF HIGHWAY 27 IN PIKE COUNTY. THIS PROJECT CONSISTS OF REMOVAL AND DISPOSAL ITEMS, AGGREGATEPike3Blackstone Construction, LLC$3,051,326$3,080,681+1.0%ARDOT
FA1108THE PURPOSE OF THIS PROJECT IS TO REPLACE 1 BRIDGE AND RECONSTRUCT APPROXIMATELY 1.01 MILES OF COUNTRY ROAD 53 IN CLAY COUNTY. THIS PROJECT CONSISTS OF CLEARINGClay7Delta Asphalt of Arkansas, Inc.$2,967,542$3,067,778+3.0%ARDOT
A00092THE PURPOSE OF THIS PROJECT IS TO MILL AND OVERLAY APPROXIMATELY 3.613 MILES OF HIGHWAY 18 IN MISSISSIPPI COUNTY. THIS PROJECT CONSISTS OF ACHM SURFACE COURSE, Mississippi2Delta Asphalt of Arkansas, Inc.$2,084,107$2,911,212+40%ARDOT
061920THE PURPOSE OF THIS PROJECT IS TO PLACE ULTRATHIN BONDED WEARING COURSE ON APPROXIMATELY 6.235 MILES ON VARIOUS SECTIONS IN VARIOUS COUNTIES. THIS PROJECT CONSIVarious2Redstone Construction Group, Inc.$1,799,733$1,823,147+1.0%ARDOT
A80041THE PURPOSE OF THIS PROJECT IS TO LEVEL AND OVERLAY APPROXIMATELY 5.290 MILES OF HIGHWAY 154 IN CONWAY COUNTY. THIS PROJECT CONSISTS OF AGGREGATE SURFACE COURSEConway3Blackstone Construction, LLC$1,370,692$1,454,747+6.0%ARDOT
012550THE PURPOSE OF THIS PROJECT IS TO INSTALL RAISED PAVEMENT MARKERS ON VARIOUS ROUTES IN VARIOUS COUNTIES. THIS PROJECT CONSISTS OF MAINTENANCE OF TRAFFIC, RAISEDVarious5Highway Graphics, L.L.C.$1,291,187$1,321,794+2.0%ARDOT
012552THE PURPOSE OF THIS PROJECT IS TO INSTALL RAISED PAVEMENT MARKERS ON VARIOUS ROUTES IN VARIOUS COUNTIES. THIS PROJECT CONSISTS OF MAINTENANCE OF TRAFFIC, RAISEDVarious4Contractor'S Specialty Service Co.$1,202,684$1,219,229+1.0%ARDOT
A00091THE PURPOSE OF THIS PROJECT IS TO MILL AND OVERLAY APPROXIMATELY 3.899 MILES OF HIGHWAY 1 IN POINSETT COUNTY. THIS PROJECT CONSISTS OF ACHM SURFACE COURSE, COLDPoinsett4Atlas Asphalt, Inc.$1,195,815$1,333,011+11%ARDOT
012542THE PURPOSE OF THIS PROJECT IS TO LAY A HIGH FRICTION SURFACE TREATMENT ON APPROXIMATELY 3.348 MILES ON VARIOUS SECTIONS IN VARIOUS COUNTIES. THIS PROJECT CONSIVarious3The Truesdell Corporation$1,139,139$1,156,534+2.0%ARDOT
SA7041THE PURPOSE OF THIS PROJECT IS TO OVERLAY APPROXIMATELY 3.97 MILES OF CO. RD. 2 (WESSON RD.) IN UNION COUNTY. THIS PROJECT CONSISTS OF ACHM SURFACE COURSE, MAINUnion1Jet Asphalt & Rock Co., Inc.$981,119ARDOT
C76095THE PURPOSE OF THIS PROJECT IS TO OVERLAY APPROXIMATELY 0.75 MILE OF VARIOUS CITY STREETS IN THE CITY OF GOULD AND APPROXIMATELY 1.49 MILES OF VARIOUS CITY STREDrew, Lincoln2Pine Bluff Sand & Gravel Co.$840,891$866,966+3.0%ARDOT
C73018THE PURPOSE OF THIS PROJECT IS TO OVERLAY 1.95 MILES OF VARIOUS CITY STREETS IN GARNER, 2.25 MILES OF VARIOUS CITY STREETS IN JUDSONIA, AND 2.12 MILES OF VARIOUWhite4CK Asphalt, LLC$836,167$917,949+10%ARDOT
C10008THE PURPOSE OF THIS PROJECT IS TO OVERLAY AND SURFACE APPROXIMATELY 1.06 MILES OF VARIOUS CITY STREETS IN THE CITY OF GUM SPRINGS, OVERLAY APPROXIMATELY 1.04 MIClark4Salt Creek Paving & Const. Co., Inc.$813,515$832,258+2.0%ARDOT
SA7140THE PURPOSE OF THIS PROJECT IS TO OVERLAY APPROXIMATELY 4.95 MILES OF BANNER MOUNTAIN ROAD IN VAN BUREN COUNTY. THIS PROJECT CONSISTS OF AGGREGATE SURFACE COURSVan Buren2Rogers Group, Inc.$811,586$818,195+1.0%ARDOT
A60059THE PURPOSE OF THIS PROJECT IS TO MILL AND OVERLAY APPROXIMATELY 1.787 MILES OF HIGHWAY 70 IN PULASKI COUNTY. THIS PROJECT CONSISTS OF ACHM SURFACE COURSE, COLDPulaski2Cranford Construction Co.$810,825$997,441+23%ARDOT
C42007THE PURPOSE OF THIS PROJECT IS TO OVERLAY AND SURFACE APPROXIMATELY 1.23 MILES OF VARIOUS CITY STREETS IN THE CITY OF BLUE MOUNTAIN, OVERLAY APPROXIMATELY 0.95 Logan4Blackstone Construction, LLC$718,829$731,914+2.0%ARDOT
C75007THE PURPOSE OF THIS PROJECT IS TO OVERLAY APPROXIMATELY 1.93 MILES OF VARIOUS CITY STREETS IN THE CITY OF BELLEVILLE, OVERLAY AND SURFACE APPROXIMATELY 0.68 MILYell1Blackstone Construction, LLC$645,813ARDOT
C04029THE PURPOSE OF THIS PROJECT IS TO OVERLAY APPROXIMATELY 1.12 MILES OF VARIOUS CITY STREETS IN THE CITY OF BELLA VISTA & 2.25 MILES IN THE CITY OF HIGHFILL IN BEBenton4Emery Sapp & Sons, Inc.$532,629$544,883+2.0%ARDOT
C76091THE PURPOSE OF THIS PROJECT IS TO OVERLAY APPROXIMATELY 1.01 MILES OF VARIOUS CITY STREETS IN THE CITY OF HAYNES IN LEE COUNTY, AND OVERLAY AND SURFACE APPROXIMLee, St. Francis3Atlas Asphalt, Inc.$525,395$543,090+3.0%ARDOT
SA3550THE PURPOSE OF THIS PROJECT IS TO OVERLAY APPROXIMATELY 2.80 MILES OF ISLAND HARBOR MARINA DR. IN JEFFERSON COUNTY. THIS PROJECT CONSISTS OF ACHM SURFACE COURSEJefferson1Pine Bluff Sand & Gravel Co.$510,239ARDOT
C47022THE PURPOSE OF THIS PROJECT IS TO OVERLAY APPROXIAMATELY 1.16 MILES OF VARIOUS CITY STREETS IN BLYTHEVILLE AND APPROXIMATELY 1.60 MILES OF VARIOUS CITY STREETS Mississippi3Sugg Construction, Inc.$508,935$530,824+4.0%ARDOT
SA0654THE PURPOSE OF THIS PROJECT IS TO LEVEL AND RESEAL APPROXIMATELY 8.76 MILES ON COUNTY ROADS 1, 55, & 57 IN BRADLEY COUNTY. THIS PROJECT CONSISTS OF ACHM SURFACEBradley2Salt Creek Paving & Const. Co., Inc.$482,950$498,037+3.0%ARDOT
C19007THE PURPOSE OF THIS PROJECT IS TO OVERLAY AND SURFACE APPROXIMATELY 0.97 MILE OF VARIOUS CITY STREETS IN THE CITY OF CHERRY VALLEY AND 1.63 MILES OF VARIOUS CITCross5Sugg Construction, Inc.$454,684$467,033+3.0%ARDOT
C25005THE PURPOSE OF THIS PROJECT IS TO OVERLAY APPROXIMATELY 1.25 MILES OF VARIOUS CITY STREETS IN THE CITY OF SALEM AND APPROXIMATELY 1.55 MILES OF VARIOUS CITY STRFulton2Atlas Asphalt, Inc.$436,753$450,537+3.0%ARDOT
C76094THE PURPOSE OF THIS PROJECT IS TO SURFACE APPROXIMATELY 0.43 MILE OF HILBURN POINT ROAD IN THE CITY OF ALTUS IN FRANKLIN COUNTY AND TO OVERLAY APPROXIMATELY 1.0Franklin, Johnson2Blackstone Construction, LLC$379,851$463,353+22%ARDOT
030656THE PURPOSE OF THIS PROJECT IS TO PLACE ULTRATHIN BONDED WEARING COURSE ON APPROXIMATELY 1.94 MILES ON I-30 IN HEMPSTEAD COUNTY. THIS PROJECT CONSISTS OF ULTRATHempstead2Redstone Construction Group, Inc.$367,213$435,309+19%ARDOT
C76093THE PURPOSE OF THIS PROJECT IS TO OVERLAY AND SURFACE APPROXIMATELY 1.55 MILES OF VARIOUS CITY STREETS IN THE CITY OF AMAGON IN JACKSON COUNTY AND 1.02 MILES OFCraighead, Jackson5Atlas Asphalt, Inc.$363,830$371,308+2.0%ARDOT
C37007THE PURPOSE OF THIS PROJECT IS TO OVERLAY APPROXIMATELY 0.83 MILE OF VARIOUS CITY STREETS IN THE CITY OF BRADLEY IN LAFAYETTE COUNTY. THIS PROJECT CONSISTS OF BLafayette2Cranford Construction Co.$338,571$426,493+26%ARDOT
C55003THE PURPOSE OF THIS PROJECT IS TO OVERLAY APPROXIMATELY 1.66 MILES OF VARIOUS CITY STREETS IN THE CITY OF DELIGHT, LOCATED IN PIKE COUNTY. THIS PROJECT CONSISTSPike4Blackstone Construction, LLC$327,642$345,238+5.0%ARDOT
C05010THE PURPOSE OF THIS PROJECT IS TO OVERLAY APPROXIMATELY 1.05 MILES OF VARIOUS CITY STREETS IN THE CITY OF BELLEFONTE AND 0.67 MILE OF VARIOUS CITY STREETS IN THBoone2Apac-Central, Inc.$303,035$458,883+51%ARDOT
C07003THE PURPOSE OF THIS PROJECT IS TO SURFACE APPROXIMATELY 0.87 MILE OF VARIOUS CITY STREETS IN THE CITY OF HARRELL IN CALHOUN COUNTY. THIS PROJECT CONSISTS OF AGGCalhoun1Smackover Paving Co.$297,688ARDOT
SA6146THE PURPOSE OF THIS PROJECT IS TO OVERLAY APPROXIMATELY 2.00 MILES OF CO. RDS. 2 AND 16 IN RANDOLPH COUNTY. THIS PROJECT CONSISTS OF AGGREGATE BASE COURSE, ACHMRandolph5Atlas Asphalt, Inc.$250,965$267,804+7.0%ARDOT
C18021THE PURPOSE OF THIS PROJECT IS TO OVERLAY APPROXIMATELY 1.84 MILES OF VARIOUS CITY STREETS IN THE CITY OF HORSESHOE LAKE IN CRITTENDEN COUNTY. THIS PROJECT CONSCrittenden3M & T Paving & Const. Co., Inc.$246,085$247,618+1.0%ARDOT
SA4284THE PURPOSE OF THIS PROJECT IS TO LEVEL AND RESEAL APPROXIMATELY 4.10 MILES ON COUNTY ROAD 92 IN LOGAN COUNTY. THIS PROJECT CONSISTS OF ACHM SURFACE COURSE, RESLogan2Salt Creek Paving & Const. Co., Inc.$237,470$328,707+38%ARDOT
C60015THE PURPOSE OF THIS PROJECT IS TO OVERLAY APPROXIMATELY 0.67 MILE OF MAIN STREET IN THE CITY OF NORTH LITTLE ROCK IN PULASKI COUNTY. THIS PROJECT CONSISTS OF ACPulaski2Cranford Construction Co.$231,410$299,601+29%ARDOT
C45008THE PURPOSE OF THIS PROJECT IS TO OVERLAY APPROXIMATELY 1.27 MILES OF VARIOUS CITY STREETS IN THE CITY OF BULL SHOALS IN MARION COUNTY. THIS PROJECT CONSISTS OFMarion2Apac-Central, Inc.$224,809$236,586+5.0%ARDOT
C53009THE PURPOSE OF THIS PROJECT IS TO OVERLAY APPROXIMATELY 1.13 MILES OF VARIOUS CITY STREETS IN THE CITY OF PERRY IN PERRY COUNTY. THIS PROJECT CONSISTS OF AGGREGPerry3CK Asphalt, LLC$187,870$189,686+1.0%ARDOT
SA2045THE PURPOSE OF THIS PROJECT IS TO OVERLAY APPROXIMATELY 1.02 MILES OF CO. RD. 236 IN DALLAS COUNTY. THIS PROJECT CONSISTS OF ACHM SURFACE COURSE, MAINTENANCE OFDallas4Cranford Construction Co.$178,286$187,122+5.0%ARDOT
C32011THE PURPOSE OF THIS PROJECT IS TO OVERLAY APPROXIMATELY 1.45 MILES OF VARIOUS CITY STREETS IN THE CITY OF OIL TROUGH IN INDEPENDENCE COUNTY. THIS PROJECT CONSISIndependence3Atlas Asphalt, Inc.$176,146$190,281+8.0%ARDOT
C38015THE PURPOSE OF THIS PROJECT IS TO OVERLAY APPROXIMATELY 1.52 MILES OF VARIOUS CITY STREETS IN THE CITY OF STRAWBERRY, LOCATED IN LAWRENCE COUNTY. THIS PROJECT CLawrence4Atlas Asphalt, Inc.$171,095$194,148+13%ARDOT
C33011THE PURPOSE OF THIS PROJECT IS TO SURFACE APPROXIMATELY 0.29 MILE OF KENT MILLER ROAD IN THE CITY OF GUION IN IZARD COUNTY. THIS PROJECT CONSISTS OF AGGREGATE BIzard1Atlas Asphalt, Inc.$106,029ARDOT
ARDOT contracts let on January 21, 2026, largest low bid first

Gap is the second bid over the low bid. Where a contract shows fewer bids than ARDOT received, the others did not match their published totals and are left out. Each contract number opens its full bid tabulation.

Your own bid history, read the same way

Mirage deploys AI agents for heavy civil estimating teams: quantities from the plan set, specs and addenda read, and bid tabs compared, inside your systems and your rules.

We use your email to reply to you and, now and then, to tell you about Mirage. You can opt out at any time. Privacy policy